List of Commission's Orders / Judgments passed in various cases.





Sr.No. Petition No. Filed By Subject Matter Date of Final Decision
1 Review Petition No. 1 of 2017 in Petition No. 55 of 2016 (Suo-Motu) Biomass Power Producers Association Review Petition under Section 94(1)(f) of the Electricity Act, 2003 read with Regulation 64 (Chapter XIII) of the PSERC (Conduct of Business) Regulations, 2005 for Review of para 13 of the Commission’s Order dated 23.11.2016 (Petition No. 55 of 2016-Suo Motu) deciding generic levellised generation tariff for Renewable Energy Biomass and 100% Rice straw based Power Projects for FY 2016-17. 09.08.2017
 
2 Review Petition No. 2 of 2017 in Petition No. 53 of 2016 Punjab State Power Corporation Limited Review Petition under Section 94 (1) (f) of the Electricity Act, 2003 read with Regulation 64 of the Punjab State Electricity Regulatory Commission (Conduct of Business) Regulations, 2005 read with Order 47, Rule 1 of Code of Civil Procedure, 1908 for Review of Order dated 06.12.2016 in petition no. 53 of 2016 passed by this Hon’ble Commission. 09.08.2017
 
3 Review Petition No.03 of 2017
In Petition No.34 of 2016
M/s TC Terrytex Limited Review Petition under Section 94 (1) (f) of the Electricity Act, 2003 in the matter of Order in Petition No.34 of 2016 regarding payment of interest on refundable amount of Security (works) as per Regulation 19.7 of Supply Code, 2007. 19.06.2017
 
4 Review Petition No. 04 of 2017
in Petition No. 25 of 2016
M/s Abundant Energy Private Limited Review Petition under Regulation 64 of the Punjab State Electricity Regulatory Commission (Conduct of Business) Regulations, 2005, praying for review of the order dated 14.02.2017 passed by the Commission in Petition No. 25 of 2016 titled as M/s Abundant Energy Private Ltd. V/s Punjab State Power Corporation Limited and another. 21.05.2018
 
5 Review Petition No. 05 of 2017
in Petition No.90 of 2016
Punjab State Power Corporation Limited Review Petition under Section 94 of the Electricity Act 2003 for seeking review of the Tariff Order dated 23.10.2017 passed by the Commission in Petition 90 of 2016 for MYT Control Period from FY 2017-18 to FY 2019-20. 03.04.2018
 
6 Review Petition No.6 of 2017
in Petition No. 90 of 2016
Nahar Industrial Enterprises Limited and others Review Petition under Section 94 (1) (f) of the Electricity Act, 2003 read with Regulation 64, 69 to 71 of the Punjab State Electricity Regulatory Commission (Conduct of Business) Regulations, 2005 for reviewing the ‘Tariff Order for PSPCL MYT Control Period from FY 2017-18 to FY 2019-20’ only with regard to levy of arbitrary and unreasonable “Fixed Charges” on the basis of total Demand in respect of Captive / Co-generation Power Plant Industrial Consumers;
AND
Petition under Section 9, 61 (h) and (i) read with Section 86 (1) (e), 86(4) of the Electricity Act, 2003, read with Clause 5.12, 6.3, 8.5.6 of the National Tariff Policy, 2016 read with Regulation 9 & 10 of the “Punjab State Electricity Regulatory Commission (Harnessing of Captive Power Generation) Regulations, 2009” for amendment / review so as to make adequate provisions for levying reasonable fixed charges in respect of load / demand fed from T.G./C.P.P./Co-Generation installed by various Industries as per Government Policies issued from time to time;
AND
During the pendency of present Petition, applicability of “Two Part Tariff”, which has been deferred uptil 01.01.2018 be continued to be deferred / postponed in respect of Class of Industrial Consumers having installed T.G. / C.P.P. / Co-Generation with due permission from Distribution Licensee / Chief Electrical Inspector. In other words, till the present petition is decided, only energy charges as fixed by the Commission in Table 8.2 of Tariff Order dated 23.10.2017 may be charged, levy of fixed charges as provided in said table be deferred / stayed.
22.02.2018
 
7 I.A. No.05A of 2017
in Petition No. 15 of 2016
Radiant Solar Energies Private Limited Interim Application seeking adjudication of the issue with respect to undue influence of the counsel representing the Petitioner in the captioned matter before this Commission.
AND
Petition for directing PSPCL and PSTCL to make the bay ready for synchronization and restraining PEDA from forfeiture of Performance Bank Guarantee in terms of the PPA and Implementation Agreement and extension of the date of commissioning of petitioner’s project till bay is ready for synchronization.
22.05.2017
 
8 I.A. No.06 of 2017
in Petition No. 21 of 2016
Solaire Power Private Limited, Pune Interim Application seeking adjudication of the issue with respect to undue influence of the counsel representing the Petitioner in the captioned matter before this Commission.
AND
Petition under Section 86(1)(f) of the Electricity Act, 2003 read with rule 10, 69, 71 and 73 of the PSERC (Conduct of Business) Regulations, 2005 and Clause 85 of CERC (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2012 (adopted by the Commission vide its Order dated 19.07.2012 in Suo-motu Petition No. 35 of 2012) read with Article 19.1.0 of the Power Purchase Agreement dated 31.03.2015, Article 10 of the Implementation Agreement dated 24.03.2015 and Section 94 of the Electricity Act, 2003, for seeking Project Specific extension of period of commissioning of the project upto 20.02.2016 with applicable tariff of Rs.6.88 per kWh.
22.05.2017
 
9 I.A. No.07 of 2017
in Petition No. 22 of 2016
M/s Solaire Urja Private Limited. Application seeking adjudication of the issue with respect to undue influence of the counsel representing the Petitioner in the captioned matter before this Hon’ble Commission as the counsel representing the Petitioner has been representing this Hon’ble Commission before other Court(s)/forum(s)/Tribunal(s) which is gravely prejudicing the rights of the Applicant-Respondent-PEDA. 18.05.2017
 
10 I.A. No.08 of 2017
in Petition No. 24 of 2016
Azure Renewable Energy Private Limited Interim Application seeking adjudication of the issue with respect to undue influence of the counsel representing the Petitioner in the captioned matter before this Commission.
AND
Petition under Section 86(1)(f) of the Electricity Act, 2003 read with rule 10, 69, 71 and 73 of the PSERC (Conduct of Business) Regulations, 2005 and clause 85 of CERC (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2012 (adopted by this Commission in its Order dated 19.07.2012 in suo-motu Petition No. 35 of 2012) read with Article 19.1.0 of the Power Purchase Agreement dated 31.03.2015 and Article 10 of the Implementation Agreement dated 28.03.2015 and Section 94 of the Electricity Act, 2003, for seeking Project Specific extension of period of commissioning of the project upto 31.05.2016 with applicable tariff of Rs.7.59 per kWh.
22.05.2017
 
11 I.A. No.10 of 2017
in Petition No. 26 of 2016
Omega Infraengineers Private Limited Interim Application seeking adjudication of the issue with respect to undue influence of the counsel representing the Petitioner in the captioned matter before this Commission.
AND
Petition under Section 86(1)(f) of the Electricity Act, 2003 read with rule 10, 69, 71 and 73 of the PSERC (Conduct of Business) Regulations, 2005 and clause 85 of CERC (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2012 (adopted by this Commission in its Order dated 19.07.2012 in suo-motu Petition No. 35 of 2012) read with Article 19.1.0 of the Power Purchase Agreement dated 31.03.2015 and Article 10 of the Implementation Agreement dated 28.03.2015 and Section 94 of the Electricity Act, 2003, for seeking Project Specific extension of period of commissioning of the project upto 31.08.2016 with applicable tariff of Rs.7.65 per kWh.
22.05.2017
 
12 I.A. No.12 of 2017
in Petition No. 12 of 2017
Mytrah Aadhya Power Pvt. Ltd Interim Application seeking adjudication of the issue with respect to undue influence of the counsel representing the Petitioner in the captioned matter before this Commission.
AND
Petition under Section 86(1) (f) of the Electricity Act, 2003 read with Rule 10,69, 71 and 73 of the PSERC (Conduct of Business) Regulations, 2005 and clause 85 of CERC (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2012 (adopted by this Hon’ble Commission in its order dated 19.07.2012 in Suo-Motu petition No. 35 of 2012) read with Article 19.1.0 of the Power Purchase Agreement dated 20.1.2016 and Article 10 of the Implementation Agreement dated 4-12-2015 and section 94 of the Electricity Act, 2003, for seeking Project Specific extension of period of commissioning of the project upto 15.5.2017 with applicable tariff of Rs.5.97 pr kWh.
22.05.2017
 
13 I.A. No.14 of 2017
in Petition No. 14 of 2017
Photon Suryodaya Pvt. Limited Application seeking adjudication of the issue with respect to undue influence of the counsel representing the Petitioner in the captioned matter before this Hon’ble Commission, filing of petition under Section 9 of Arbitration and Conciliation Act, 1996 before the Learned Court of ADJ, Chandigarh, seeking similar relief which was dismissed vide order dated 04.03.2017 and wrongly invocation of jurisdiction of this Hon’ble Commission, which are gravely prejudicing to the rights of the Applicant-Respondent-PEDA and for other reliefs as prayed for. 06.06.2017
 
14 I.A. No. 18 of 2017
in Petition No.23 of 2017
Everest Power Private Limited Interlocutory Applications No. 18 of 2017 in Petition No. 23 of 2017 regarding provisional Annual Fixed Cost for MYT 2017-18 to 2019-2020. 08.11.2017
 
15 I.A. No.26 of 2017
in Petition No. 13 of 2017
Photon Ojas Pvt. Limited Petition under Section 86(1) (f) of the Electricity Act, 2003 to disputes arising under the Implementation Agreement (IA) dated 30.11.2015 executed between Photon Ojas Private Limited (Petitioner/POPL)) and Punjab Energy Development Agency (Respondent No.2)/PEDA) read along with the provisions of the Power Purchase Agreement (PPA) dated 13.01.2016, executed between POPL and the Punjab State Power Corporation Limited (Respondent No.1)/PSPCL) as the successor entity on unbundling of PSEB. 21.06.2017
 
16 I.A. No.31 of 2017
in Petition No. 46 of 2015
Punjab State Power Corporation Limited Petition under Section 86 (1) (f) of the Electricity Act, 2003 for adjudication of disputes under the Power Purchase Agreement dated 11.12.2010 read with the Memorandum of Understanding dated 07.10.2010 between the Petitioner-Punjab State Power Corporation Limited and the Respondent-NTPC Limited. 22.05.2018
 
17 01/2017 Punjab State Power Corporation Limited Petition under section 23 of the Electricity Act, 2003 seeking regulatory guidance for measures to be taken in case of exigencies leading to power cuts for the Tariff Year 2017-18. 25.05.2017

29.03.2017
 
18 02/2017 Punjab State Power Corporation Limited Petition for Determination of Additional Surcharge U/S 42 of the Electricity Act, 2003 read with Regulation 27 of the PSERC (Terms and Conditions for Intra-State Open Access) Regulations, 2011 to be made applicable on to the open access consumers availing power from the sources other than PSPCL. 29.03.2017
18 (a) 02/2017 Punjab State Power Corporation Limited Petition for determination of additional surcharge under Section 42 (4) of the Electricity Act, 2003, read with Regulation 27 of the PSERC (Terms and Conditions for Intra-state Open Access) Regulations, 2011, to be made applicable on the Open Access Consumers availing power from the sources other than PSPCL for the period from 01.04.2017 to 30.09.2017. 29.06.2017
 
19 03/2017 Punjab State Power Corporation Limited Petition under Section 16 of the Electricity Act, 2003, read with regulation 10 of the Punjab State Electricity Regulatory Commission (Conduct of Business) Regulations, 2005 and other relevant provisions of Punjab State Electricity Regulatory Commission (Terms and Conditions for Intra-state Open Access) Regulations, 2011, for imposing necessary conditions on the respondent, to be followed by it, while getting Open Access in the State of Punjab, to safe guard the interest of the petitioner, in view of the Order dated 05.11.2015 passed by the Central Electricity Regulatory Commission in Petition No. 197/MP/2015 titled as Indian Railways V/s Power Grid Corporation of India Ltd. and others. 28.02.2018
 
20 04/2017 Punjab State Power Corporation Limited Petition under Section 23 of the Electricity Act, 2003 seeking post facto approval of the regulatory measures imposed in emergent Grid operating conditions vide PR Circular 23 of 2009 dated 27.06.2009 and its subsequent communications/series of telephonic messages and circulars issued for reducing peak load exemptions during the year 2009-10. 24.04.2017
 
21 05/2017 Punjab State Power Corporation Ltd. Petition under Regulations 22 of the PSERC (Terms and Conditions for Determination of Tariff), Regulations 2005 as amended by PSERC (Terms and Conditions for Determination of Tariff), Second Amendment Regulation, 2012 notified vide Notification 17th September, 2012 – Approval of allocation of additional funds for segregation of mixed load feeders/metering of AP consumers in Kandi area of State of Punjab under DDUGJY and Capital Expenditure for Distribution Scheme to be executed by PSPCL for T&D Loss Reduction and System Improvement. 24.04.2017
 
22 06/2017
(Suo- Motu)
Punjab State Power Corporation Limited Petition (Suo-Motu) regarding flouting/violation of environment laws and burdening the consumers as alleged in Press Clipping appearing in the Hindustan Times dated 06.12.2016. 28.03.2019
 
23 07/2017 Punjab State Power Corporation Limited Petition under Section 86 (1) (b) of the Electricity Act, 2003 for the approval of Power Procurement plan on Short Term basis for the year 2016-17 read with the Public notice issued by the Punjab State Electricity Regulatory Commission dated 23.10.2012. 18.05.2017
 
24 08/2017 Suo-Motu Compliance of Renewable Purchase Obligation by PSPCL and related/consequential matters. 05.06.2018
 
25 09/2017 M/s A K Concast Pvt. Ltd. Petition under Section 142 of the Electricity Act, 2003 for taking action against the respondents for disobeyance and contravention of the Orders dated 20.10.2014 passed by the Hon’ble Commission in petition No. 50 of 2014 under the Regulations on Electricity Supply Code and noncompliance of Regulations 9.1.1(b), 19.7 and 30.6 of Electricity Supply Code. 12.07.2021

02.11.2022
 
26 10/2017 Punjab State Power Corporation Limited Petition for approval of Fuel Cost Adjustment (FCA) Surcharge for 3rd quarter (January, 2017 to March, 2017) of FY 2016-17. 18.04.2017
 
27 11/2017 M/s Vardhaman Polytex Ltd. Petition under regulation 6.7.1 of the Punjab State Regulatory Commission (Electricity Supply Code and Related Matters) Regulations, 2014 (hereinafter to be called as Supply Code-2014) read with regulation 10 of PSERC (Conduct of Business) Regulations-2005 and other relevant regulations framed by this Hon’ble Commission and sections of Electricity Act, 2003 seeking appropriate directions/ action against the respondent and its officials to revise the NOC issued to M/s Vardhman Polytex Ltd., for release of load from 11 KV Chandigarh Road feeder for development of 19 Acre, residential colony at Chandigarh road, Ludhiana, under existing technical/ loading conditions at site, as this feeder can take load of proposed residential colony of the petitioner. 18.05.2017
 
28 12/2017 M/s Mytrah Aadhya Power Pvt. Ltd. Petition under Section 86(1) (f) of the Electricity Act, 2003 read with Rule 10,69, 71 and 73 of the PSERC (Conduct of Business) Regulations, 2005 and clause 85 of CERC (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2012 (adopted by this Commission in its order dated 19.07.2012 in Suo-Motu petition No. 35 of 2012) read with Article 19.1.0 of the Power Purchase Agreement dated 20.1.2016 and Article 10 of the Implementation Agreement dated 4-12-2015 and section 94 of the Electricity Act, 2003, for seeking Project Specific extension of period of commissioning of the project upto 15.5.2017 with applicable tariff of Rs.5.97 per kWh. 21.12.2018
 
29 14/2017 Photon Suryodaya Pvt. Limited Petition under Section 86(1) (f) of the Electricity Act, 2003 in relation to disputes arising under the Implementation Agreement dated 30.11. 2015 executed between Photon Suryodaya Private Limited and Punjab Energy Development Agency read along with the provisions of the Power Purchase Agreement dated 13.01.2016, executed between petitioner and the Punjab State Power Corporation Limited as the successor entity on unbundling of PSEB. 11.02.2019
 
30 16/2017 Punjab State Power Corporation Limited Petition under section 181(2) read with section 61 and 62 of the Electricity Act, 2003 for amendments in the Punjab State Electricity Regulatory Commission (Terms and Conditions for Determination of Generation, Transmission, Wheeling and Retail Supply Tariff) Regulations, 2014. 10.07.2018
 
31 17/2017 Everest Power Private Limited Petition for approval of annual fixed cost of 100 MW Malana II Hydro-Electric Project and truing up for FY 2015-16 under Section 62 of the Electricity Act, 2003 read with Regulation 56 (2) and (3) of Punjab State Electricity Regulatory Commission (Conduct of Business) Regulations, 2005. 18.12.2017
 
32 18/2017 National Fertilizers Limited Petition under Section 142 of Electricity Act, 2003 for taking action against the respondents for willful and intentional disobedience of Orders dated 03.11.2016 passed by this Hon’ble Commission in Petition No.36 of 2016 titled National Fertilizers Ltd. Nangal Unit, Naya Nangal District Roop Nagar Vs. Punjab State Power Corporation Ltd. through its Chairman. 30.05.2022
 
33 19/2017 Sukhbir Agro Energy Limited Petition under Section 142 of the Electricity Act, 2003 for non compliance by PSPCL of Order dated 06.12.2016 in petition no. 53 of 2016 and 20.12.2016 in petition 83 of 2016 under section 86 (1) (e) of the Electricity Act, 2003 seeking directions to Punjab State Power Corporation Limited (“PSPCL”) for compliance of the Orders passed by this Commission and signing Power Purchase Agreement(s) with the petitioner. 08.10.2018
 
34 20/2017 ACME Solar Rooftop Systems Private Limited Petition under Section 142, 146 of the Electricity Act, 2003 read with Regulation 69 of the PSERC (Conduct of Business) Regulation 2004, for taking necessary actions, against the Respondent Nos. 1 to 3 for violation / non-compliance of the order dated 25.01.2017 passed in Petition No.9 of 2016, titled as M/s ACME Solar Rooftop Systems Private Limited V/s PSPCL and another, by this Hon’ble Commission and for issuance of appropriate directions to the respondents for complying with the above said order. 18.05.2017
 
35 21/2017
(Suo-motu)
Punjab State Power Corporation Limited Reintroduction of one time settlement scheme for all categories of defaulting consumers (except – AP consumers). 04.05.2017
 
36 22/2017 Punjab State Power Corporation Limited Petition for seeking clarification regarding tariff for street light connections in PUDA approved Private colonies. 10.01.2018
 
37 23/2017 Everest Power Private Limited Petition for approval of Annual Fixed Cost of 100 MW Malana II Hydro-Electric Project for Hydro-Electric Project for Multi Year Tariff (MYT) Control Period(FY 2017-18 to FY 2019-20) under Section 62 and Section 64 of the Electricity Act, 2003 read with Regulation 63 of Punjab State Electricity Regulatory Commission (Terms and Conditions of Determination of Generation, Transmission, Wheeling and Retail Supply Tariff), Regulations, 2014. 03.09.2019
 
38 24/2017 Everest Power Private Limited Petition for Capital Investment Plan and Business Plan for control period from FY 2017-18 to FY 2019-20 under Regulation 9 & 10 of Punjab State Electricity Regulatory Commission (Terms and Conditions for Determination of Generation, Transmission, Wheeling and Retail Supply Tariff), Regulations, 2014. 30.07.2018
 
39 25/2017 Dedicated Freight Corridor Corporation of India Ltd. Petition under Clause No.6 of the Regulation on Electricity Supply Code for extension of Demand Notice period regarding Traction Sub Station at Village Kotla Suleman, near Sadhugarh, Sirhind, District Fatehgarh Sahib, Punjab. 22.05.2017
 
40 26/2017 Siel Chemical Complex Petition under section 142/146 of Electricity Act, 2003 for violation of Order dated 18.10.2016 passed in Petition No.64 of 2016. 01.08.2017
 
41 27/2017 Punjab State Power Corporation Limited Petition under regulation 8.1(b) of the Supply Code 2014 by Punjab State Power Corporation Limited for seeking approval of Hon’ble Commission for extension in time period of release of New EHT Connection of 4500 kW Load / 5000 kVA Contract demand applied by Divisional Railway Manager (Elect./TRD), New Delhi under the category of Railway Traction in Sub Division Suburban Maur, PSPCL. 22.05.2017
 
42 28/2017 Punjab State Power Corporation Limited Petition for approval under Section 86(1)(b) of the Electricity Act, 2003 for the Power Procurement plan on Short Term basis for the year 2017-18 read with the Public notice issued by the Hon'ble Punjab State Electricity Regulatory Commission dated 23.10.2012. 06.06.2017
 
42 29/2017 Er. Padamjit Singh (Retd.) Petition under section 62, 65, 86 of the Electricity Act, 2003 regarding non-payment of subsidy by Govt. of Punjab and related matters. 05.06.2018
 
43 30/2017 Punjab State Power Corporation Limited Patiala Petition under Clause 9.4, 11.2 & 46 of PSERC Supply Code 2014 to waive-off Supervision Charges on the labour for shifting of the Tubewell connection within the same field on own due to failure of bore. 23.05.2017
 
44 31/2017 Punjab State Power Corporation Limited Petition seeking approval/concurrence of the Commission on the decision of BoDs on Chief Engineer/Commercial agenda No.81 dated 20.12.2016 regarding release of new connection to M/s HBN Dairies and Allied Services Ltd., Bathinda (A/C No.B/12/GC-12/0267) with request for instalments of defaulting amount. 15.05.2017
 
45 32/2017 M/s Shreyans Industries Ltd. Petition under Regulation 4.2 & 44.3 of the PSERC (Electricity Supply Code and Related Matters) Regulations, 2014 read with Section 142/143/146 of Electricity Act, 2003. 15.12.2017
 
46 35/2017 Punjab State Power Corporation Limited Petition under section 86(1)(b) and 86(1)(e) and other applicable provisions of the Electricity Act, 2003 for purchase of electricity from 15.0 MW solar power from Vijay Printing Press Pvt. Ltd. (7.5 MW) and Canal Solar Energy Pvt. Ltd. (7.5 MW) under Canal Top Scheme in the State of Punjab. 09.08.2017
 
47 36/2017 Steel Furnace Association of India Petition under Section 142, 146 and 149 of the Electricity Act, 2003 and Punjab State Electricity Regulatory Commission (Conduct of Business) Regulations, chapter IX and in the matter of non-compliance of PSERC Order dated 18.10.2016 in Petition No.64 of 2016 related to clarification of threshold consumption. 01.01.2018
 
48 37/2017 Hindustan Clean energy Limited Petition under Section 86(1) (f) of the Electricity Act, 2003 read with Regulation 9(1) and Regulation 69 of the Punjab State Electricity Regulatory Commission (Conduct of Business) Regulations, 2005. 22.03.2018
 
49 38/2017 Punjab State Power Corporation Limited Petition for approval of Fuel Cost Adjustment (FCA) Surcharge for 4th quarter (January, 2017 to March, 2017) of FY 2016-17. 21.06.2017
 
50 39/2017 Punjab State Power Corporation Limited Petition under regulation 22 of the Punjab State Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff), Regulations, 2005 as amended by Punjab State Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff), Second Amendment Regulations, 2012 for approval of Sub Transmission Scheme regarding DPR- 3; 66 kV line to connect 220 kV S/S Kartarpur to 66 kV Ring Main between 66 kV Focal Point & 66 kV Maqsoodpur Jalandhar with underground cable 630 MM2, O/H DC line and 2 No. Bays. 11.07.2017
 
51 40/2017 Punjab State Power Corporation Limited Petition under regulation 22 of the Punjab State Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff), Regulations, 2005 as amended by Punjab State Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff), Second Amendment Regulations, 2012 for approval of Transmission Scheme regarding DPR-1-66 kV overhead SC line & underground cables. 11.07.2017
 
52 41/2017 Punjab State Power Corporation Limited Petition under regulation 22 of the Punjab State Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff), Regulations, 2005 as amended by Punjab State Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff), Second Amendment Regulations, 2012 for approval of Sub Transmission scheme regarding DPR-2; 66 kV SC on DC O/H Transmission lines & Bays. 11.07.2017
 
53 42/2017 M/s Bhawani Castings Pvt. Ltd. and Ors. Petition under Section 142, 146 and 149 read with other relevant provisions of the Electricity Act, 2003 and chapter XI of PSERC (Conduct of Business) Regulations, 2005, as amended up to date and other relevant rules and regulations as approved by Hon’ble Commission for non-compliance of Orders dated 18.10.2016 passed by this Hon’ble Commission in Petition No.64 of 2016 and for other reliefs as prayed for. 06.03.2018
 
54 43/2017 Talwandi Sabo Power Limited Petition under Section 86(1)(f) of the Electricity Act, 2003 read with Regulation 69 of the Punjab State Electricity Regulatory Commission (Conduct of Business) Regulations, 2005 – (regarding shortfall in coal availability at Talwandi Sabo Power Plant). 11.04.2019
 
55 44/2017 Talwandi Sabo Power Limited Petition under Section 86(1)(b) of the Electricity Act, 2003 and Article 13 of the Power Purchase Agreement executed by the Petitioner and Punjab State Power Corporation Limited dated 01.09.2008, for the approval and consequent tariff adjustment sought by the petitioner due to a ‘Change in Law’ event viz. the introduction of new environmental norms by the Environment (Protection) Amendment Rules, 2015 resulting in additional capital and operating expenditure. 21.12.2018
 
56 45/2017 GVK Power (Goindwal Sahib) Limited Petition under Section 86 (1) (f) and other applicable provisions of the Electricity Act, 2003 for adjudication of the disputes and for directions - Power Purchase Agreement for purchase of power from 2 x 250 MW Goindwal Sahib Thermal Power Plant at Goindwal Sahib, Punjab. 21.05.2018
 
57 46/2017
I.A. No.03 of 2018
Shop Owners Welfare Association Petition under Section 142 and other applicable sections of the Electricity Act 2003, applicable provisions of the PSPCL instruction manual and supply code of 2014, for issuance of appropriate directions to the Respondent No.4, the licensee, to take appropriate action against the Respondents No.1 to 3 for gross violation of various provisions of the Act. 25.09.2018
 
58 47/2017 Punjab State Power Corporation Limited Petition under Section 50 read with section 86 of the Electricity Act, 2003 for directions in regard to the metering Protocol and alleged complaints regarding Trivector ToD meters. 28.02.2018
 
59 48/2017 Punjab State Power Corporation Limited Petition for determination of Additional Surcharge under Section 42 (4) of the Electricity Act, 2003, read with Regulation 27 of the PSERC (Terms and Conditions for Intra-state Open Access) Regulations, 2011 to be made applicable on the open access consumers availing power from the sources other than Punjab State Power Corporation Limited for the period 01.10.2017 to 31.03.2018. 26.09.2017
13.12.2017
29.12.2017
20.03.2018
 
60 49/2017 M/s Singhania International Ltd Petition/Complaint under Section 142 of the Electricity Act ,2003 read with Regulation 60 and 61 of Punjab State Electricity Regulatory Commission (Conduct of Business) Regulations-2005 for the Respondent’s willful and deliberate non-compliance of this Commission’s Order dated 28.10.2013 in Petition No. 3 of 2012. 26.06.2019
 
61 50/2017 Suo-Motu Adoption of Central Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2017 and determination/fixation of levellised generic Tariff for Renewable Energy Power Projects for FY 2017-18. 31.10.2017
 
62 51/2017 Punjab State Power Corporation Limited Petition under Section 86(1) (e) of the Electricity Act, 2003 read with Regulation 6(2) and Regulation 7 of the Punjab State Electricity Regulatory Commission (RPO & its Compliance) Regulations, 2011 framed by the Commission for carrying forward of shortfall of Renewable Purchase Obligation (RPO) for FY 2016-17 specified in clause 3 (1) to FY 2017-18. 16.03.2018
 
63 52/2017 Vardhman Special Steels Ltd Petition under section 142, 146 and 149 of the Electricity Act, 2003 and Punjab State Electricity Regulatory Commission (Conduct of Business) Regulations, 2005, Chapter IX and in the matter of non-compliance of Punjab State Electricity Regulatory Commission (Terms and Conditions for Intra-state Open Access) (4th Amendment) Regulations, 2014 – cross subsidy surcharge wrongly charged on open access power when mandatory power cut imposed by PSPCL. 03.01.2018
 
64 53/2017 M/s Savitri Woods Petition under Regulation 45, 46 and 47.2 of PSERC (Electricity Supply Code and Related Matters) Regulations, 2014 read with Regulation 69 and 73 of PSERC (Conduct of Business) Regulations, 2005 and other related/relevant Regulations of this Commission for providing relief to the petitioner to grant extension in the period for completion of formalities in compliance of Demand Notice beyond one year from the date of its issue for filing test report and other related documents for release of extension of load/contract demand. 01.12.2017
 
65 54/2017 GVK Power (Goindwal Sahib) Limited Petition for determination of Tariff under Sections 62 and 86 of the Electricity Act, 2003 read with (a) Punjab State Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) Regulations, 2005; (b) the Central Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) Regulations, 2014; and (c) Amended and Restated Power Purchase Agreement dated 26.05.2009 executed between Petitioner GVK Power (Goindwal Sahib) Limited and Punjab State Power Corporation Limited (formerly known as Punjab State Electricity Board). 17.01.2020
 
66 55/2017 PTC India Limited Petition under Section 86(1)(f) of the Electricity Act, 2003 seeking setting aside of termination letter dated 09.03.2011 issued by Swasti Power Engineering Limited and specific performance of the PPA dated 24.08.2005. 15.01.2019
 
67 56/2017 Azure Power Forty Four Private Limited Memorandum of Original Petition filed under section 86(1)(e) of the Electricity Act, 2003 read with Regulation 19 of the Punjab State Electricity Regulatory Commission (Grid Interactive Rooftop Solar Photo Voltaic Systems based on Net Metering) Regulations, 2015. 18.12.2017
 
68 57/2017 Punjab State Power Corporation Limited Petition under Regulation 47 of PSERC (Electricity Supply Code & Related Matters) Regulations, 2014 and Clause 68 & 69 of PSERC (Conduct of Business) Regulations, 2005 regarding Voluntary Disclosure Scheme (VDS) for Agriculture Tubewell (A.P.) Consumers. 10.11.2017
 
69 58/2017 M/s A.V.N. Manufacturing Co. Petition under section 142 and other relevant provisions of the Electricity Act, 2003 read with regulation 9 and 10 of PSERC (Electricity Supply Code and Related Matters). Regulations, 2007 and clause 44 of the Punjab State Electricity Regulatory Commission (Electricity Supply Code and Related Matters) Regulations, 2014 and other relevant provisions of the regulations framed by this Commission, praying for taking necessary action against the respondents under section 142 of the Electricity Act, 2003, for raising impugned demand of Rs.11,26,971, vide letter dated 31.05.2017 from the petitioner, on account of Less Service Connection Charges charged at the time of extension of load on 27.08.2008, and further for raising the said impugned demand by way of supplementary bill dated 13.09.2017 and later on adding the said impugned demand in the monthly bill dated 06.10.2017 issued for the month of September, 2017, being in violation of provisions of regulation 9 and 10 of PSERC (Electricity Supply Code and Related Matters), Regulations, 2007, provisions of the Electricity Act, 2003 and Limitation Act, 1908; and further for setting aside the above said impugned demand, supplementary bill dated 13.09.2017 and monthly bill dated 06.10.2017 wherein the above said impugned demand of Rs.11,26,971 has been added in the monthly energy bill as arrears.
Further for setting aside the Letter Memo.No.1169 dated 09.08.2017 (Annexure P-7) issued by the respondent no.3, whereby the representation made by the petitioner against the impugned demand of Rs.11,26,971 raised vide letter dated 31.05.2017, has been dismissed by passing a totally non speaking order and further the impugned demand has been upheld, having been issued in violation of principle of natural justice and equity and provisions of the Electricity Act, 2003 and Supply Code-2007.
11.06.2018
 
70 59/2017 SEL Manufacturing Company Ltd. Petition under Supply Code (2007) Regulation 49 & Supply Code (2014) Regulation 46 for setting aside the illegal demand of Rs. 5,40,97,475/- raised by PSPCL on account of voltage surcharge for the period 01.04.2011 to 11.09.2017 in violation of the Electricity Act, 2003 & Supply Code Regulations. 26.07.2018
 
71 61/2017 Talwandi Sabo Power Limited Petition under Section 86(1)(f) of the Electricity Act, 2003 read with Regulation 1.10.2 of the Punjab State Electricity Regulatory Commission (Punjab State Grid Code) Regulations, 2013, and pursuant to the Hon’ble Punjab and Haryana High Court’s Order dated 28.09.2017 in CWP No.10553 of 2017 concerning disputes between Talwandi Sabo Power Limited on the one hand and Punjab State Load Despatch Centre and Punjab State Power Corporation Limited on the other in respect of alleged mis-declaration of Declared Capability and levy of penalty. 26.02.2018
 
72 62/2017 Everest Power Private Limited Petition for approval of annual fixed cost of 100 MW Malana II Hydro-Electric Project and truing up for FY 2016-17 under Section 62 of the Electricity Act, 2003 read with Regulation 56 (2) and (3) of Punjab State Electricity Regulatory Commission (Conduct of Business) Regulations, 2005. 24.05.2018
 
73 63/2017 SAB Industries Ltd. Petition under Section 62 of the Electricity Act, 2003 read with Regulation 8 of the Central Electricity Regulatory Commission(Terms and Conditions for Tariff determination from renewable energy sources) Regulation 2012 (as adopted by the Hon’ble Commission) requesting the Hon’ble Commission to determine the tariff under the provisions of the said regulations with respect to 1.5 MW capacity biogas power and bio-fertilizer plant using cow-dung, press mud and poultry litter based on bio-methanation technology at Moonak, (Sangrur), Punjab setup by the petitioner. 19.02.2018
 
74 64/2017 SEL Manufacturing Company Ltd Petition under Section 142 of the Electricity Act, 2003 for non implementation of the Orders of the Punjab State Electricity Regulatory Commission in full passed in Petition No. 54 of 2013 for refund of security (works) with interest. 07.05.2018
 
75 65/2017 Punjab State Transmission Corporation Limited Petition for Annual Performance Review for FY 2017-18 and Revised Estimates of Annual Revenue Requirement for FY 2018-19. 27.03.2018
 
76 66/2017 Punjab State Power Corporation Limited Petition for Annual Performance Review for FY 2017-18 and Revised Estimates of Annual Revenue Requirement for FY 2018-19. 27.03.2018
 
77 67/2017 Nabha Power Limited Petition under Section 86 (1) (b), Section 86 (1) (f), Section94 (1)(g) of the Electricity Act, 2003 read with Regulation 69 of the Punjab State Electricity Regulatory Commission(Conduct of Business) Regulations, 2005 seeking issuance of directions to the Standing Committee to adhere and comply with the mandate of the final order dated 16.03.2016 issued by APTEL in Appeal No. 68 of 2013, by way of timely allowing arrangement of coal from alternate sources in case of NPL facing shortage of coal from the linked sources in order to operate the Project in terms of the PPA; claiming for the loss of availability suffered by NPL on account of the present non-adherence with the aforesaid final order by the two constituents of the Standing Committee other than NPL, by way of not granting its approval to arrange coal from the alternate sources as per the mandate of aforesaid order despite the demonstrated and accepted shortfall of coal from the linked sources; and immediate directions for arrangement of coal from alternate sources to avoid any shortfall in the current financial year in order to implement the aforesaid order issued by the Hon'ble Tribunal in its true letter and spirit. 06.03.2018
 
78 68/2017 GVK Power (Goindwal Sahib) Limited Petition under Section 86 (1) (f) and other provisions of the Electricity Act, 2003 for adjudication of the Billing Disputes arisen under the Amended and Restated Power Purchase Agreement dated 25.06.2009 of 2x270 MW Goindwal Sahib Thermal Power Plant at Goindwal Sahib, Punjab. 06.03.2019
 
79 69/2017 GVK Power (Goindwal Sahib) Limited Petition for determination of Tariff for the Control Period (FY 2017-18 to 2019-20) under Section 62 and 86 of the Electricity Act, 2003 read with (a) Punjab State Electricity Regulatory Commission (Terms & Conditions for Determination of Generation, Transmission, Wheeling and Retail Supply Tariff) Regulations, 2014; and (b) Amended and Restated Power Purchase Agreement dated 26.05.2009 executed between Petitioner (Goindwal Sahib) Limited and Punjab State Power Corporation Limited (formerly known as Punjab State Electricity Board). 05.08.2020
 
80 70/2017 GVK Power (Goindwal Sahib) Limited Petition for the approval of the Capital Investment Plan (CIP) and the Business Plan (BP) for 2x270 MW Goindwal Sahib Thermal Power Project for Multi Year Tariff (MYT) control period (FY 2017-18, 2018-19 and FY 2019-20) under Regulation 9 & 10 of the Punjab State Electricity Regulatory Commission (Terms and Conditions for Determination of Generation, Transmission, Wheeling and Retail Supply Tariff) Regulations, 2014. 30.07.2020