List of  Commission orders/ judgments passed in various cases.

 

 

 

 

S.No.

Petition No.

Filed by

Subject matter

Date of final decision.

1.

Review Petition No.1 of 2015 in Petition No. 57 of 2014

Surindera Cycles Pvt. Ltd.

Review Petition under Section 64 of the Punjab State Electricity Regulatory Commission (Conduct of Business) Regulations, 2005, praying for review of the Order dated 10.10.2014 passed by this Commission in Petition No.57 of 2014 vide which the petition filed by the petitioner under clause 47, 48, 49 and 50 of the Punjab State Electricity Regulations, 2007 and other relevant sections of the Electricity Act, 2003 read with clause 9 of the Punjab State Electricity Regulatory Commission (Conduct of Business) Regulations, 2005, seeking clarification / modification / interpretation of the proviso of clause 9.1.2 (i) (c) of the Punjab State Electricity Regulatory Commission (Electricity Supply Code and Related Matters), Regulations, 2007; AND further for setting aside the demand raised and charged by the respondent on account of Service Connection Charges for additional load taken by the petitioner, as the petitioner has already paid actual cost of the independent feeder through which the petitioner is getting electricity and the additional load can be fed from the same line / feeder without any augmentation, was dismissed being not maintainable; AND further for deciding the petition No.57 of 2014 filed by the petitioner on merit and for granting the relief prayed in petition No.57 of 2014, in the interest of justice.

24.06.2015

2.

Review Petition No.2 of 2015 in Petition No. 22 of 2015

Lumen Power Pvt. Limited and Supreme Infrastructure India Limited

Review Petition under Clause 64 of PSERC Conduct of Business Regulations, 2005 read with Section 94(1) (f) of the Electricity Act 2003 for reviewing the Order dated 28.04.2015, passed by this Hon’ble Commission, whereby the petition has not been admitted on the ground that petitioner No.1 has no locus-standi to file the captioned petition at this stage.

24.06.2015

3.

Review Petition No. 03 of 2015 in Petition No. 01 of 2015

Punjab State Power Corporation Limited

Review Petition against PSERC order dated 20.05.2015 in Petition No. 01 of 2015 filed by SIEL Chemical Complex under section 142 and 23 and 86 (1) (a) of Electricity Act, 2003 read with Open Access Regulations and Tariff Order for the year 2014-15.

24.08.2015

4.

Review Petition No. 4 of 2015 in Petition No. 3 of 2015

Punjab State Power Corporation Limited

Review Petition against PSERC order dated 20.05.2015 in Petition No. 3 of 2015 filed by M/s Nahar Spinning Mills Ltd., Ludhiana for rendering clarification to PSPCL on applicability of ToD Tariff on power brought in by the petitioner under Open Access and Power Factor and Formula to be taken by PSPCL for converting power under Open Access in kWh to kVAh etc.

24.08.2015

5.

Order in Review Petition No.5 of 2015 in Petition No.51 of 2014

Atlantic Power Private Ltd.

Review Petition under Section 64 of the Punjab State Electricity Regulatory Commission (Conduct of Business) Regulations, 2005, praying for review of the order dated 26.05.2015 passed by this Commission in Petition No.51 of 2014.

06.11.2015

6.

Review Petition No.6 of 2015 in Petition No.51 of 2014

Atlantic Power Private Ltd

Review Application under Section 94 (1) (f) of Electricity Act, 2003 read with Section 64 (Chapter XIII) of PSERC Business Conduct regulations for reviewing the order dated 26.05.2015 rendered by this Commission in Petition No.51 of 2014.

10.09.2015

7.

Order in Review Petition No. 7 of 2015 in Petition No. 17 of 2015

Punjab State Power Corporation Limited

Review Petition under Section 94 of the Electricity Act, 2003 against PSERC Order dated 12.06.2015 in Petition No.17 of 2015 filed by Atma Powers Private Limited for seeking project specific extension of period of commissioning in the PPA for applicability of the tariff of `8.41/Unit.

18.01.2016

8.

Review Petition No. 8 of 2015 in Petition No. 29 of 2015

Punjab State Power Corporation Limited

Review Petition under Section 94 of the Electricity Act, 2003 against PSERC Order dated 26.06.2015 in Petition No.29 of 2015 filed by M/s Mokia Green Energy Private Limited New Delhi for seeking project specific extension of period of commissioning in the PPA for applicability of the tariff of Rs. 8.59/Unit.

22.01.2016

9.

Order in Review Petition No. 9 of 2015 in Petition No. 37 of 2014

Everest Power Private Limited

Review Petition under Section 94(1)(f) of the Electricity Act, 2003, read with Regulation 64 of Punjab State Electricity Regulatory Commission (Conduct of Business) Regulations, 2005 for review of Order dated 31.08.2015 in Petition No.37 of 2014.

29.01.2016

10.

1/2015

Siel Chemical Complex

Petition under Section 142 and Sections 23 and 86(1) (a) of Electricity Act, 2003 read with Open Access Regulations and Tariff Order for the year 2014-15.

20.05.2015

11.

2/2015

Punjab Alkalies & Chemicals Limited

Petition under Clause 23 of General Conditions of Tariff issued by the Commission read with Regulation 5.8 of Punjab State Electricity Regulatory Commission (Electricity Supply Code and Related Matters) Regulations, 2007 (as amended) and Clause 4.4 of Supply Code 2014 and Section 62 of the Electricity Act, 2003 for modification of the General Conditions of Tariff and Schedule of Tariff to charge the lowest tariff applicable to any category and/or creating separate category for Power Intensive Chlor-Alkali Units promoted by the Government of Punjab directly or through its Corporations and Consuming Bulk Power.

05.06.2015

12.

3/2015

Nahar Spinning Mills Limited

Petition under Regulation 45 of PSERC (Terms and Conditions for Determination of Tariff) Regulations 2005 and Para 23 of the General Conditions of Tariff and Regulation 45 of PSERC (Terms and Conditions for Intra-state Open Access) Regulations 2011 and other relevant rules, regulations and procedures approved by Hon’ble Commission for rendering clarification to PSPCL on applicability of ToD Tariff on Power brought in by the Petitioner under open access and power factor & formula to be taken by PSPCL for converting power under open access in kWh to kVAh etc.

20.05.2015

13.

4/2015

Nabha Power Limited

Petition filed under Sections 86 (1) (b) & Section 86(1)(f) of the Electricity Act, 2003 seeking, approval / ratification of the quantum of coal procured by NPL from alternate sources – to run the plant as per the provisions of PPA and pass through of cost of such coal to PSPCL under the PPA for the period between April 2014 to October 2014 in terms of the order passed by this Commission on 19.02.2014 in Petition No.57 of 2013; approval of the suggested modalities for further procurement and pass through of cost of such coal; and allowing continuance of the directions issued in Petition No.57 of 2013 till the final disposal of the Appeal No.68 of 2013.

11.06.2015

14.

5/2015

Goyal Petrofils Yarns (Pvt.) Ltd.

Petition under Section 142 and other relevant provisions of the Electricity Act, 2003 read with regulation 9 of PSERC (Electricity Supply Code and Related Matters) Regulations, 2007 and clause 44 of the Punjab State Electricity Regulatory Commission (Electricity Supply Code and Related Matters) Regulations, 2014 and other relevant provisions of the regulations framed by this Commission, praying for taking necessary action against the respondents for raising impugned demand of Rs.9,59,748/- vide letter memo No.6277 dated 22.12.2014 and Rs.3,71,892/- vide letter memo No.6278 dated 22.12.2014, from the petitioner, on account of Service Connection Charges, being in violation of provisions of regulation 9 of PSERC (Electricity Supply Code and Related Matters) Regulations, 2007 and provisions of the Electricity Act, 2003 and further for setting aside the above said impugning demand.

25.06.2015

15.

6/2015

Punjab State Power Corporation Limited

Petition under Section 23 of the Electricity Act, 2003 seeking regulatory guidelines for measures to be taken in case of exigencies leading to power cuts for the Tariff Year 2015-16.

30.03.2015
Interim Order

15.(a).

6/2015

Punjab State Power Corporation Limited

Petition under Section 23 of the Electricity Act, 2003 seeking regulatory guidance for measures to be taken in case of exigencies leading to power cuts for the Tariff Year 2015-16.

15.04.2015
Final Order

16.

7/2015

Balwinder Singh

Petition under Regulations of Punjab State Electricity Regulatory Commission (Electricity Supply Code and Related Matters) Regulations, 2014 for release of regular DS connections in village-Sullar on lease hold land.

22.07.2015

17.

8/2015

Punjab State Power Corporation Limited

Petition for approval of proposal for carrying out 3rd party audit of T&D loss reduction schemes as per directions of PSERC in Order dated 28.07.2014 in Petition No.15 of 2014.

25.02.2015

18.

9/2015

Indian Sucrose Limited

Petition under clause 47, 48, 49 and 50 of the Punjab State Electricity Regulatory Commission (Electricity Supply Code and Related Matters) Regulations, 2007 and other relevant sections of the Electricity Act, 2003 read with clause 9 of the Punjab State Electricity Regulatory Commission (Conduct of Business) Regulations, 2005, seeking directions for refund alongwith interest of the amount illegally claimed from the Petitioner by the Respondent on account of cost of same 66 kV line and 66 kV bay for the 2nd time and then SCC charges on the 3rd occasion for load released to the Petitioner, though the Petitioner has already paid actual cost of the line and bay and the evacuation of power and load released is through the same line / feeder without any augmentation.

04.06.2015

19.

10/2015

M/s A2Z Infra Engineering Limited

Petition/Complaint under Section 142 of the Electricity Act, 2003 read with Regulations 60 and 61 of the Punjab State Electricity Regulatory Commission (Conduct of Business) Rules, 2005 for the Respondent’s willful, deliberate, contumacious, continuous and continuing non-compliance of this Commission’s Order dated 15.03.2012 in Petition No.62 of 2011.

08.09.2015

20.

11/2015

Punjab State Power Corporation Limited

Petition for approval of Fuel Cost Adjustment (FCA) Surcharge for 3rd Quarter (Oct. 2014 to Dec. 2014) of FY 2014-15.

13.05.2015

21.

12/2015

Asian Fine Cements Pvt. Ltd.

Petition under Section 10 of the Conduct of Business Regulations issued by PSERC for seeking compliance of the provision of Act, Regulations and other allied regulations regarding grant of Power Connection and recovery of expenditure.

11.03.2015

22.

13/2015

Punjab State Power Corporation Limited

Petition under Section 86 (1) (a) read with section 62 of the Electricity Act, 2003 regarding recovery due to payment of additional levy as per Hon’ble Supreme Court order dated 24.09.2014

01.09.2015

22. (a)

13/2015
(In compliance to Hon’ble APTEL Order dated 19.01.2018 in Appeal No. 259 of 2015)

Punjab State Power Corporation Limited

Petition under Section 86 (1) (a) read with Section 62 of the Electricity Act, 2003 regarding recovery due to payment of additional levy as per Hon’ble Supreme Court Order dated 24.09.2014.

31.07.2018

23.

14/2015

KRBL Limited

Petition in the matter of recovering the cost of line for releasing the connection of KRBL Limited Bhasaur (Dhuri) A/c no. LS-14, violation of the decision of empowered committee of Punjab Government for Mega Projects.

23.04.2015

24.

15/2015

Bhanuenergy Infrastructure and Power Limited

Petition for seeking Project specific Extension of Period of Commissioning in the PPA for applicability of the tariff of Rs.8.63/unit.

12.06.2015

25.

16/2015

Bhanuenergy Industrial Development Limited

Petition for seeking Project specific Extension of Period of Commissioning in the PPA for applicability of the tariff of Rs.8.52/unit.

12.06.2015

26.

17/2015

Atma Powers Private Limited

Petition for seeking Project specific Extension of Period of Commissioning in the PPA for applicability of the tariff of Rs.8.41/unit.

12.06.2015

27.

18/2015

Punjab Alkalies and Chemicals Ltd.

Petition under Regulation 6(2) and Regulation 7 of PSERC (Renewable Purchase Obligation and its compliance) Regulations, 2011 for permission to carry forward the renewable purchase obligation of the petitioner for the year 2014-15 to 2015-16.

15.05.2015

28.

19/2015

All India Steel Re-Rollers Association

Petition challenging the action of PSPCL regarding charging Peak Load Violation Penalty charges which has not been approved by the PSERC in the Tariff Order.

01.06.2015

29.

20/2015

Earth Solar Private Limited

Petition under Rule 10, 69, 71 and 73 of the PSERC (Conduct of Business) Regulations, 2005 and clause 85 of CERC (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2012 (adopted by the Commission in its Order dated 19.07.2012 in Suo-Motu Petition No. 35 of 2012) read with Section 94 of The Electricity Act, 2003, for seeking Project Specific extension of period of commissioning of the project by two months with applicable tariff of Rs. 8.70 per kWh.

22.06.2015

30.

21/2015

Punjab State Power Corporation Limited

Petition under Section 86 (1) (b) and 86 (1) (e) and other applicable provisions of the Electricity Act, 2003 for purchase of electricity from solar energy generators in the State of Punjab.

11.05.2015

31.

22/2015

Lumen Power Pvt. Limited

Petition under Section 94 of the Electricity Act, 2003 (the Act) read with Regulation 69 (Saving of inherent power of the Commission), 71 (Power to remove difficulties) 73 (Extension or abridgement of time allowed) of the PSERC (Conduct of Business) Regulations, 2005 and Regulations 85 (Power to Relax) of CERC (Terms and Conditions of Tariff determination from Renewable Energy Sources) Regulations, 2012 (as adopted by the Commission in its Order dated 19.07.2012 in Suo-Motu Petition No.35 of 2012), for rendering directions the Respondents to execute amended / supplementary PPA by assigning the same in name of the Petitioner Company; to extend the date of commissioning of Petitioner’s project from 15.03.2015 to 30.09.2015 by maintaining status quo in terms of the applicability of tariff granted to the project of the Petitioner i.e. 8.25/unit; directing the Respondents to amend the relevant clauses of the IA/PPA; and for other relief as prayed for.

30.04.2015

32.

23/2015

Punjab State Power Corporation Limited

Petition under Section 86 (1) (b) and 86 (1) (e) and other applicable provisions of the Electricity Act, 2003 for purchase of electricity from Grid connected Rooftop solar energy generators in the State of Punjab.

11.05.2015

33.

24/2015

Shiva Alloys, Bilga Road and another

Petition under Section 142 of Electricity Act, 2003 read with clause 5 & 6 of the PSERC (Electricity Supply Code and Related Matters), Regulations, 2007 and other relevant sections of the Electricity Act, 2003 and regulations framed by this Commission, for taking necessary action against the respondent and its officials for not giving feasibility clearance and issuing demand notice within the prescribed period of time as per provisions of the Supply Code, 2007 and further for directing the respondent to refund the amount deposited by the petitioners as earnest money and with A & A form for getting the electricity connection.

01.07.2015

34.

25/2015

Punjab State Power Corporation Limited

Petition - Regulation 22 of the Punjab State Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff), Regulations, 2005 as amended by Punjab State Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff), second amendment Regulations, 2012 notified vide Notification dated 17th September, 2012 - Approval of Capital Expenditure for the Distribution Schemes to be executed by PSPCL for T & D Loss Reduction and System Improvement.

26.05.2015

35.

26/2015

Punjab State Power Corporation Limited

Petition under Section 86 (1) (b) of Electricity Act, 2003 for Power Procurement Plan on Short Term basis for the year 2015-16 read with the Public Notice issued by the Hon’ble Punjab State Electricity Regulatory Commission dated 23.10.2012

29.06.2015

36.

27/2015

Nabha Power Limited

Petition under Section 86(1)(b) and 86(1)(f) of The Electricity Act, 2003 seeking recourse to meet the adverse impact on the Net Quoted Heat Rate (NQHR)/Station Heat Rate (SHR) for the 2x700 MW Rajpura Thermal Power Project (project) owned and operated by the petitioner caused due to consistent part load offtake by PSPCL (i.e. operation of plant at lower/varying load factor).

07.10.2015

37.

28/2015

Shri Gurnek Singh Brar and Shri Padamjit Singh

Petition under section 61, 86(1), 57 of Electricity Act 2003 regarding reorganization of distribution organization on functional basis.

04.01.2016

38.

29/2015

Mokia Green Energy Private Limited

Petition for seeking project specific extension of Period of Commissioning in the PPA for applicability of tariff of Rs. 8.59 per kWh.

26.06.2015

39.

30/2015

KRBL Limited

Petition in the matter of release of connection of KRBL Limited Bhasaur (Dhuri) A/c no. LS-14, inclusion of undue charges in the cost of line - violation of Reg. 9.1.1 (b) of Supply Code and Tariff provisions.

29.06.2015

40.

31/2015

Punjab State Power Corporation Limited

Petition No. 31 of 2015 (Suo Motu) for compliance of APTEL Judgment dated 22.04.2015 in Appeal No. 174 of 2013 filed by PSPCL against Commission Order dated 28.03.2013 passed in Review Petition No. 10 of 2013 for reviewing the Order dated 07.01.2013 of the Commission passed in Petition No. 57 of 2012 (Suo-Motu) initiated for implementation of judgment dated 18.10.2012 of Hon’ble APTEL in Appeal No. 7, 46, and 122 of 2011 filed by PSPCL.

22.07.2015

41.

32/2015

Asian Fine Cements Pvt. Ltd.

Petition under Section 142 and 146 of the Electricity Act, 2003 for seeking compliance of the Order dated 11.03.2015 passed by the PSERC.

05.08.2015

42.

33/2015

GVK Power (Goindwal Sahib) Limited

Petition under Section 86 (1) (a), (b) and (f) and other applicable provisions of the Electricity Act, 2003 for adjudication of the disputes and for directions - Power Purchase Agreement for purchase of power from 2 x 250 MW (+20%) Goindwal Sahib Thermal Power Plant at Goindwal Sahib, Punjab.
AND
Petition under Section 86 of the Electricity Act, 2003 and Articles 12, 13 and 17 of the Amended and Restated Power Purchase Agreement dated 26.05.2009 executed between GVK Power (Goindwal Sahib) Limited and Punjab State Power Corporation Limited (formerly known as Punjab State Electricity Board) for declaration of the occurrence of Change in Law and Force Majeure events.

01.02.2016

43.

Application dated 08.06.2015 in IA No.4 in Petition No.34 of 2015

Talwandi Sabo Power Limited

Petition under Section 86 (1) (f) of the Electricity Act 2003 read with Article 11, Article 12 and Schedule 7 and other applicable provisions of the Power Purchase Agreement dated 1 September 2008 executed between Talwandi Sabo Power Limited (TSPL) and Punjab State Power Corporation Limited (PSPCL), for recovery of short payments of bills raised/ to be raised by TSPL and injunction against Punjab State Power Corporation Limited (PSPCL) for levying of penalty and/or refund of penalty deducted/to be deducted by PSPCL on account of availability of the power plant below 75% in FY 2014-15.

12.06.2015

44.

34/2015

Talwandi Sabo Power Limited

Petition under Section 86 (1) (f) of the Electricity Act 2003 read with Article 11, Article 12 and Schedule 7 and other applicable provisions of the Power Purchase Agreement dated 1 September 2008 executed between Talwandi Sabo Power Limited (TSPL) and Punjab State Power Corporation Limited (PSPCL), for recovery of short payments of bills raised/ to be raised by TSPL and injunction against Punjab State Power Corporation Limited (PSPCL) for levying of penalty and/or refund of penalty deducted/to be deducted by PSPCL on account of availability of the power plant below 75% in FY 2014-15.

17.12.2015

45.

35/2015

Punjab State Power Corporation Limited

Petition for approval of Fuel Cost Adjustment (FCA) Surcharge for 4th Quarter (January, 2015 to March, 2015) of FY 2014-15.

09.06.2015

46.

36/2015

Leader Engineering Works Pvt. Ltd. and Others

Petition under Section 142 of the Electricity Act, 2003 read with Regulation 9 of the PSERC (Conduct of Business) Regulations, 2005, for taking necessary action against the respondents who have issued impugned demands from the petitioners in violation of the Electricity Act, 2003, Supply Code, Conditions of Supply, Commercial Circular 4/96, 28/96, Sales Manual Instructions and order passed by this Commission in various cases and further for consequential relief of setting aside the impugned demands raised by the respondents.

17.06.2015

47.

37/2015

Punjab State Power Corporation Limited

Petition for approval of change of Regulation for Fuel Cost Adjustment (FCA) Surcharge Formula.

22.01.2016

48.

38/2015

Punjab State Power Corporation Limited

Petition under clause 94 (1) (f) of The Electricity Act 2003 and clause 6 (2) of the Punjab State Electricity Regulatory Commission (Renewable Purchase Obligation & its compliance) Regulations, 2011 issued vide Notification No.PSERC/Secy/Reg./55 dated 03.06.2011 for carrying forward targets of Renewable Purchase Obligation (RPO) for FY 2014-15 specified in clause 3 (1).

28.07.2015

49.

39/2015

Ladhar Paper Mills

Petition under Section 142 of Electricity Act 2003 in the matter of non compliance of Order of PSERC in Petition No.70 of 2014 relating to refund of excess amount of security (works) to Ladhar Paper Mills, Account No.X58-LS42-00002

15.07.2015

50.

40/2015

Punjab State Power Corporation Limited

Petition for incorporating a new clause under Regulation 49 of ‘Conditions of Supply’ for charging Rs.3 per KVAH on the power consumed through ‘Open Access” during peak load hours.

26.08.2015

51.

41/2015

Supreme Infrastructure India Limited

Petition under Section 94 of the Electricity Act, 2003 (the Act) read with Regulation 69 (Saving of inherent power of the Commission), 71 (Power to remove difficulties) and 73 (Extension or abridgement of time allowed) of the PSERC (Conduct of Business) Regulations, 2005 and Regulations 85 (Power to Relax) of CERC (Terms and Conditions of Tariff determination from Renewable Energy Sources) Regulations, 2012 (as adopted by the Commission in its order dated 19.07.2012 in suo-motu Petition No.35 of 2012); to extend the date of commissioning of Petitioner’s project from 15.03.2015 to 31.03.2016 by maintaining status quo in terms of the applicability of tariff granted to the project of the petitioner i.e. 8.25/unit; and for other relief as prayed for.

19.08.2015

52.

42/2015

Amir Chand Jagdish Kumar (Exports) Ltd.

Petition in the matter of recovery of MMC for delay in submission of test report by Amir Chand Jagdish Kumar (Exports) Ltd Amritsar Account No.LS-01-0012 – violation of Supply Code Reg. 19 and Conditions of Supply 11.

15.07.2015

53.

43/2015

Suo-Motu

Determination of generic levellised generation tariff for Renewable Energy Power Projects for FY 2015-16.

24.07.2015

54.

44/2015

Indian Sucrose Limited

Petition under Regulations 49 and 50 of the Punjab State Electricity Regulatory Commission (Electricity Supply Code and Related Matters) Regulations, 2007 and Section 86(1)(e) and 86 (1)(k) and 46 and other relevant sections of the Electricity Act, 2003 read with Regulation 9 of the Punjab State Electricity Regulatory Commission (Conduct of Business) Regulations, 2005, seeking directions for refund along with interest of the amount(s) illegally claimed from the petitioner by the respondent on multifarious counts and for other relief as prayed for.

02.12.2015

55.

45/2015

Divisional Railway Manager (Elect./TRD)

Petition under clause no. 5 & 6 of the Regulations on Electricity Supply Code for extension of compliance period for registration of A&A forms of Railway Traction sub Stations at Maiser Khana.

02.09.2015

56.

46/2015

Punjab State Power Corporation Limited

Petition under Section 86 (1) (f) of the Electricity Act, 2003 for adjudication of disputes under the Power Purchase Agreement dated 11.12.2010 read with the Memorandum of Understanding dated 07.10.2010 between the Petitioner-Punjab State Power Corporation Limited and the Respondent-NTPC Limited

30.09.2019

57.

47/2015

Open Access Users Association

Petition under Regulation 45 of Punjab State Electricity Regulatory Commission (Terms and Conditions for intra-State Open Access) Regulation, 2011 and Para 15 of Procedure for intra-State Short Term Open Access of SLDC/PSTCL for directing the Transmission Licensee/SLDC to exempt penalty on the power drawn above the admissible drawl and up to contract demand for curtailment of bilateral schedules under Force Majeure condition and removal of other difficulties in Open Access arising in consequence to Amendment No. 5 of PSERC Open Access Regulations, 2011 and PSPCL’s Commercial Circular No. 29 of 2015.

03.02.2016

58.

48/2015

Trishala Alloys Pvt. Ltd

Petition under section 142 of Electricity Act, 2003 for taking necessary action against the respondent and its officials for issuing commercial circular No. 29/2015 dated 22.07.2015 contrary to the amendment dated 01.06.2015 carried out by this Hon’ble Commission in Punjab State Electricity Regulatory Commission (Terms and Conditions for intra-State Open Access) (5th Amendment) Regulations, 2015 and in violation of the provisions of Electricity Act, 2003, provisions of Punjab State Electricity Regulatory Commission (Terms and Conditions for intra-State Open Access) Regulations, 2011 and General Conditions of Tariff and Schedule of Tariff.

01.02.2016

59.

IA No. 9 of 2015 in Petition No.50 of 2015

Nahar Industrial Enterprises Limited

Application for restraining the Respondent – PSPCL not to levy TOD charges of Rs.3/- per unit, any further, upon the Petitioner for the power drawn through Open Access mode during peak period through the grid of the Respondents and for the grant of other reliefs, as prayed for.
and
Petition under Regulation 45 of Punjab State Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) Regulations, 2005 and Para 23 of the General Conditions of Tariff and Regulation 45 of Punjab State Electricity Regulatory Commission (Terms and Conditions for Intra-state Open Access) Regulations 2011 and other relevant rules, regulations and procedures approved by the Commission for rendering clarification to PSPCL on applicability of TOD Tariff on power wheeled by Captive Cogen NRSE Plants for own use by the Petitioner under open access and adjustment of power banked under open access due to failure of transmission and/or distribution system of the Licensees and scheduling requirement of NRSE Generators as per NRSE Policy of GOP and RE Regulations etc.

08.12.2015

60.

50/2015

Nahar Industrial Enterprises Limited

Petition under Regulation 45 of PSERC (Terms and Conditions for Determination of Tariff) Regulations 2005 and Para 23 of the General Conditions of Tariff and Regulation 45 of PSERC (Terms and Conditions for Intra-state Open Access) Regulations 2011 and other relevant rules, regulations and procedures approved by the Commission for rendering clarification to PSPCL on applicability of ToD Tariff on power wheeled by Captive Co-gen NRSE Plants for own use by the Petitioner under open access and adjustment of power banked under open access due to failure of transmission and/or distribution system of the Licensees and scheduling requirement of NRSE Generators as per NRSE Policy of GoP and RE Regulations etc.

12.01.2016

61.

51/2015

Gill Acqua Hydro Power Generation Company Pvt. Ltd.

Petition under sections 62 and 86 (1)(e) of The Electricity Act, 2003 seeking revision of the tariff of the Madhopur Beas Link-III (MBL-III) small hydel project of the petitioner herein located at Madhopur Beas Link in terms of the Tariff Orders passed by this Commission applicable to mini hydel projects in the State of Punjab (Capacity of Plant 3.8 MW).

22.01.2016

62.

52/2015

Gill Acqua Hydro Power Generation Company Pvt. Ltd.

Petition under sections 62 and 86 (1)(e) of The Electricity Act, 2003 seeking revision of the tariff of the Madhopur Beas Link-II (MBL-II) small hydel project of the petitioner herein located at Madhopur Beas Link Canal in terms of the Tariff Orders passed by this Commission applicable to mini hydel projects in the State of Punjab (Capacity of Plant 6.0 MW).

22.01.2016

63.

53/2015

Punjab State Power Corporation Limited

Petition under Regulation 22 of Punjab State Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) Regulations, 2005 as amended by Punjab State Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff), second amended Regulations, 2012 notified vide Notification dated 17th September, 2012 AND Approval of Capital Expenditure for the Distribution Schemes to be executed by PSPCL for Reduction of AT&C losses in 12 No. towns below 15% under R-APDRP (Part-B) Scheme of MOP/GOI.

10.09.2015

64.

54/2015

Punjab State Power Corporation Limited

Petition for seeking the approval of PSERC in power being scheduled from PTC Mallana-II under back to back PSA under Section 86 (1) (b) of the Electricity Act, 2003.

18.12.2015

65.

55/2015

Everest Power Private Limited

Petition for approval of annual fixed cost of 100 MW Malana II Hydro-Electric Project for FY 2015-16; and truing up of annual fixed cost for FY 2014-15 under Section 62 of the Electricity Act, 2003 read with Regulation 56 (2) and (3) of Punjab State Electricity Regulatory Commission (Conduct of Business) Regulations, 2005.

20.12.2016

66.

56/2015

Punjab Energy Development Agency (PEDA)

Petition under section 86 (1) (a), (c) and (e) of Electricity Act, 2003 and Regulation 46 of PSERC (Terms and Conditions of Intra-state Open Access) Regulations 2011, as amended upto date, for further amending Regulation 25 of the Open Access Regulations, 2011 in accordance with addition/amendment made by Govt. of Punjab in the NRSE Policy, 2012 (i.e. allowing intra-state transmission & wheeling of NRSE power without levy of transmission and wheeling charges, which is currently levied @ 2% as per Open Access Regulations of PSERC) for promotion of NRSE Projects.

15.01.2016

67.

57/2015

Biomass Power Producers Association

Petition under Section 86 of The Electricity Act, 2003 for allowing same Variable Cost to all Biomass based Power Projects operating in Punjab at rates declared annually by PSERC as a component of generic tariff for Biomass Power Projects Commissioned during the year.

29.01.2016

68.

58/2015

G.D. International Pvt. Ltd.

Petition under Section 142 of the Electricity Act, 2003 read with Regulation 9 of the PSERC (Conduct of Business) Regulations, 2005, for taking necessary action against the respondents who have issued impugned demands from the petitioner in violation of the Electricity Act, 2003, Supply Code, Conditions of Supply, Commercial Circular 28/96, Sales Manual Instructions and Order passed by the Commission in various cases and further for consequential relief of setting aside the impugned demand raised by the respondents.

20.01.2016

69.

59/2015

Indus Towers Private Ltd.

Petition under clause 9 of the Punjab State Electricity Regulatory Commission (Conduct of Business) Regulations, 2005 to the extent for inclusion of LT level consumer categories in the Time of Day Tariff schedule in the State of Punjab

12.01.2016

70.

60/2015

Indian Wind Power Association

Petition under Section 86(1)(e) of the Electricity Act, 2003 read with Regulation 3, 4 & 6 of the Punjab State Electricity Regulatory Commission (Renewable Purchase Obligation and its compliance) Regulations, 2011 seeking directions for compliance of the Renewable Purchase Obligation imposed upon the obligated entities in the State of Punjab.

22.05.2017

71.

61/2015

M/s Madhav Alloys Pvt. Ltd.

Petition under Section 142 of Electricity Act, 2003, for taking necessary action against the respondents for violating the Tariff Order passed by this Hon’ble Commission in the ARR petition No. 63 of 2013 filed by the PSPCL for the year 2014-2015, by not giving the rebate in the tariff on the consumption of the electricity, as envisaged by this Hon’ble Commission in para 7.6 of the above said tariff order, and by this way charging the price exceeding the tariff fixed by this Hon’ble Commission and for violating the provisions of section 45 of the Electricity Act, 2003, with further prayer to direct the respondents to bill the consumption of electricity consumed by the petitioner over the thresh hold limit on reduced rates after giving the rebate on the tariff as per para 7.6 of the Tariff Order for the financial year 2014-2015 and refund the excess amount charged along with interest as mentioned in section 62 (6) of the Electricity Act, 2003

18.12.2015

72.

62/2015

Punjab State Transmission Corporation Limited

Petition under Regulation 22 of the Punjab State Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) Regulations, 2005 as amended by Punjab State Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) (Second amendment) Regulations, 2012, notified vide Notification dated 17th September, 2012 AND Approval of Capital Expenditure for the Transmission Schemes to be executed by PSTCL for system improvement and power disposal – 220 kV Gurdaspur & 220 kV Sri Hargobindpur Sub-stations for Rs. 90.831 Crore.

27.01.2016

73.

63/2015

Nahar Spinning Mills Limited

Petition under Section 142, 146 and 149 read with other relevant provisions of the Electricity Act 2003 and Chapter XI of PSERC (Conduct of Business) Regulations 2005 as amended up to date and other relevant rules and regulations as approved by the Commission for non-compliance of Order dated 20.05.2015 issued by this Commission in Petition No.3 of 2015 directing PSPCL not to charge Rs.3/- per unit and Refund Peak charge of Rs.3/- under TOD Tariff allegedly recovered by Respondent-PSPCL on power brought in by the petitioner during Peak Load Period under open access

18.12.2015

74.

64/2015

Punjab State Power Corporation Limited

Petition under Section 62 of the Electricity Act 2003 for approval of the Commission for offering a Special Two Part Tariff for the New LS Industry which would be established as the result of Invest Punjab Industrial Summit 2015 and 2013

13.11.2015

75.

65/2015

Madhav Alloys Pvt. Ltd.

Petition under clause 44 of Punjab State Electricity Regulatory Commission (Electricity Supply code and Related Matters) Regulations, 2014 (hereinafter to be called Supply Code, 2014) read with clause 47 of Punjab State Electricity Regulatory Commission (Electricity Supply Code and Related Matters), Regulations, 2007 (hereinafter to be called Supply Code, 2007) for interpretation of clause 14 and 17 of Supply Code, 2007 and section 47 of the Electricity Act, 2003 to the effect that a consumer is entitled to get interest on the initial security even for the period the connection was not released; with further prayer to take appropriate action under Sections 142 and 146 of the Electricity Act, 2003, against the respondent and its officials for issuing the impugned demand letter dated 04.11.2015, asking the petitioner to deposit the interest amount already given to the petitioner on the initial security, being in violation of the clause 14 and 17 of Supply Code, 2007 and section 47 of the Electricity Act, 2003 and Order of this Commission in Petition No. 45 of 2014, titled as GNA Udyog Limited Versus PSPCL; any other Order or direction which this Commission may deem fit and proper may also be passed in favour of the petitioner.

13.01.2016

76.

66/2015

Asian Fine Cements Pvt. Ltd.

Petition under Rule 10, 69, 71 and 73 of PSERC (Conduct of Business) Regulations, 2005 and clause 44, 45, 46 and 47 of Punjab State Electricity Regulatory Commission (Electricity Supply Code and Related Matters) Regulations, 2014, with prayer to issue necessary direction to the respondent to accept A&A form for electricity load applied by the petitioner and further condone the delay, if any, occurred in submitting A&A form with PSPCL and accordingly extend the time required as per clause 6.3.3 of Punjab State Electricity Regulatory Commission (Electricity Supply code and Related Matters) Regulations, 2014, with further prayer to set aside the letter dated 03.09.2015 directing the petitioner to submit A&A form upto 16.09.2015 and letter dated 20.10.2015 whereby the feasibility clearance granted to the petitioner has been cancelled, being contrary to clause 6.3.3 of the Supply Code, 2014 and Order dated 05.08.2015 passed by this Commission in petition No.32 of 2015.

27.01.2016

77.

67/2015

S.S.Steel Industry

Petition in the matter of payment of interest on security and refund of excess amount of security (works) – violations of section 47.4 of Electricity Act, 2003 and Reg. 19.3 (b) and Reg.19.7 of Supply Code, 2007.

20.01.2016

78.

68/2015

Garg Acrylics Ltd. and others

Petition under Section 142, 146 and 149 of the Electricity Act 2003 read with Chapter XI of PSERC (Conduct of Business) Regulations 2005 (as amended up to date) and other relevant rules and regulations as framed by this Commission, for taking necessary action against the respondents and other guilty officials of the respondent No.1, for violating the Orders dated 20.05.2015 passed by this Commission in Petition No. 3 of 2015, by issuing bills for the month of October, 2015 and thereafter and charging additional charge of Rs.3/kVAh on power purchased through open access by the petitioners during peak load hours from 06.00 PM to 10.00 PM, though in the above said order in petition No. 3 of 2015 this Commission has held that PSPCL can not charge any additional charge / surcharge of Rs.3/kVAh on power purchased through open access by the consumers during peak load hours from 06.00 PM to 10.00 PM.

23.12.2015

79.

69/2015

T.C Spinners Pvt. Ltd.

Petition in the matter of refund of excess amount of cost of 66 kV Bay- violation of regulation 19.7 of Supply Code, 2007 and additional demand of Rs. 42,01,274/- towards cost of 66 kV line – violation of regulations 19.7 & 19.8 of Supply Code, 2007.

22.01.2016

80.

70/2015

Punjab State Power Corporation Limited

Petition for approval of Punjab State Electricity Regulatory Commission for offering a Special Tariff for New Industry which would be established as the result of Progressive Punjab Investors Summit.

26.07.2016

80.(a)

70/2015 (Amendment)

Punjab State Power Corporation Limited

Petition for approval of Punjab State Electricity Regulatory Commission for offering a Special Tariff for New Industry which would be established as the result of Progressive Punjab Investors Summit.

06.09.2016

81.

71/2015

PTC India Limited

Petition for fixing Trading Margin of PTC India Limited under Section 62 of the Electricity Act, 2003 for the period 01.04.2014 – 31.03.2015 with respect to sale of 100 MW power from Malana II Hydro Electric Project to Punjab State Power Corporation Limited through PTC (India) Limited in terms of (a) Power Purchase Agreement between PTC India Limited and Everest Power Private Limited dated 25.07.2005; (b) Power Sale Agreement between PTC India Limited and PSPCL dated 23.03.2006; (c) Tripartite Agreement between Everest Power Private Limited, PSPCL and PTC India Limited dated 03.01.2013; and (d) Orders dated 27.11.2013 passed in Petition No. 54 of 2012 and 31.08.2015 in Petition No. 37 of 2014 passed by this Hon’ble Commission

11.02.2019

82.

72/2015

Shiva Fibres Pvt. Ltd. and others

Petition under Section 142, 146 and 149 of the Electricity Act 2003 read with Chapter XI of PSERC (Conduct of Business) Regulations 2005 (as amended up to date) and other relevant rules and regulations as framed by this Commission, for taking necessary action against the respondents and other guilty officials of the respondent No.1, for violating the Orders dated 20.05.2015 passed by this Commission in Petition No. 3 of 2015, by issuing bills for the month of October, 2015 and thereafter and charging additional charge of Rs.3/kVAh on power purchased through open access by the petitioners during peak load hours from 06.00 PM to 10.00 PM, though in the above said order in petition No. 3 of 2015 this Commission has held that PSPCL can not charge any additional charge / surcharge of Rs.3/kVAh on power purchased through open access by the consumers during peak load hours from 06.00 PM to 10.00 PM.

18.12.2015

83.

73/2015

Shiva Texfabs Limited and others

Petition under Section 142, 146 and 149 read with other relevant provisions of the Electricity Act 2003 and Chapter XI of PSERC (Conduct of Business) Regulations 2005 as amended up to date and other relevant rules and regulations as approved by this Commission for non compliance of Orders dated 20.05.2015 issued by this Commission in Petition No. 3 of 2015 directing PSPCL to refund peak charge of `3/- under ToD Tariff illegally recovered by respondent-PSPCL on power brought in by the petitioner during evening peak hours under open access and further directing PSPCL not to charge this ToD of `3/- per unit in the ensuing bills to be issued to the petitioner(s).

04.04.2016

84.

74/2015

Everest Power Private Limited

Petition for approval of Annual Fixed Cost of 100 MW Malana II Hydro-Electric Project for FY 2016-17; under Section 62 of the Electricity Act, 2003 read with Regulation 56 (2) and (3) of Punjab State Electricity Regulatory Commission (Conduct of Business) Regulations, 2005.

08.08.2017

85.

I.A.No.23 of 2016 & I.A. No.01 of 2017, In Petition No.74 of 2015

Everest Power Private Limited

Interlocutory Applications in Petition No.74 of 2015 regarding provisional Annual Fixed Cost for FY 2016-17.

31.03.2017

86.

75/2015

Arora Iron & Steel Rolling Mills (P) Ltd.

Petition under clause 44 of Punjab State Electricity Regulatory Commission (Electricity Supply Code and Related Matters) Regulations, 2014 (hereinafter to be called Supply Code, 2014) read with clause 47 of Punjab State Electricity Regulatory Commission (Electricity Supply Code and Related Matters), Regulations, 2007, (hereinafter to be called Supply Code, 2007) for interpretation of clause 14 and 17 of Supply Code, 2007 and Section 47 of the Electricity Act, 2003 to the effect that a consumer is entitled to get interest on the initial security even for the period the load/connection was not released; with further prayer to take appropriate action under Sections 142 and 146 of the Electricity Act, 2003, against the respondent and its officials for not giving the interest on additional security deposited by the petitioner, as per provisions of Section 47 of the Electricity Act, 2003, clause 14 and 17 of Supply Code, 2007 and Order of the Commission in petition no. 45 of 2014 titled as GNA Udyog Limited V/s PSPCL; any other Order or direction which this Court may deem fit and proper may also be passed in favour of the petitioner.

18.01.2016

87.

76/2015

Garg Acrylics Ltd. and Others

Petition under Section 142, 146 and 149 of the Electricity Act, 2003 read with Chapter XI of PSERC (Conduct of Business) Regulations, 2005 (as amended up to date) and other relevant rules and regulations as framed by this Commission, for taking necessary action against the respondent and other guilty officials of the respondents, for issuing memo no. 4983/87/DB-36 dated 08.12.2015 and memo no. 5006/13/DB-36 dated 17.12.2015 for levying PLEC (Peak Load Exemption Charges) as per PR Circular No. 5 of 2013 from the consumers who have opted for ToD Tariff and brought Open Access Power during 06.00 PM to 10.00 PM, for the period October-2014 to March-2015 and October-2015 onward, in violation of Tariff Orders passed by this Commission for FY 2014-15 and FY 2015-16 and Order dated 20.05.2015 passed by this Commission in Petition No. 3 of 2015 and provisions of Punjab State Electricity Regulatory Commission (Terms and Conditions for Intra-state Open Access) Regulations, 2011.

03.02.2016

88.

77/2015

Nahar Spinning Mills Limited

Petition under Section 142,146 and 149 read with other relevant provisions of the Electricity Act, 2003 and Chapter XI of PSERC (Conduct of Business) Regulations, 2005 as amended up to date and other relevant rules and regulations as approved by the Commission for non-compliance of Order dated 20.05.2015 issued by the Commission in Petition No. 3 of 2015 directing PSPCL not to charge Rs.3/- per unit and refund peak charge of Rs.3/- per unit under ToD tariff illegally recovered by Respondent PSPCL on power brought in by the Petitioner during 06:00 PM to 10:00 PM under Open Access and further directing PSPCL not to charge ToD of Rs.3/- per unit in the ensuing bills to be issued to the Petitioner (s); And for quashing the order bearing no. 4983/87/DB-36 dated 08.12.2015, illegally issued by the Respondent PSPCL, as a device for not complying with the ibid order dated 20.05.2015, by imposing PLEC on the open access power drawn by the Petitioner and similarly placed consumers during the ToD regime; And for other reliefs as prayed for.

03.02.2016

89.

78/2015

Punjab State Transmission Corporation Limited

Petition for Aggregate Revenue Requirement and Determination of Tariff for FY 2016-17 filed by Punjab State Transmission Corporation Limited.

28.03.2016

90.

Review Petition No.04 of 2016 in Petition No. 78 of 2015

Punjab State Transmission Corporation Limited

Petition under Section 94 (1) (f) of the Electricity Act, 2003 read with Order 47 Rule 1 of the Code of Civil Procedure, 1908 and read with Regulation 64 of the Punjab State Electricity Regulatory Commission (Conduct of Business) Regulations, 2005 for review of the Order dated 27.07.2016 passed in Petition No. 78 of 2015.

07.04.2017

91.

79/2015

Punjab State Power Corporation Limited

Petition for Aggregate Revenue Requirement and Determination of Tariff for FY 2016-17 filed by Punjab State Power Corporation Limited.

28.03.2016

92.

80/2015

Amtek Railcar Industries Pvt. Limited

Petition under clause 44 of Punjab State Electricity Regulatory Commission (Electricity Supply Code and Related Matters) Regulations, 2014 (hereinafter to be called Supply Code, 2014) read with clause 47 of Punjab State Electricity Regulatory Commission (Electricity Supply Code and Related Matters), Regulations, 2007, (hereinafter to be called Supply Code, 2007) for interpretation of clause 14 and 17 of Supply Code, 2007 and Section 47 of the Electricity Act, 2003 to the effect that a consumer is entitled to get interest on the initial security even for the period the connection was not released; with further prayer to take appropriate action under Section 142 and 146 of the Electricity Act, 2003, against the respondent and its officials for issuing the impugned demand letter dated 14.12.2015, asking the petitioner to deposit the interest amount already given to the petitioner on the initial security, and further for not giving the interest on initial security for whole period, being in violation of the clause 14 and 17 of Supply Code, 2007 and Section 47 of the Electricity Act, 2003 and Order of the Commission in petition No.45 of 2014, titled as GNA Udyog Limited V/s PSPCL.

03.02.2016