List of Commission's Orders / Judgments passed in various cases.





Sr.No. Petition No. Filed By Subject Matter Date of Final Decision
01 IA No. 07 of 2023 in Petition No. 63 of 2022 Talwandi Sabo Power Limited Application seeking directions for reference of the dispute in Petition No. 63 of 2022 to Arbitration in terms of the Article 17.3.2 of the PPA dated 01.09.2008 read with Regulation 20 of PSERC (Conduct of Business) Regulations, 2005 and Section 86 (1) (f) & 158 of the Electricity Act, 2003. 18.08.2023
 
02 IA No. 16 of 2023 in Petition No. 05 of 2023 Punjab State Power Corporation Ltd. Petition under Regulation 47 of Supply Code-2014 and Regulation 69,70,71& 72 of Chapter XIII of the Conduct of Business Regulations 2005 for introduction of One Time Settlement Scheme for all categories of defaulting consumers (except AP). 25.08.2023
 
03 IA No. 20 of 2023 in Petition No. 05 of 2023 Punjab State Power Corporation Ltd. Petition under Regulation 47 of Supply Code-2014 and Regulation 69,70,71& 72 of Chapter XIII of the Conduct of Business Regulations 2005 for introduction of One Time Settlement Scheme for all categories of defaulting consumers (except AP). 23.11.2023
 
04 Review Petition No. 02 of 2023 Bhakra Beas Management Board Petition for Review as per PSERC Conduct of Business Regulations and under Section 86(1)(c) of the Electricity Act, 2003 read with Section 39 of the Electricity Act, 2003 and Regulations 10, 13, 14, 15, 16, 23, 24, 25 and 45 of the Punjab State Electricity Regulatory Commission (Terms and Conditions for Intra-state Open Access) Regulations, 2011 praying for review and recall of orders dated 10.01.2023, served on 12.01.2023, passed by the Commission and seeking appropriate directions; 31.05.2023
 
05 Review Petition No. 03 of 2023 Punjab State Power Corporation Limited Petition under Section 94 (1) (f), 86 (1) (f) and other applicable provisions of the Electricity Act, 2003, read with Regulation 64 of the PSERC Conduct of Business Regulations, 2005, seeking review/vacation of the Order dated 01.06.2023 passed by this Hon’ble Commission in Petition No. 31 of 2023 19.07.2023
 
06 Review Petition No. 04 of 2023 in Petition No. 74 of 2022 Punjab State Power Corporation Limited Review Petition under Section 94 of the Electricity Act, 2003 against Tariff Order dated 15.05.2023 for financial year 2023-24 in Petition No. 74 of 2022. 06.06.2024
 
07 Review Petition No. 06 of 2023 In Petition No. 05 of 2023 Punjab State Power Corporation Limited Review Petition/Application under Section 94 (1) (f) of the Electricity Act, 2003 read with Regulation 64 (Chapter XIII) of PSERC (Conduct of Business) Regulations and other provisions for Reviewing the Order dated 15.05.2023 rendered by the Commission in Petition No. 05 of 2023 for introduction of One Time Settlement Scheme for all categories of defaulting consumers (except AP). 21.08.2023
 
08 Review Petition No. 07 of 2023 In Pt. No. 56 of 2022 (Suo-Motu) M/s Everest Power Private Limited Review Petition under Section 94(1)(f) of the Electricity Act read with Regulations 64 of the PSERC (Conduct of Business) Regulations, 2005 for Review of the Final Order dated 01.06.2023 passed in petition no. 56 of 2022 (Suo-Motu). 01.02.2024
 
09 Review Petition No. 08 of 2023 In Petition No. 65 of 2022 Nabha Power Limited Review Petition under Section 94(1)(f) of the Electricity Act, 2003 read with Regulation 64 of the PSERC (Conduct of Business) Regulations, 2005 for review of this Commission’s Order dated 17.07.2023 in Petition No. 65 of 2022. 23.11.2023
 
10 Review Petition No. 09 of 2023 In Petition No. 68 of 2022 GVK Power (Goindwal Sahib) Limited Review Petition under Section 94 (1) (f) of the Electricity Act, 2003 read with Regulation 64 of Punjab State Electricity Regulatory Commission (Conduct of Business) Regulations, 2005 seeking review of order dated 12.07.2023 passed in Petition No. 68 of 2022. 21.02.2024
 
11 Review Petition No. 10 of 2023 In Petition No. 06 of 2023 Punjab State Power Corporation Limited Review Petition under Section 94 (f) of the Electricity Act, 2003 read with Order 47 Rule 1 of the Code of Civil Procedure, 1908 and Regulation 64 & 69 of the Punjab State Electricity Regulatory Commission (Conduct of Business Regulation), 2005 for reviewing/recalling the Order dated 05.09.2023 passed by this Commission in Petition No. 6 of 2023. 04.12.2023
 
12 Review Petition No. 11 of 2023 In Petition No. 02 of 2023 Talwandi Sabo Power Limited Review Petition under Section 94 (1) (f) of the Electricity Act, 2003 read with Regulation 64 of the Punjab State Electricity Regulatory Commission (Conduct of Business) Regulations, 2005 for review of the Commission’s Order dated 21.09.2023 in Petition No. 2 of 2023. 09.04.2024
 
13 Petition No. 01 of 2023 GVK Power (Goindwal Sahib) Limited Petition under Section 86(1)(f) of Electricity Act, 2003 seeking directions to the Respondent No. 1, Punjab State Power Corporation Limited to pay Capacity Charges for the months of April and May 2020 to the Petitioner, GVK Power (Goindwal Sahib) Limited as per the Revised Energy Accounts dated 05.08.2022 issued by the Respondent No. 2, Punjab State Load Despatch Centre pursuant to the Commission Order dated 22.07.2022 in Petition No. 15 of 2020 filed by the Petitioner. 05.09.2023
 
14 Petition No. 02 of 2023 Talwandi Sabo Power Limited Petition under Section 86 (1) (b) and (f) of Electricity Act, 2003 read with Article 13 of the PPA dated 01.09.2008 executed between Talwandi Sabo Power Ltd. and Punjab State Power Corporation Ltd. for approval and consequent tariff adjustment as sought by the Petitioner due to ‘Change in Law’ event viz. introduction of Ministry of Power’s notification dated 08.10.2021, i.e. ‘Revised Policy for Biomass Utilisation for Power Generation through Co-firing in Coal based power plants’ and directions issued by Commission for Air Quality in National Capital Region and Adjoining Areas, resulting in additional capital and operational expenditure for the Petitioner. 21.09.2023
 
15 Petition No. 03 of 2023 National Fertilizers Ltd. Petition u/s 142 of the Electricity Act 2003 for wilful, deliberate and intentional disobedience of Orders dated 24.04.2017 (P-6) passed by this Hon'ble Commission in Petition No.4 of 2017 which is in continuation of orders dated 03.11.2016 passed by this Hon’ble Commission in petition No.36 of 2016 titled as National Fertilizers Ltd. Nangal Unit, Naya Nangal District Roop Nagar Vs. Punjab State Power Corporation Ltd. through its Chairman. 09.08.2023
 
16 Petition No. 04 of 2023 Punjab State Power Corporation Limited Petition under Section 86 (1) (b) of the Electricity Act, 2003 read with Punjab State Electricity Regulatory Commission (Power Purchase and Procurement Process of Licensees) Regulations, 2012; Regulation 46 of the Punjab State Electricity Regulatory Commission (Conduct of Business) Regulations, 2005, Punjab State Electricity Regulatory Commission (Renewable Purchase Obligation and its compliance) Regulations, 2022 and other applicable Regulations for approval of the Procurement Process of PSPCL in respect of M/s Om Sons Marketing Pvt. Ltd. 11.05.2023
 
17 Petition No. 05 of 2023 Punjab State Power Corporation Ltd Petition under Regulation 47 of Supply Code-2014 and Regulation 69,70,71 & 72 of Chapter XIII of the Conduct of Business Regulations 2005 for introduction of One Time Settlement Scheme for all categories of defaulting consumers (except AP). 15.05.2023
 
18 Petition No. 06 of 2023 Chandigarh Distillers and Bottlers Limited Petition under under Section 86(1)(b), 86 (1)(c), 86(1)(e), 86 (1)(f), 86(1)(k) and 86(4) of Electricity Act, 2003 read with Regulation 9(1), 69, 72 and 74 of the PSERC (Conduct of Business Regulation), 2005 seeking quashing of PSPCL’s recovery notices dated 11.08.2022 and 26.12.2022 citing reduction in tariff on account of availing the Capital Subsidy and Accelerated Depreciation by the petitioner. 05.09.2023
 
19 Petition No. 07 of 2023 Nabha Power Limited Petition under Section 86 (1)(b), 86(1)(f) and other relevant provisions of the Electricity Act, 2003 read with the provisions of the Power Purchase Agreement dated 18.01.2010 impugning the legality, validity and the propriety of the letter under Memo No. 35/ISB-586 A dated 17.01.2023 issued by the Punjab State Power Corporation Limited and the consequences thereof. 18.09.2024
 
20 Petition No. 08 of 2023 Punjab State Power Corporation Limited Petition under Section 86 (1)(B) of the Electricity Act, 2003 seeking approval for allocation of additional budget for CAPEX Plan for Annual Plan FY 2022-23 for the work executed/under execution under various schemes. 31.07.2023
 
21 Petition No. 09 of 2023 Punjab State Power Corporation Limited Petition under Section 23 of the Electricity Act, 2003 seeking Regulatory Guidance for Measures to be taken by PSPCL in case of exigencies leading to power cuts for the Tariff Year 2023-24. 31.03.2023
 
22 Petition No. 10 and 11 of 2023 Punjab State Power Corporation Ltd. (PSPCL) Petition under Section 63, Section 86 (1) (b) and (e) of the Electricity Act, 2003 read with the Punjab State Electricity Regulatory Commission (Power Purchase and Procurement Process of Licensees) Regulations, 2012 and Regulation 46 of the Punjab State Electricity Regulatory Commission (Conduct of Business) Regulations, 2005 for adoption of Tariff for procurement of power from Grid Connected 1000 MW Solar Power Projects located anywhere in India and Approval of Power Procurement in respect thereof.
And
Petition under Section 63, Section 86 (1) (b) and (e) of the Electricity Act, 2003 read with the Punjab State Electricity Regulatory Commission (Power Purchase and Procurement Process of Licensees) Regulations, 2012 and Regulation 46 of the Punjab State Electricity Regulatory Commission (Conduct of Business) Regulations, 2005 for adoption of Tariff for procurement of power from Grid Connected 200 MW Solar Power Projects located anywhere in Punjab and Approval of Power Procurement in respect thereof.
31.05.2023
 
23 Petition No. 12 of 2023 Punjab State Power Corporation Limited Petition under Regulation 47 of Supply Code-2014 and Regulation 69, 70, 71 & 72 of Chapter XIII of the Conduct of Business Regulations 2005 for Introduction of One Time Settlement Scheme for recovery of interest on arrears on account of voltage surcharge @ 10% from LS consumers (except arc/induction furnace consumers) with contract demand exceeding 2500 kVA and up to 4000 kVA catered at 11kV and voltage surcharge @ 17.5% from all arc/induction furnace consumers and other consumers having demand above 4000 kVA which are given supply at 11 kV as per Hon’ble Supreme Court judgment dated 01.03.2017 & 19.06.2017. 31.05.2023
 
24 Petition No. 13 of 2023 M/s Hawkins Cookers Limited Petition for clarification regarding applicability of PIU and consequential UUE charges to the Petitioner under the definition of electrolytic industry for carrying out the anodizing process as a small part of its total production under regulation 68, 69, 70, 71 and 72 and other relevant provisions of Chapter XIII of the Conduct of Business Regulations 2005 as amended up to date, Regulations 44, 45 and 46 of Supply Code 2014 as amended up to date and other relevant provisions of the Electricity Act, 2003, especially in light of the final order dated 26.06.2019 passed by this Hon'ble Commission in Petition no. 49 of 2017 titled as M/s Singhania International Ltd., C-25, Ph- 1, Focal Point, Ludhiana versus Punjab State Power Corporation Limited (PSPCL), Patiala and interim order dated 23.08.2022 in Petition no. 62 of 2021 for clarification regarding applicability of PIU tariff to Electroplating Industries and some other type of industries. 31.05.2023
 
25 Petition No. 14 of 2023 GVK Power (Goindwal Sahib) Limited Petition under Section 86 (1) (f) of Electricity Act, 2003 seeking quashing of Procurer Preliminary Default Notice dated 22.12.2022 issued by PSPCL on GVK under Article 14.3.1 of the Amended and Restated PPA dated 26.05.2009. 21.02.2024
 
26 Petition No. 15 of 2023 Punjab State Power Corporation Limited Petition under Regulation 47 of Supply Code-2014 and Regulation 69, 70, 71 & 72 of Chapter XIII of the conduct of Regulations 2005, regarding amendment in Regulation 9.1.1(a) (1), Regulation 9.1.1 (a) (ii) and Regulation 6.2.1 of Supply Code-2014. 12.05.2023
 
27 Petition No. 16 of 2023 GVK Power (Goindwal Sahib) Limited Application for approval of Capital Investment Plan and Business Plan for 2X270 MW Goindwal Sahib Thermal Power Plant at Goindwal Sahib, Punjab for the control period FY 2023-24 to 2025-26 in terms of Regulation 9 of the Punjab State Electricity Regulatory Commission (Terms and Conditions for Determination of Generation, Transmission, Wheeling and Retail Supply Tariff) Regulations, 2022. 20.09.2023
 
28 Petition No. 17 of 2023 GVK Power (Goindwal Sahib) Limited Application for approval of Aggregate Revenue Requirement and Determination of Tariff for sale of energy generated by 2x270 MW Goindwal Sahib Thermal Power Plant at Goindwal Sahib, Punjab for the control period FY 2023-24 to 2025-26 in terms of Section 62, Section 86 and Section 94 of the Electricity Act 2003 alongwith “Punjab State Electricity Regulatory Commission (Terms and Conditions for Determination of Generation, Transmission, Wheeling and Retail Supply Tariff) Regulations, 2022. 01.11.2023
 
29 Petition No. 18 of 2023 Suo-Motu Petition for the Determination of Additional Surcharge u/s 42 (4) of the Indian Electricity Act-2003 read with Regulation 27 of Punjab State Electricity Regulatory Commission (Terms and Conditions for Intra-State Open Access) Regulation, 2011 to be made applicable on to the open access consumers availing power from the sources other than PSPCL for the period 01.04.2023 to 30.09.2023. 31.03.2023
 
30 Petition No. 19 of 2023 Punjab State Power Corporation Limited Petition under regulation 8.1 (b) of the supply code 2014 by Punjab State Power Corporation Limited for seeking approval of Hon’ble Regulatory Commission for extension in time period of release of EHT Connection under regulation 69, 70, 71 & 72 of chapter XIII of the conduct of Business Regulations 2005. In the case of New Connection of 4500 KW Load / 5000 kVA contract demand applied by Divisional Railway Manager (Elect./TRD), Ferozepur under the Category Railway Traction in Sub-Division Jhoke Hari Har Under Suburban Division Ferozepur (RID No. 5726) 12.01.2024

Click here for Corrigendum dated 31.01.2024
 
31 Petition No. 20 of 2023 Punjab State Power Corporation Limited Petition under Section 86(1)(b) and 86 (1)(e) of the Electricity Act, 2003, as read with the applicable provisions under the Punjab State Electricity Regulatory Commission (Power Purchase and Procurement Process of Licensees) Regulations, 2012; Regulation 46 of the Punjab State Electricity Regulatory Commission (Conduct of Business) Regulations, 2005 for approval of power procurement from the grid connected 200 kW Solar PV power Project at village khatkar Kalan in Punjab and approval of the supplementary power purchase agreement in respect thereof. 21.07.2023
 
32 Petition No. 21 and 22 of 2023 PN Clean Energy Ltd. Petition under Section 86 of the Electricity Act, 2003 read with Article 16 of the Power Purchase Agreement dated 30.12.2013 seeking directions to quash the Demand Notice dated 30.01.2023 issued by Punjab State Power Corporation Limited. 25.09.2023
 
33 Petition No. 23 of 2023 Vikramjit Singh Son of Swarn Jeet Singh Petition under Section 43 of the Electricity Act, 2003 read with Regulation 5.1 Regulation 45, 46, 47 of the Supply Code, 2014 and other relevant rules and regulations as approved by Hon’ble Commission including 68, 69, 70, 71, 72 and other relevant provisions of Chapter 12(XII) Regulations, 2005 as amended up to date and the provisions of the Electricity Act, 2003 for directing the respondents to render respective permanent domestic Supply Electricity Connection to the Petitioners for their residential houses in the colony. AND for passing any other relief in favour of the petitioners as this Hon’ble Commission may deem fir the facts and circumstances of the case. 25.07.2023
 
34 Petition No. 24 of 2023 Sarita Sharma Petition under conduct of business Regulations 2005 of PSERC under Electricity Act -2003 seeking compliance of regulations issued by PSERC and Electricity Act 2003 and suitable action against respondents U/s 142 and 146 of EA2003 for not complying with the regulations. 17.10.2023
 
35 Petition No. 25 of 2023 M/s Jolly Staple Craft Pvt. Ltd. Petition under conduct of business Regulations 2005 of PSERC under EA-2003 seeking compliance of regulations issued by PSERC and EA-2003 and suitable action against respondents u/s 142 and 146 of EA-2003 for not complying with the regulations. 17.10.2023
 
36 Petition No. 26 of 2023 Kamaljit Kaur Phase VIII, Focal Point, Ludhiana Petition under conduct of business Regulations 2005 of PSERC under EA-2003 seeking compliance of regulations issued by PSERC and EA-2003 and suitable action against respondents u/s 142 and 146 of EA-2003 for not complying with the regulations and time schedule under Section 126 of the Electricity Act 2003. 10.08.2023
 
37 Petition No. 27 of 2023 Punjab State Power Corporation Limited Petition under Section 86 (1) (b) of the Electricity Act, 2003 read with the Punjab State Electricity Regulatory Commission (Power Purchase and Procurement Process of Licensees) Regulations, 2012 and Regulation 46 of the Punjab State Electricity Regulatory Commission (Conduct of Business) Regulations, 2005 for approval of the Power Procurement of 197 MW of Nuclear Power. 09.08.2023
 
38 Petition No. 28 of 2023 Punjab State Power Corporation Limited Petition for the Determination of Additional Surcharge 42 (4) of the Indian Electricity Act-2003 read with Regulation 27 of the Punjab State Electricity Regulatory Commission (Terms and Conditions for Intra-State Open Access) Regulations, 2011 to be made applicable on to the open access consumers availing power from the sources other than PSPCL for the period 01.04.2023 to 30.09.2023. 06.10.2023
 
39 Petition No. 29 of 2023 Suo-Motu Petition (Suo Motu) for devising mechanism for payment of amounts by the procurer (PSPCL) to Talwandi Sabo Power Limited and Nabha Power Limited towards additional cost and other expenses in relation to procurement, installation, commissioning, operation and maintenance of FGD for SO2 and carrying cost in terms of the provisions of the PPAs. 02.07.2024
 
40 Petition No. 30 of 2023 Punjab State Power Corporation Limited Petition under regulation 8.1 (b) of the supply code 2014 by Punjab State Power Corporation Limited for seeking approval of the Regulatory Commission for extension in time period of release of EHT Connection under regulation 69, 70, 71 & 72 of chapter XIII of the conduct of Business Regulations 2005 in the case of the connection of 4500kW load/ 5000 kVA contract demand applied by Divisional Railway Manager (Elect./TRD), Ferozepur through Sr. Divisional Electrical Engineer (TRD), DRM office Ferozepur under the category Railway Traction in sub-division Jaitu under Division Kotkapura (RID No. 9379) 19.02.2024
 
41 Petition No. 31 of 2023 GVK Power (Goindwal Sahib) Limited Petition under Section 86 (1) (f) of the Electricity Act, 2003 seeking quashing of Punjab State Power Corporation Limited’s imposition of penalty on GVK Power (Goindwal Sahib) Limited, In terms of Article 1.2.5 read with Article 1.2.1(iv) of Schedule 6 of the Amended and Restated Power Purchase Agreement dated 26.05.2009. 05.12.2023
 
42 Petition No. 32 of 2023 Punjab State Power Corporation Limited Approval of Capital Expenditure for the “REVAMPED DISTRIBUTION SECTOR SCHEME” (RDSS) to be implemented by PSPCL with aim to improve the operational efficiencies and financial sustainability, by providing financial assistance to PSPCL for strengthening of supply infrastructure based on meeting pre-qualifying criteria and achieving basic minimum benchmarks in reforms. 25.04.2024
 
43 Petition No. 34 of 2023 Punjab State Power Corporation Limited Petition for approval of Fuel Cost Adjustment (FCA) Surcharge for 4th Quarter (January, 2023 to March, 2023) of FY 2022-23. 09.08.2023
 
44 Petition No. 35 of 2023 Mr. Anil Gupta, S/o Sh. Prem Nath Gupta Petition under regulation 68, 69, 70, 71 and 72 and other relevant provisions of Chapter XIII of the Conduct of Business Regulations 2005 as amended up to date, Regulations 44, 45, 46 and 47 of Supply Code 2014 as amended up to date and other relevant provisions of the Electricity act, 2003, for clarification regarding applicability of Domestic Supply Tariff to the Home Stay/BnB Unit of the Petitioner being run under the Punjab Bread and Breakfast Scheme, 2013 and 2021, including the DO letter dated 03.05.2023, which provides for applicability of the Domestic Supply tariff to the BnB’s/Home Stays and or granting any other relief which this Hon’ble Commission deems fit in the facts and circumstances of the present case. 09.08.2023
 
45 Petition No. 36 of 2023 Punjab State Power Corporation Limited Petition under Section 86(1)(b)&(e) and Section 61(h) of the Electricity Act, 2003 read with PSERC (Power Purchase and Procurement Process of Licensees) Regulations 2012 and Regulation 46 of PSERC (Conduct of Business) Regulations 2005 for approval of power procurement of 400 MW Solar power from NHPC under Tranche-III of Phase II of CPSU scheme of MNRE. 31.08.2023
 
46 Petition No. 37 of 2023 Punjab State Power Corporation Limited Petition for approval for procurement process of Punjab State Power Corporation Limited and the Power Purchase Agreement dated 17.05.2011 for a contracted capacity of 64 MW from the 2000 MW Subhansiri Lower Hydroelectric Project in Arunachal Pradesh owned and operated by NHPC Limited 31.08.2023
 
47 Petition No. 38 of 2023 Sh. Sunil Kumar Petition under conduction of Business Regulation 2005 of PSERC Issued under Electricity Act, 2003 for the seeking compliance of the Regulations issued by PSERC and suitable action against the respondents for not complying with the provisions of Supply Code-2014 issued by the PSERC. 02.08.2023
 
48 Petition No. 39 of 2023 Punjab State Power Corporation Limited Petition for approval of the Procurement Process of Punjab State Power Corporation Limited and the Power Purchase Agreements (PPAs) for procurement of surplus power upto – (i) 8.45 MW from the 14 MW Bagasse based Co-generation Power Plant of Batala Co-operative sugar Mills Limited and (ii) 20.06 MW from the 28.05 MW Bagasse based Co-generation Power Plant of Gurdaspur Co-operative Sugar Mills Limited. 22.08.2023
 
49 Petition No. 40 of 2023 Punjab State Power Corporation Limited Petition for approval of the procurement process of Punjab State Power Corporation Limited and the Supplementary Power Purchase Agreement in respect of the aggregate capacity of 9.8 MW power from the 8 Mini Hydel Plants of Punjab Genco Limited installed on Abohar and Bathinda Branch Canals. 18.12.2023
 
50 Petition No. 41 & 42 of 2023 Punjab State Power Corporation Limited Petition Under under Section 63, Section 86 (1)(b)&(e) of the Electricity Act, 2003 read with PSERC (Power Purchase and Procurement Process of Licensees) Regulations, 2012 and Regulation 46 of the PSERC (Conduct of Business) Regulations, 2005 for adoption of Tariff for Procurement of power from grid connected 1000 MW Solar Power from Projects located anywhere in India & 200 MW Solar Power from Projects located anywhere in Punjab and approval of Power Procurement in respect thereof. 21.07.2023
 
51 Petition No. 43 of 2023 Mr.Anoop Chhabra and Ors Petition under regulation 68, 69, 70, 71 and 72 and other relevant provisions of Chapter XIII of the Conduct of Business Regulations 2005 as amended up to date, Regulations 44, 45, 46 and 47 of Supply Code 2014 as amended up to date and other relevant provisions of the Electricity act, 2003, for clarification regarding applicability of Domestic Supply Tariff to the Home Stay/BnB Unit of the Petitioner being run under the Punjab Bread and Breakfast Scheme, 2013 and 2021, including the DO letter dated 03.05.2023, which provides for applicability of the Domestic Supply tariff to the BnB’s/Home Stays and or granting any other relief which this Hon’ble Commission deems fit in the facts and circumstances of the present case. 09.08.2023
 
52 Petition No. 44 of 2023 Punjab State Power Corporation Limited Petition under Section 86(1)(b) & (e) and Section 61(h) of the Electricity Act, 2003 read with the Punjab State Electricity Regulatory Commission (Power Purchase and Procurement Process of Licensees) Regulations, 2012 and Regulation 46 of the Punjab State Electricity Regulatory Commission (conduct of business) Regulations, 2005 seeking approval of the Power Procurement of 500 MW Solar Power from SJVN Green Energy Limited (SGEL) under TRANCHE-III of Phase II of CPSU scheme of MNRE. 18.12.2023
 
53 Petition No. 45 of 2023 M/s Chadha Sugars and Industries Pvt. Ltd Petition Under Section 86 (1) (f) of the Electricity Act, 2003 for quashing/setting aside the demand/recovery notice dated 24.01.2023 issued by PSPCL as well as minutes of meeting dated 22.03.2023. 06.03.2024
 
54 Petition No. 46 and 47 of 2023 Punjab State Power Corporation Limited Petition under Section 86 (1)(b) and (f) of the Electricity Act, 2003 on behalf of Punjab State Power Corporation Limited for quashing and setting aside the invoice No. NPL/CD/JU/PSPCL/SEI/230602/1 raised by Respondent/ NPL from making claim of Rs. 164.14 Crore. 09.07.2024
 
55 Petition No. 48 of 2023 GVK Power (Goindwal Sahib) Limited Petition under Section 86(1)(f) of Electricity Act, 2003 seeking quashing of Procurer Preliminary Default Notice dated 01.06.2023 issued by the Respondent, Punjab State Power Corporation Limited on the Petitioner, GVK Power (Goindwal Sahib) Limited under Article 14.3.1. of the Amended and Restated Power Purchase Agreement Dated 26.05.2009. 21.02.2024
 
56 Petition No. 49 of 2023 Punjab State Power Corporation Limited Petition under Regulation 19, 20 and 21 of Punjab State Electricity Regulatory Commission (Power Quality) Regulations, 2023 and Regulation 69, 70, 71 & 72 of Chapter XIII of the Conduct of Business Regulations 2005 for allowing time extension to designated consumers for installation of Power Quality Meters. 06.12.2023
 
57 Petition No. 51 of 2023 M/s Ultra Tech Cement Pvt. Ltd Petition under Conduct of Business Regulations 2005 seeking directions to the Respondent No. 01 to complete and Commission the power supply arrangements to the petitioner factory at the earliest as interim measure supply power to the petitioner from the power plant of Respondent No. 03 located at Village Nalash and under PPA of total generation with the Respondent No. 01, to supply power to the Petitioner in time frame given in the Supply Code 2014, until commissioning of the permanent supply arrangements i.e. 220 kV link line of Respondent No. 01 and 02 which in under construction as deposit work. 07.03.2024
 
58 Petition No. 53 of 2023 Punjab State Power Corporation Limited Petition for Amendment of Punjab State Electricity Regulatory Commission (Grid Interactive Rooftop Solar Photo Voltaic System) Regulations, 2021. 11.03.2024
 
59 Petition No. 54 of 2023 Punjab State Power Corporation Limited Petition for One Time Settlement offer on behalf of M/s Malwa Industries Ltd. against A/c Nos:- i) M/s Malwa Industries Ltd. A/c No. MW01-00035, ii) M/s Malwa Garments Units A/c No. MW01-00038. 22.11.2023
 
60 Petition No. 55 of 2023 Punjab State Power Corporation Limited Petition for the Determination of Additional Surcharge u/s 42 (4) of the Indian Electricity Act-2003 read with Regulation 27 of Punjab State Electricity Regulatory Commission (Terms and Conditions for Intra-State Open Access) Regulation, 2011 to be made applicable on the open access consumers availing power from the sources other than PSPCL for the period 01.10.2023 to 31.03.2024. 16.10.2023
 
61 Petition No. 56 of 2023 M/s Focal Point Industrial Welfare Association Petition for amendment in Regulation 16 of Supply Code, 2014 04.06.2024
 
62 Petition No. 57 of 2023 Punjab State Power Corporation Limited Petition under section 86(1)(b) and (e) of the Electricity Act, 2003, as read with the applicable provisions under the Punjab State Electricity Regulatory Commission (Power Purchase and Procurement Process of Licensees) Regulations, 2012; Regulation 46 of the Punjab State Electricity Regulatory Commission (Conduct of Business) Regulations, 2005 for approval of power procurement from 1MW Power Plant based on patented technology in the field of flywheel of Kamma Gear Flywheel Pvt. Ltd., in terms of the Power Purchase Agreement dated 24.07.2023. 30.01.2024
 
63 Petition No. 58 of 2023 Flying Stag Bikes Pvt. Ltd Petition under Regulation 58 Chapter (IX) & Regulation 68, 69, 70, 71 of Chapter (XIII) of Conduct of Business Regulations, 2005 of PSERC, issued under Electricity Act, 2003 and under Regulations 44, 45, 46 and of supply Code, 2014 framed under Section 181 of the Electricity Act, 2003 for seeking compliance of Regulations notified by PSERC and take suitable action against the respondents under section 142, 146 of the Electricity Act, 2003 for not complying with the provisions of Supply Code, 2014. 16.04.2024
 
64 Petition No. 60 of 2023 Punjab State Power Corporation Limited Petition for approval of feed-in-tariff for the purpose of Net-Billing and Gross-Metering arrangement under the PSERC (Grid Interactive Rooftop Solar Photo Voltaic Systems) Regulations 2021 for the period 18.08.2021 to 31.03.2022. 07.05.2024
 
65 Petition No. 62 of 2023 Everest Power Private Limited Petition under Section 62 and Section 86 of the Electricity Act, 2003 read with Regulation 39.7 of the Punjab State Electricity Regulatory Commission (Terms and Conditions for Determination of Generation, Transmission, Wheeling and Retail Supply Tariff) Regulations, 2014 and Regulation 38.7 of the Punjab State Electricity Regulatory Commission (Terms and Conditions for Determination of Multi Year Tariff) Regulation, 2019 for recovery of under-recovered energy charges from the Respondents due to shortfall in energy generation during the FY 2017-18, FY 2018-19, FY 2020-21, FY 2021-22 and FY 22-2023. 14.06.2024
 
66 Petition No. 65 of 2023 Universal Biomass Energy Pvt. Ltd Petition under Section 62 and Section 86 of the Electricity Act, 2003 and Regulation 56 of the PSERC (Conduct of Business) Regulations, 2005 read with Regulation 7 of the CERC (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2020 and Article 2.1.1(i) of the Power Purchase Agreement dated 02.06.2009 (as amended on 26.02.2011 and 10.06.2011). 09.02.2024
 
67 Petition No. 67 of 2023 Suo-Motu Procedure for Banking of Power and Model Banking Agreement for Green Energy Open Access Consumers submitted by PSPCL in compliance of directions under Regulation 28 (6) of the Punjab State Electricity Regulatory Commission (Terms & Conditions for Intra-State Open Access) Regulations, 2011 as amended from time to time. 12.07.2024
 
68 Petition No. 68 of 2023 Punjab State Power Corporation Limited Petition under 86(1)(b) and 86(1)(e) of the Electricity Act, 2003, as read with Punjab State Electricity Regulatory Commission (Power Purchase and Procurement Process of Licensees) Regulations, 2012 for the approval of Power Procurement of 300 MW Solar Photo-Voltaic (PV) power from Solar Energy Corporation of India (SECI) under ISTS Connected Tranche IX Scheme pursuant to the competitive bidding conducted by SECI. 27.12.2023
 
69 Petition No. 71 of 2023 Punjab State Power Corporation Limited Application under Clause 4.12 of Appendix 3-A and Clause 4.4 of Appendix 3-C of the Punjab State Electricity Regulatory Commission (Conduct of Business) Regulations, 2005 seeking approval for acquisition of GVK Power (Goindwal Sahib) Limited, a power generation company. 03.01.2024
 
70 Petition No. 72 of 2023 Suo-moto Proposal of Punjab State Power Corporation Limited to undertake procurement of Power Quality Meters for the designated consumers and charge meter rent from these consumers in compliance of the direction under the Punjab State Electricity Regulatory Commission (Power Quality) Regulations, 2023. 24.01.2024