Sr.No. | Petition No. | Filed By | Subject Matter | Date of Final Decision | |
---|---|---|---|---|---|
01 | IA No. 22 of 2022 in I.A No. 13 of 2021 in Petition No. 31 of 2014 | Talwandi Sabo Power Limited | Interlocutory Application (IA) for seeking clarification in Order dated 11.03.2022 passed by Hon’ble PSERC in IA No. 13 of 2021 in Petition No. 31 of 2014. | 18.01.2023 | |
02 | IA No. 28 of 2022 in Petition No. 15 of 2017 | Photon Sunbeam Pvt. Ltd. | Application filed for passing of appropriate orders in Petition No. 15 of 2017. | 31.10.2023 | |
03 | Review Petition No. 01, 02 and 03 of 2022 | Mohan Dai Oswal Cancer Treatment & Research Foundation | Review Petitions/Applications under Section 94(1) (f) of Electricity Act, 2003 read with Section 64 (Chapter XIII) of PSERC (Conduct of Business) Regulations and other applicable provisions of the Electricity Act, 2003 and applicable Regulations formulated for Reviewing the order dated 22.03.2022 rendered by the Commission in Petition No. 20 of 2021 and 39 of 2021. And for other reliefs as prayed for. | 23.08.2022 | |
04 | Review Petition No. 04 of 2022 | KRBL Limited | Review Petition/Application under Section 94(1) (f) of Electricity Act, 2003 read with Section 64 (Chapter XIII) of PSERC (Conduct Business) Regulations and other applicable provisions of the Electricity Act, 2003 and applicable Regulations framed by this Hon’ble Commission formulated for Reviewing the order dated 04.05.2022 rendered by this Hon’ble Commission in Petition No. 53 of 2021. | 12.12.2022 | |
05 | Review Petition No. 05 of 2022 in Pt. No. 68 of 2021 | Punjab State Power Corporation Limited | Review Petition under Section 94 (1) (f) of the Electricity Act, 2003 against the Tariff Order dated 31.03.2022 for financial year 2022-23 in Petition No. 68 of 2021 | 08.02.2023 | |
06 | Review Petition No. 06 of 2022 in Pt. No. 37 of 2021 | Punjab State Power Corporation Ltd | Petition under Section 94 (1) (f) of the Electricity Act, 2003, read with Regulation 64 of the Conduct of Business Regulations, 2005 of the PSERC Conduct of Business Regulations seeking review of the Order dated 04.05.2022 passed by the Commission in Petition No. 37 of 2021. | 20.07.2023 | |
07 | Review Petition No. 07 & 08 of 2022 in Petition No. 52 of 2021 | Vardhman Textiles Ltd | Review of Order dated 21.01.2022 passed in petition No. 52 of 2021 (Suo Motu) Titled PR Circular No. 09/2021 dated 05.07.2021 and PR Circular No. 11/2021 dated 07.07.2021 regarding power Regulatory Measures on Industrial Consumers (except Essential Industries/Services and Other exempted Categories from 08.07.2021 to 11.07.2021 to 11.07.2021 in all DS Zones”. | 21.12.2022 | |
08 | Review Petition No.09 of 2022 in Petition No. 46 of 2022 | Kamaljeet Kaur wife of Kirpal Singh | Review Petition under Section 64 of the PSERC (Conduct of Business) Regulations, 2005, praying for review of the order dated 27.10.2022 passed by the Commission in Petition no. 46 of 2022 vide which the petition filed by the petitioner under Regulations 44,45,46 of PSERC ( Electricity Supply Code and Related Matters), Regulations, 2014, read with Regulation 69 of the PSERC (Conduct of Business) Regulations, 2005, seeking interpretation/clarification regarding category, out of categories mentioned in explanation (b) of section 126 of the Act, under which unauthorized use of electricity as mentioned in second proviso to Regulation 36.1.3 of the PSERC (Electricity Supply Code and Related Matters) Regulations, 2014 falls because as per Annexure-8 attached with the PSERC (Electricity Supply Code and Related Matters) Regulations, 2014 the method to calculate the electricity charges in case of unauthorized use of electricity is different for each category, was dismissed. | 17.02.2023 | |
09 | Petition No. 01 of 2022 | Everest Power Private Ltd | Petition for approval of Annual Fixed Cost for 100 MW Malana-II Hydro- Electric Project for Multi Year Tariff (MYT) Control Period (FY 2017-18 to FY 2019-20) for true up of FY 2019-20 under section 62 and 64 of the Electricity Act. 2003 read with Regulation 63 of PSERC (Terms and Conditions for Determination of Generation, Transmission, Wheeling and Retail Supply Tariff), Regulations, 2014 and Multi Year Tariff (MYT) Control Period (FY 2020-21 to FY 2022-23) for Annual Performance Review for FY 2020-21& FY 2021-22 and Projections for FY 2022-23 under section 62 and 64 of the Electricity Act. 2003 read with Regulation 63 of PSERC (Terms and Conditions for Determination of Generation, Transmission, Wheeling and Retail Supply Tariff), Regulations, 2019 | 23.08.2022 | |
10 | Petition No. 02 of 2022 | Prayatna Developers Private Limited | Petition under Section 86 of the Electricity Act, 2003 read with Article 16 of the Power Purchase Agreements dated 12.01.2016 seeking directions to quash the Demand Notices dated 03.12.2021 issued by Punjab State Power Corporation Limited. | 08.08.2022 | |
11 | Petition No. 03 of 2022 | Punjab State Power Corporation Limited | Petition under Regulation 47 of Supply Code-2014 and Regulation 69,70,71 and 72 of Chapter XIII of the conduct of Business Regulations 2005 for introduction of One Time Settlement Scheme for waiving off interest on arrears, on account of voltage surcharge amount recoverable as per Hon’ble Supreme Court judgments dated 01.03.2017 & 19.06.2017, being non-tariff income. | 27.04.2022 | |
12 | Petition No. 04 of 2022 | GVK Power (Goindwal Sahib) Limited | Petition filed for seeking quashing of Procurer Preliminary Default Notice dated 29.10.2021 issued by PSPCL to GVK and Letter dated 26.01.2022 whereby PSPCL has sought to terminate the Amended and Restated PPA dated 26.05.2009. | 21.02.2024 | |
13 | Petition No. 06 of 2022 | Suo-Motu | Petition (Suo-Motu) for approval of Feed-in-Tariff for the purpose of Net-billing and Gross-metering arrangement under PSERC (Grid Interactive Rooftop Solar Photo Voltaic Systems) Regulations, 2021. | 06.04.2022 | |
14 | Petition No. 07 of 2022 | Punjab State Power Corporation Limited | Petition under Section 23 of the Electricity Act, 2003 seeking Regulatory Guidance for Measures to be taken by PSPCL in case of exigencies leading to power cuts for the Tariff Year 2022-23. | 31.03.2022 | |
15 | Petition No. 08 of 2022 | Punjab State Power Corporation Limited | Petition for approval of Fuel Cost Adjustment (FCA) Surcharge for 3rd Quarter (October, 2021 to December, 2021) to FY 2021-22. | 31.03.2022 | |
16 | Petition No. 09 of 2022 | Punjab State Power Corporation Ltd | Petition under Section 63, 86 (1) (b) and (e) of the Electricity Act, 2003 read with Punjab State Electricity Regulatory Commission (Power Purchase and Procurement process of Licensees) Regulations, 2012 and Regulation 46 of the Punjab State Electricity Regulatory Commission (Conduct of Business) Regulations, 2005 for adoption of tariff for grid connected 150 MW Solar Power projects located anywhere in Punjab and approval of power procurement in respect thereof. | 28.04.2022 | |
17 | Petition No. 10 of 2022 | Punjab State Power Corporation Limited | Petition Under section 36 of the Electricity Act, 2003 seeking approval for maintenance charges w.r.t. private DTL 66 kV line for M/s Trident Group of Industries form its Dhaula unit to Sanghera unit, under P&M Circle, PSPCL, Patiala. | 19.10.2022 | |
18 | Petition No. 11 of 2022 | Indian Sucrose Ltd | Petition Under section 86 of the Electricity Act, 2003 for non-compliance of order dated 02.11.2021, passed by the Commission in Review petition No. 02 of 2021 in petition No. 41 of 2020. | 04.05.2022 | |
19 | Petition No. 12 of 2022 | Talwandi Sabo Power Limited | Petition under Section 86 of the Electricity Act 2003 read with Article 18.1 of the Power Purchase Agreement dated 01.09.2008 seeking directions to approve and take on record the Supplementary Agreement dated 07.03.2022 executed between Talwandi Sabo Power Limited and Punjab State Power Corporation Limited amending the PPA dated 01.09.2008 | 06.04.2022 | |
20 | Petition No. 13 of 2022 | Punjab State Power Corporation Ltd. | Petition under Section 86 (1) (b) and (e) of the Electricity Act, 2003read with the Punjab State Electricity Regulatory Commission (Power Purchase and Procurement Process of Licensees) Regulations, 2012 and Regulation 46 of the Punjab State Electricity Regulatory Commission (Conduct of Business) Regulations, 2005 for the approval of the power procurement of Punjab State Power Corporation Limited (PSPCL) from the 4 No. Solar PV Power Projects of 4 MW each to be established by Punjab Energy Development Agency (PEDA) in the State of Punjab. | 01.06.2022 | |
21 | Petition No. 14 of 2022 | Arc Engineering Pvt. Ltd. | Petition under Regulation 44, 45, 46 and 47 of the Punjab State Electricity Regulatory Commission (Electricity Supply Code Related Matters) Regulations, 2014, r/w Section 86 and 94 of the Electricity Act, 2003 and Section 9 of Punjab State Electricity Regulatory Commission (Conduct of Business) Regulations, 2005, for issuing an Order, Directions or Instructions to the effect that any unit such as Induction furnaces, Chloroalkaline units, Billet heaters, Surface hardening Machines, Electrolytic process industries, Electrical Bell Furnaces, for Annealing, Arc Furnaces (including Electro Slag Refining units) etc., with a capacity of less than 100 KVA cannot be categorized and treated as a Power Intensive Unit for any purpose, including, but not limited to, panelizing for UUE and levy of PIU tariff. | 18.01.2023 | |
22 | Petition No. 15 of 2022 | Punjab State Power Corporation Limited | Petition for the Determination of Additional Surcharge u/s 42 (4) of the Indian Electricity Act-2003 read with Regulation 27 of Punjab State Electricity Regulatory Commission (Terms and Conditions for Intra-State Open Access) Regulation,2011 to be made applicable on to the open access consumers availing power from the sources other than PSPCL for the period 01.04.2022 to 30.09.2022. | 31.03.2022 | |
23 | Petition No. 16 of 2022 | Punjab State Power Corporation Limited | Petition for the Determination of Additional Surcharge U/S 42 (4) of the Electricity Act-2003 read with Regulation 27 of the Punjab State Electricity Regulatory Commission (Terms and Conditions for Intra-State Open Access) Regulations, 2011 to be made applicable on to the open access consumers availing power from the sources other than PSPCL for the period 01.04.2022 to 30.09.2022. | 03.08.2022 | |
24 | Petition No. 17 of 2022 | Resident Welfare Association | Resident Welfare Association Section -123, Phase-2, Sunny Enclave, Mohali (SAS Nagar), Punjab through its President Sh. Vinod Kakkar aged around 65 years S/o Shri Madan Lal, R/o H. No. 1236, Phase-2, Sector-123, Near Hasanpura Village, Sunny Enclave, Mohali, (SAS Nagar), Punjab. | 12.05.2022 | |
25 | Petition No. 18 of 2022 | Sukhjinder Singh & Ors. | Petition under Section 43 of the Electricity Act, 2003 read with Regulation 5.1 of the Supply Code, 2014 and other relevant rules and regulations as approved by Hon’ble Commission including 68, 69, 70, 71 and 72 and other relevant provisions of Chapter XIII of the Conduct of Business Regulations 2005 as amended up to date and the provisions of the Electricity Act, 2003 for directing the respondents to render respective Domestic Supply Electricity connection to the residents for their residential houses in the Society colony Sunny Basant, Sector-117 (Sector-117). | 12.05.2022 | |
26 | Petition No. 19 of 2022 | Punjab State Power Corporation Limited | Petition under section 61, 62(1)(a), 86, 94 and other applicable provisions of the Electricity Act, 2003 seeking revision of the variable cost of the existing Biomass and bagasse based power projects in the State of Punjab and revision of annual rate of 5 % escalation of the variable cost of the existing biomass and bagasse based power projects in the state of Punjab. | 13.03.2024 | |
27 | Petition No. 20 of 2022 | Talwandi Sabo Power Limited | Petition Under Section 86(1)(f) of the Electricity Act, 2003 read with Clause 1.10.1 of the Punjab State Grid Code as well as applicable provisions of the Power Purchase Agreement dated 01.09.2008 executed between the Petitioner and the Respondent Inter Alia seeking declaration that the non-availability of coal is due to failure of the Respondent No. 1 to fulfill its obligation to arrange adequate quantity and assured quality of coal; the findings and decision of the Respondent No. 3, as recorded in paragraph 1 of the minutes dated 22.12.2021 of the 26th Meeting held on 23.11.2021 are unlawful, arbitrary, bad in law; and consequential reliefs thereof | 11.01.2023 | |
28 | Petition No. 21 of 2022 | Avnidha Gupta & Ors. | Petition under Section 43 of the Electricity Act, 2003 read with Regulation 5.1 of the Supply Code, 2014 and other relevant rules and Regulations as approved by Hon’ble Commission including 68, 69, 70, 71, 71 and 72 and other relevant provisions of Chapter XIII of the Conduct of Business Regulations 2005 as amended up to date and provisions of the Electricity Act, 2003 for directing the Respondents to render respective permanent Domestic Supply Electricity connection to the petitioners for their residential houses in the colony. | 10.08.2022 | |
29 | Petition No. 22 of 2022 | Talwandi Sabo Power Limited | Petition under Section 86 of the Electricity Act 2003 read with Article 18.1 of the Power Purchase Agreement dated 01.09.2008 seeking directions to approve and take on record the Supplementary Agreement dated 09.05.2022 executed between Talwandi Sabo Power Limited and Punjab State Power Corporation Limited amending the PPA dated 01.09.2008. | 19.05.2022 | |
30 | Petition No. 23 of 2022 | Punjab Energy Development Agency | Petition under Section 62 of Electricity Act, 2003 Chapter VI of Conduct of Business Regulations and MYT Regulations 2014 read with other relevant provisions of the Electricity Act 2003 as well as Regulations framed by this Commission from time to time, for Pradhan Mantri Kisan Urja Suraksha Evam Utthaan Mahabhiyaan (PM-Kusum) Scheme of setting up grid connected solar power plants of individual capacity ranging from 500 KW to 2 MW under Component –A and determination of Levelized ceiling tariff for setting up of grid connected solar power plants of capacity ranging from 500 KW to 5 MW for feeder level solarization of grid connected agriculture pumps. | 11.11.2022 | |
31 | Petition No. 24 of 2022 | Vijay Kumar, S/o Sh. Gopal Dass | Petition under Section 43 of the Electricity Act, 2003 read with Regulation 5.1 of the Supply code, 2014 and other relevant rules and regulations as approved by Hon’ble Commission including 68, 69, 70, 71 and 72 and other relevant provisions of Chapter XIII of the Conduct of Business Regulations 2005 as amended up to date and the provisions of the Electricity Act, 2003 for directing the Respondents to render respective permanent/ Temporary Domestic Supply Electricity Connection to the Petitioners for their residential houses/Plots in the colony. | 25.07.2023 | |
32 | Petition No. 25 and 26 of 2022 | Petition No. 25 of 2022, SAEL Limited and Petition No. 26 of 2022, Universal Biomass Energy Pvt. Ltd | Petitions under Section 86 (1)(b), 86 (1)(c), 86(1)(e) , 86(1) (f), 86(1)(k) and 86(4) of the Electricity Act, 2003 read with Regulations 9(1), 69, 72 and 74 of Punjab State Electricity Regulatory Commission (Conduct of Business) Regulations, 2005; seeking issuance of appropriate direction(s)/order(s) against the respondent for illegal deduction of lawful tariff payment due and payable to the Petitioners. | 15.11.2022 | |
33 | Petition No. 27 of 2022 | Punjab State Power Corporation Limited | Petition for approval under Section 86 (1) (b) of the Electricity Act, 2003 for the Power Procurement plan on Short Term basis for FY 2022-23 read with the Public notice issued by Punjab State Electricity Regulatory Commission dated 23.10.2012. | 09.08.2022 | |
34 | Petition No. 28 of 2022 | M/s Euthoria Developer Pvt. Ltd. | Petition under section 142 of the Electricity Act, 2003 read with section 94 and other relevant provisions of the Electricity Act, 2003 read with Regulations, 45, 46 and 47 of the Supply Code 2014 other relevant rules and regulations as approved by Hon’ble Commission including regulation 69, 71 and 72 and other relevant provisions of Chapter XIII of the Conduction of Business Regulations 2005 as amended upto date for taking necessary action against the PSPCL for not complying with the directions given by this Hon’ble Commission and violating the provisions of the franchisee agreement, as approved by this Hon’ble Commission, and stopping the Single Point rebate to the petitioner and also issuing a demand for recovering the already paid single point rebate to the petitioner, without complying with the clause 19 of the Franchisee Agreement, i.e. in case of any dispute to first go for amicable settlement and in case of no settlement to approach sole arbitrator. | 03.08.2022 | |
35 | Petition No. 29 of 2022 | Punjab State Power Corporation Limited | Petition Under Section 42, 86 and other applicable provisions of Electricity Act, 2003 seeking approval of the Terms and the Conditions or banking Facility to be provided to Solar Captive Power Plants in the State of Punjab. | 19.04.2023 | |
36 | Petition No. 30 of 2022 | Punjab State Power Corporation Ltd | Petition under Section 86 (1) (e) of the Electricity Act, 2003 as read with Regulation 3(2), 6(2) and 7 of the Punjab State Electricity Regulatory Commission (Renewable Purchase Obligation and its Compliance) Regulations, 2011 for carrying forward the shortfall of Renewable Purchase Obligation (RPO) of Punjab State Power Corporation Limited for the FY 2021-22 to FY 2022-23. | 06.01.2023 | |
37 | Petition No. 31 of 2022 | Punjab Genco Limited | Petition under Section 62 of Electricity Act, 2003, Chapter VI of Conduct of Business Regulations read with other relevant provisions of the Electricity Act, 2003 as well as Regulations framed by this Commission from time to time for Determination of Project Specific Levellized Tariff for 200 kW Solar Power Projects set up by the Petitioner at Khatkar Kalan, Nawanshahar, Punjab for sale of Solar Power generated there from to the Respondent PSPCL i.e. the DISCOM in the State of Punjab, under a PPA, for a period of 25 years. | 27.10.2022 | |
38 | Petition No. 32 of 2022 | Punjab State Power Corporation Limited | Petition under Regulation 36 of the MYT Regulation, 2019 and other applicable Regulations by Punjab State Power Corporation Ltd. for seeking and consideration of addition of cost on account of use of Biomass Pellets along with Coal and Oil to be used as fuel at Punjab State Power Corporation Ltd. Thermal Generating Units (Guru Gobind Singh Super Thermal Plant, Ropar & Guru Hargobind Thermal Plant, LehraMohabbat) for Generation of Electricity. | 27.10.2022 | |
39 | Petition No. 33 of 2022 | Kalpana Tiwari wife of Sh. Rajjan Kumar Tiwari | Petition under Section 43 of the Electricity Act, 2003 read with Regulation 5.1 of the Supply Code, 2014 and other relevant rules and regulations as approved by the Commission including 68,69,70,71 and 72 and other relevant provisions of Chapter XIII of the Conduct of Business Regulations 2005 as amended up to date and the provisions of the Electricity Act, 2003 for directing the Respondents to render respective permanent Domestic Supply Electricity Connection to the Petitioners for their residential Flats in the colony and with a further prayer to grant urgent and immediate hearing of the matter and for passing any other relief in favour of the petitioner as the Commission may deem fit in the facts and circumstances of the case. | 25.07.2023 | |
40 | Petition No. 34 of 2022 | Punjab State Power Corporation Limited | Petition under Regulation 47 of PSERC (Electricity Supply Code and related matters) Regulation 2014 and clause 68 & 69 of PSERC (Conduct of Business) Regulation, 2005 regarding Voluntary Disclosure Scheme (VDS) for Agriculture (AP) Consumers. | 22.06.2022 Corrigendum to Order 04.11.2022 |
|
41 | Petition No. 35 of 2022 | Mr. Mastan Singh | Petition in the matter of non-compliance of Supply Code (2014) Reg. 6.8.5 & 6.8.7 (b) regarding issues of (A.P) agriculture pump set electric connection to the petitioner for his agriculture land and in the light of the Suo Moto limitation extension order by the Hon’ble Apex Court of India. | 08.05.2023 | |
42 | Petition No. 36 of 2022 | M/s Trishla Buildtech Pvt. Ltd | Petition under Regulation 4.2,6,44,45,46 and 47 of the Supply Code, 2014 and other relevant Order/rules regulations as approved by the Commission including 68,69,70,71 and 72 and other relevant provisions of Chapter XIII of the Conduct of Business Regulations 2005 as amended up to date for directing the Respondent-PSPCL to immediately render revised NOC to the petitioner in terms of revised load sheet submitted by the petitioner on 19.04.2021 with an estimated load 3832.22 KVA for the total project as per the formula suggested by CMD-PSPCL and Director-PSPCL during the meeting held with them, whereby it was decided to revise the load sheet by considering 177 connection in old norms and rest in new norms and render connectivity at 11 kV system of PSPCL. | 21.10.2022 | |
43 | Petition No. 37 of 2022 | Pushap Paul Sharma | Petition under Section 43 of the Electricity Act, 2003 read with Regulation 5.1 regulation 44,45,46 and 47 of the Supply Code, 2014 and other relevant rules and regulations as approved by Hon’ble Commission including 68,69, 70, 71 and 72 and other relevant provisions of Chapter XIII of the Conduct of Business Regulations 2005 as amended upto date and the provisions of the Electricity Act, 2003 for directing the respondents to render respective permanent Domestic supply Electricity Connections to the petitioners for their residential houses in the colony. | 28.07.2023 | |
44 | Petition No. 38 of 2022 | Kanin Industries Private Limited | Petition under Section 142 of the Electricity Act, 2003 for initiation of appropriate action against the Respondents for willful contravention of the directions rendered by the Commission contained in the order dated 26.06.2019 passed in Petition No.49 of 2017 (M/s Singhania International Limited vs PSPCL). | 30.11.2022 | |
45 | Petition No. 39 of 2022 | Winsome Yarns Limited | Petition under clause 43 of Punjab State Electricity Regulatory Commission (Terms and conditions for Intra-State Open Access) Regulations, 2011, for setting aside the order passed by the CMC in its 26th meeting dated 23.11.2021, in the case of the petitioner, vide which the credit of the electricity injected by the MHP’s of the petitioner in the grid during the gap period the STOA agreements expired and the MTOA agreements executed was denied; and further for issuance of necessary directions to the respondents to adjust/ account for as wheeled energy the electricity generated from the five Mini Hydro Projects (MHPs) of the petitioner and injected in the grid for the gap period the STOA signed for the above said five MHPs were expired and MTOA agreements were signed. | 21.04.2023 | |
46 | Petition No. 40 of 2022 | Indian Railways Vs PSPCL | Petition filed under Section 86, 142, 146 and 149 of the Electricity Act, 2003 read with Regulation 10 of the Punjab State Electricity Regulatory Commission (Conduct of Business) Regulations, 2005 against Punjab State Power Corporation Limited for Non-compliance of this Commission’s Order dated 22.03.2022 passed in petition no. 14 of 2021 | 21.07.2023 | |
47 | Petition No. 41 of 2022 | Gill Acqua Hydro Power Generation Company Pvt. Ltd. | Petition under Section 86 (1) (f) of the Electricity Act, 2003 seeking adjudication of disputes between the petitioner and the respondent PSPCL herein in respect of the claims of the petitioner totaling Rs. 39,22,037/- alongwith interest and costs arising out of and in connection with the Power Purchase Agreements dated 20.11.2008 and 04.06.2009. | 06.02.2023 | |
48 | Petition No. 42 of 2022 and 43 of 2022 |
Punjab State Power Corporation Ltd. | Petition under Section 63 read with Section 86 of the Electricity Act, 2003 and Clause 3.1.1 (c) and 18 of the Guidelines for Tariff Based Competitive Bidding Process notified by Ministry of Power on 03.08.2017 for Procurement of Power from Grid Connected Solar PV Power Projects for approval of deviations from the said Guidelines. | 04.08.2022 | |
49 | Petition No. 44 of 2022 | Punjab State Power Corporation Limited | Petition for Approval of Fuel Cost Adjustment (FCA) Surcharge for 4th Quarter of FY 2021-22. | 27.09.2022 | |
50 | Petition No. 45 of 2022 | Punjab State Power Corporation Limited | Voluntary Disclosure Scheme (VDS) for Domestic (DS), Non Residential (NRS) under regulation 47 of PSERC Regulation 2014 and clause 68 & 69 of PSERC (conduct of business) regulations, 2005. | 30.09.2022 Corrigendum to order |
|
51 | Petition No. 46 of 2022 | Kamaljeet Kaur wife of Kirpal Singh | Petition under regulations 44, 45, 46 of PSERC (Electricity Supply code and related matters), Regulations, 2014, read with regulation 69 of the Punjab State Electricity Regulatory Commission (Conduct of Business) Regulations, 2005, for seeking interpretation / clarification regarding category, out of categories mentioned in explanation (b) of section 126 of the Act, under which unauthorized use of electricity as mentioned in second proviso to regulation 36.1.3 of the Punjab State Electricity Regulatory Commission (Electricity Supply code and Related Matters) Regulations, 2014 falls, because as per Annexure 8 attached with the Punjab State Electricity Regulatory Commission (Electricity Supply Code and Related Matters) Regulations, 2014, the method to calculate the electricity charges in case of unauthorized use of electricity is different for each category… Further petition under section 94 and other relevant provisions of the Electricity Act, 2003, for staying the further proceedings pursuance to the alleged notice issued by the PSPCL on account of alleged un-authorized of electricity, till the clarification/ interpretation is provided by this Hon’ble Commission. | 27.10.2022 | |
52 | Petition No. 47 of 2022 | Punjab State Power Corporation Limited | Petition under Section 86 of the Electricity Act, 2003, seeking Approval of the Procedure for determination of Captive Power Status. | 07.05.2023 | |
53 | Petition No. 48 of 2022 | Bhakra Beas Management Board | Petition under Section 86(1)(c) of the Electricity Act, 2003 read with Section 39 of the Electricity Act, 2003 and Regulations 10, 13, 14, 15, 16, 23, 24, 25 and 45 of the Punjab State Electricity Regulatory Commission (Terms and Conditions for Intra-state Open Access) Regulations, 2011 and Regulations 10 of the Punjab State Electricity Regulatory Commission (Conduct of Business) Regulations, 2005. | 10.01.2023 | |
54 | Petition No. 49 of 2022 | PUNJAB STATE POWER CORPORATION LIMITED | BUSINESS PLAN INCLUDING CAPITAL INVESTMENT PLAN FOR MYT CONTROL PERIOD FROM FY 2023-24 TO FY 2025-26. | 11.01.2023 | |
55 | Petition No. 50 of 2022 | PSTCL | PETITION NO. 50 OF 2022 FILED BY PUNJAB STATE POWER TRANSMISSION CORPORATION LIMITED FOR BUSINESS PLAN INCLUDING CAPITAL INVESTMENT PLAN FOR MYT CONTROL PERIOD FROM FY 2023-24 TO FY 2025-26. | 21.12.2022 | |
56 | Petition No. 51 of 2022 | Chandigarh Distillers and Bottlers Ltd | Petition under Section 86(1)(b), 86(1)(e), 86(1)(f), 86(1)(k) and 86 (4) of the Electricity Act, 2003 read with Regulation 9 (1) and Regulation 69, Regulation 72, Regulation 74 of the Punjab State Electricity Regulatory Commission (Conduct of Business) Regulations, 2005 seeking issuance of appropriate directions/order(s) against the respondent for raising illegal/unlawful demand of Rs. 3,10,70,444/- (including share and penal interest) on account of share in the CDM benefit for the period to the execution of long term PPA and forcibly deducting the same from due tariff bills of the petitioner and further claiming Rs. 12,45,911/- on account of late payment for the period 13.11.2021 to 27.06.2022. | 11.07.2023 | |
57 | Petition No. 52 of 2022 | Suo - Motu | Report on compliance of Order dated 17.05.2022 of the Ombudsman, Electricity, Punjab in Appeal Case No. A-22 of 2022. M/s APS Associates Pvt .Ltd, D-133, Phase-V, Focal Point, Ludhiana Vs PSPCL. | 03.11.2022 | |
58 | Petition No. 53 of 2022 | Talwandi Sabo Power Limited | Petition under Section 86 (1)(f) of the Electricity Act, 2003 read with Article 13 of the Power Purchase Agreement (PPA) dated 01.09.2008. | 17.03.2023 | |
59 | Petition No. 54 of 2022 | Everest Power Private Ltd | Filing of petition for Business Plan including Capital Investment Plan for 3rd MYT Control Period from FY 2023-24 to FY 2025-26 for EPPL’s 100 MW Malana-II Hydro Electric Project situated in Himachal Pradesh. | 11.07.2023 | |
60 | Petition No. 55 of 2022 | Hero Cycles Pvt. Ltd | Petition under (Conduct of Business) Regulation 2005 of PSERC issued under Electricity Act 2003, for seeking compliance of the Regulations issued by PSERC and suitable action against the Respondents for not complying with the provisions of Supply Code 2014 issued by the PSERC. | 28.04.2023 | |
61 | Petition No. 56 of 2022 | Suo-Motu | Petition No. 56 of 2022 (Suo Motu) for determination of Annual Fixed Cost for True-up of FY 2020-21 and FY 2021-22 for EPPL’s 100 MW Malana II Hydro Electric Project situated in Himachal Pradesh. | 01.06.2023 | |
62 | Petition No. 57 & 58 of 2022 | Punjab State Power Corporation Limited | Petition under Section 86 (1) (b) & (f) of the Electricity Act, 2003 regarding deployment of CSIR-CIMFR to undertake sampling and analysis of coal received at the project site of Talwandi Sabo Power Limited, the Respondent herein. | 18.01.2023 | |
63 | Petition No. 59 of 2022 | Suo-Motu | Petition for the Determination of Additional Surcharge u/s 42 (4) of the Indian Electricity Act-2003 read with Regulation 27 of Punjab State Electricity Regulatory Commission (Terms and Conditions for Intra-State Open Access) Regulation, 2011 to be made applicable on to the open access consumers availing power from the sources other than PSPCL for the period 01.10.2022 to 31.03.2023. | 30.09.2022 | |
64 | Petition No. 60 of 2022 | Saraswati Stone Crusher | Petition under Section 142 of the Electricity Act, 2003 and other relevant Rules and Regulations as approved by the Commission including 68,69,70, 71 & 72 and other relevant provisions of Chapter XIII of the Conduct of Business Regulations 2005 as amended up to date and the provisions of the Electricity Act, 2003 for directing the Respondents to withdraw the letter dated 29.09.2022 regarding disconnection of Electricity Connection and for taking action under section 142 against PSPCL for violating the directions of the Commission. | 10.01.2023 | |
65 | Petition No. 61 of 2022 | Punjab State Power Corporation Limited | Petition for the Determination of Additional Surcharge U/S 42 (4) of the Electricity Act-2003 read with Regulation 27 of the Punjab State Electricity Regulatory Commission (Terms and Conditions for Intra-State Open Access) Regulations, 2011 to be made applicable on to the open access consumers availing power from the sources other than PSPCL for the period 01.10.2022 to 31.03.2023. | 10.01.2023 | |
66 | Petition No. 62 of 2022 and IA No. 26 of 2022 | Punjab State Power Corporation Limited | Approval of the Power Purchase Agreements (PPAs) and Procurement Process of Punjab State Power Corporation Limited for the procurement of power from the (1) Shree Ganesh Edibles Private Limited (Paddy based Biomass Project-4 MW); (2) Malbros International Private Limited (Biomass Project -3 MW); and (3) Thind Power Private Limited (Mini Hydel-2 MW) | 19.12.2022 | |
67 | Petition No. 63 of 2022 | Talwandi Sabo Power Limited | Petition under Section 33 read with Section 86 of the Electricity Act and Regulations 14.1.6 of PSERC ( Punjab State Grid Code) Regulations, 2013, challenging the findings returned by Commercial and Metering Committee in the Minutes of its 20th and 21st Meeting dated 19.05.2020 and 24.06.2020 with respect to revision of Talwandi Sabo Power Limited Declared Capacity in the State Energy Account prepared by the Punjab State Load Dispatch Centre for various months during the outage period between 2015 to 2019. | 19.01.2024 | |
68 | Petition No. 64 of 2022 | Northern Railways | Petition under Section 86(1)(e) of the Electricity Act, 2003 read with Regulation 6(2), 7, 8 and 10 of the PSERC (Renewable Purchase Obligation and its Compliance) Regulations, 2011, seeking carry forward of Renewable Purchase Obligation (RPO) for FY 2019-20, FY 2020-21, FY 2021-22 and FY 2022-23 to FY 2023-24 and for seeking relaxation/removal of difficulty/waiver in relation to Regulation 42(2) of the PSERC (Terms and Conditions for Intra-State Open Access) Regulations, 2011. | 11.07.2023 | |
69 | Petition No. 65 of 2022 | Nabha Power Limited | Petition Under Section 86(1)(b) read with 86(1)(f) of the Electricity Act, 2003 and Article 13 of the Power Purchase Agreement dated 18.01.2010 for the approval and consequent compensation due to ‘Change in Law’ , viz., utilization of Bio-mass pellets for power generation consequent to the enactment of the Commission for Air Quality Management in National Capital Region and Adjoining Areas Act, 2021 and the directions issued thereunder, impacting the revenues and costs of the Petitioner. | 17.07.2023 | |
70 | Petition No. 66 of 2022 | Punjab State Power Corporation Limited | Petition under Regulation 8.1 (b) of the supply code 2014 by Punjab State Power Corporation Limited for seeking approval of Hon’ble Regulatory Commission for extension in time period of release of EHT connection under regulation 69, 70, 71 & 72 of chapter XIII of the conduct of Business Regulations 2005. In the Case of New Connection of 4500kV load/ 5000kVA contract demand applied by Divisional Railway Manager (Elect./TRD), Ferozepur through Senior Divisional Electrical Engineer (TRD), DRM office Ferozepur under the category Railway Traction in sub Division Dagru under City Division Moga (RID No. 5967). |
01.06.2023 | |
71 | Petition No. 67 of 2022 | Punjab State Power Corporation Limited | Petition under Regulation 8.1 (b) of the supply code 2014 by Punjab State Power Corporation Limited for seeking approval of Hon’ble Regulatory Commission for extension in time period of release of EHT connection under regulation 69, 70, 71 & 72 of chapter XIII of the conduct of Business Regulations 2005. In the Case of New Connection of 4500kV load/ 5000kVA contract demand applied by Divisional Railway Manager (Elect./TRD), Ferozepur through Senior Divisional Electrical Engineer (TRD), DRM office Ferozepur under the category Railway Traction in sub Division Ghubaya under Division Jalalabad (RID No. 5553). |
01.06.2023 | |
72 | Petition No. 68 of 2022 | Suo Motu | Petition No. 68 of 2022 (Suo Motu) for determination of Annual Fixed Cost for True-up of FY 2020-21 and FY 2021-22 for GVK Power ( Goindwal Sahib) Limited 2x270 MW ( 540 MW) coal based thermal power station at Goindwal Sahib in the State of Punjab. | 12.07.2023 | |
73 | Petition No. 69 of 2022 | Northern India Steel Rolling Mills | Petition under Regulation 47 of Supply code 2014 and Regulation 69, 70, 71 & 72 of Chapter XIII read with Section 10 Chapter II of the Conduct of Business Regulation 2005 for introduction of comprehensive scheme/ relief in shape of One Time Settlement Scheme or any other relevant procedure / method for waiving of interest of arrears, compete surcharge of electricity connections related to consumer specifically to the industrial consumer specifically on account of voltage surcharge amount recoverable as per Hon’ble Supreme Court Judgment dated 18.11.2013, 01.03.2017 and 19.06.2017 being non tariff income. | 17.11.2022 | |
74 | Petition No. 70 of 2022 | Punjab State Power Corporation Limited | Petition for clarification regarding applicability of PIU tariff to M/s Stelco Industries Pvt. Ltd., RampuraPhul using a combination of Hardening and Tempering process under Regulation 69, 70, 71 & 72 of Chapter XIII of the Conduct of Business Regulation, 2005. | 04.11.2024 | |
75 | Petition No. 71 of 2022 | Punjab State Power Corporation Limited | Petition under Regulation 8.1 (b) of the Supply Code 2014 by Punjab State Power Corporation Limited for seeking approval of the Commission for extension in time period of release of EHT Connection under Regulation 69, 70, 71 & 72 of chapter XIII of the Conduct of Business Regulations 2005. In the case of new connection of 4500 kW load/5000 kVA contract demand applied by Divisional Railway Manager (Elect./TRD), Ambala Cantt. Through Sr. D.E.E./TRD/NR/UNB under the category Railway Traction in S/d Suburban Gidderbaha under DS Division, Gidderbaha (RID No. 5903). |
01.06.2023 | |
76 | Petition No. 72 of 2022 | Punjab State Power Corporation Limited | Voluntary Disclosure Scheme (VDS) for Domestic (DS), Non Residential (NRS) under regulation 47 of PSERC Regulation 2014 and clause 68 & 69 of PSERC (Conduct of Business) Regulations, 2005. | 30.11.2022 | |
77 | Petition No. 73 of 2022 | PUNJAB STATE TRANSMISSION CORPORATION LIMITED | PETITION No. 73 OF 2022 FILED BY PUNJAB STATE TRANSMISSION CORPORATION LIMITED FOR TRUE UP OF FY 2021-22, ANNUAL PERFORMANCE REVIEW FOR FY 2022-23, APPROVAL OF ARR FOR THE 3rd CONTROL PERIOD FROM FY 2023-24 TO FY 2025-26 AND DETERMINATION OF TARIFF FOR FY 2023-24. | 15.05.2023 | |
78 | Petition No. 74 of 2022 | PUNJAB STATE POWER CORPORATION LIMITED | PETITION NO. 74 OF 2022 FILED BY PUNJAB STATE POWER CORPORATION LIMITED FOR TRUE UP OF FY 2021-22, ANNUAL PERFORMANCE REVIEW FOR FY 2022-23 and APPROVAL OF ARR FOR THE CONTROL PERIOD FROM FY 2023-24 TO FY 2025-26 AND DETERMINATION OF TARIFF FOR FY 2023-24. | 15.05.2023 | |
79 | Petition No. 75 of 2022 | M/s Everest Power Private Ltd | Petition for approval of Annual Fixed Cost for 100 MW Malana-II Hydro-Electric Project for Multi Year Tariff (MYT) Control Period (FY 2020-21 to FY 2022-23), Revised Estimates as per provisional accounts for FY 2022-23, under Section 62 and 64 of the Electricity Act. 2003 read with Regulation 60 of PSERC (Terms and Conditions for Determination of Generation, Transmission, Wheeling and Retail Supply Tariff), Regulations, 2019 and approval of fixed cost for MYT Control Period (FY 2023-24 to FY 2025-26) read with the PSERC (Terms and Conditions for Determination of Generation, Transmission, Wheeling and Retail Supply Tariff), Regulations, 2022. | 10.10.2023 | |
80 | Petition No. 76 of 2022 | Punjab State Power Corporation Limited | Approval of the Power Purchase Agreements (PPAs) and Procurement Process of Punjab State Power Corporation Limited in respect of Non-Conventional Generating Stations in pursuance to the Order dated 16.12.2020 passed by the Commission in Petition No. 17 of 2020. | 12.12.2023 | |
81 | Petition No. 77 of 2022 | M/s Ritesh Properties and Industries Ltd | Exemption of Bank Guarantee against future installation of 66 kV Sub-station. | 03.01.2024 | |