List of  Commission orders/ judgments passed in various cases.

 

 

 

 

S.No.

Petition No.

Filed by

Subject matter

Date of final decision.

1.

1/2013

Punjab State Transmission Corporation Limited

Seeking necessary provisions / amendments in the PSERC (Terms & Conditions for Intra-state Open Access) Regulations, 2011 to check / avoid Unauthorised purchase of Power and seeking directions in respect of unethical action by M/s A.R. Castings Pvt. Ltd. by purchasing unauthorized Open Access power through a forged NOC.

27.08.2013

2.

2/2013

KAY ELL DEE METALIKS (P) LTD

Petition under section 142 of Electricity Act, 2003 read with clause 5 & 6 of the PSERC (Electricity Supply Code and Related Matters) Regulations, 2007 and other relevant sections of Electricity Act, 2003 and regulations framed by this Commission, for taking necessary action against respondent No.1 and its officials for not giving feasibility clearance and issuing demand notice within the prescribed period of time as per provisions of Supply Code, 2007 and further for directing the respondent to refund 10% of the earnest money deducted by the respondent from the earnest money deposited by the petitioner.

01.04.2013

3.

3/2013

Sunny Estate

Petition in the matter of release of Electricity connections in Residential Colonies, Shopping Malls and Building Complexes etc. – Violation of clause 8 of conditions of supply and Reg. 9.1.1 (i) (b) and 6.3 (b) Electricity Supply Code 2007 AND against instructions dated 24.12.2012 given by Chief Engineer (Commercial), Punjab State Power Corporation Limited, Patiala, while issuing instructions in the matter of release of electricity connection to the residential colony “Sunny Estate” comprising of 70 residential units and 9 plots for shops wherein conditions has been imposed to recover the total cost of separate feeder from nearest sub-station from the petitioner / promoter with a request for striking down the condition, with a prayer for seeking directions to respondents to release the electric supply connection to the petitioner from nearest 11 KV Samrala Road Feeder, Khanna, under SD City-1, Khanna, Division Khanna.

22.02.2013

4.

4/2013

Shri Gursharan Singh S/o Shri Jagjit Singh

Petition under clause 23 (Interpretation of Tariff) of General Conditions of Tariff issued by the PSERC and for restraining the respondents from recovering any amount earlier, allowed to the petitioner on account of 7.5% H.T. Rebate for the period from August 2006 to December 2009, and for directing the respondents to refund the amount already recovered from the petitioner on account of HT Rebate and further for issuance of a direction to the respondents to pay 7.5% H.T. rebate upto 31..3.2010 as per Tariff Order for the year 2009-2010 and for grant of any other relief, order or direction which this Commission may deem fit and proper in the facts and circumstances of the case.

02.01.2014

5.

5/2013

Enterprise Business Solutions Pvt. Ltd.

Petition under Section 86 of the Electricity Act, 2003, for signing of PPA for sale of power to PSPCL from 5 MW Solar Photovoltaic based Power Plant at Sahadra-Sahiba Balachaur in Punjab in order to promote cogeneration and generation of electricity from renewable sources of energy as envisaged under the NRSE Policy-2006.

07.02.2013

6.

6/2013

International Tractors Limited

Petition under Clause 5 & 6 of the Regulations on Electricity Supply Code for extension of compliance period for registration of A&A Forms beyond 60 days of International Tractors Limited, Village Chak Gujran, Jalandhar Road, Hoshiarpur.

06.03.2013

7.

7/2013

SEL Manufacturing Company Limited

Petition under Clause 5.1, Clause 5.5 and Clause 6.3 (b) of Regulation 5 of Electricity Supply Code praying for the issuance of direction to the respondents to erect the 132 KV voltage line at the earliest as the same has already been sanctioned by the respondents and in pursuance thereto the requisite amount has already been deposited by the present petitioner with the respondent.

09.05.2013

8.

8/2013

Neel Kanth Concast Steels Pvt. Ltd.

Petition under Regulation 5.2, 5.5, 5.6 and 6, 9.1.2 (i) (c) concerning EHT consumer of the Electricity Supply Code and Related Matters Regulations & Conditions of Supply read with Section 43, 142 of the Electricity Act 2003.

28.03.2013

9.

9/2013

Punjab State Power Corporation Limited, Patiala

Petition under Section 23 of the Electricity Act, 2003 for authorizing the PSPCL to impose Power Cuts, Peak Load Hours restrictions and taking other Regulatory Measures for the year 2013-14.

01.04.2013

10.

10/2013

Punjab State Power Corporation Limited

Regarding filing of review petition against PSERC Orders dated 07.01.2013 passed in Petition No.57 of 2012 (Suo-motu) in compliance with Hon’ble APTEL Judgement dated 18.10.2012 of Appeal No.7, 46 & 122 of 2011.

28.03.2013

11.

11/2013

Krishna Techno Cast

Petition under Regulation 6.2 (b) of the Punjab State Electricity Supply Code & Related Matters Regulations 2007 – Service Connection Charges.

25.04.2013

12.

12/2013

Aman Alloys Pvt. Ltd.

Petition under clause 5(2), 22, 24 and 25 of Punjab State Electricity Regulatory Commission (Forum and Ombudsman) Regulations, 2005 and other relevant sections of the Electricity Act, 2003 and regulations framed by this Commission and further for setting aside the order dated 10.12.2012 passed by Consumer Grievances Redressal Forum, PSPCL and order dated 1.3.2012 passed by Zonal Dispute Settlement Committee (Central Zone), being in violation of Complaint Handling Procedure as approved by this Commission under clause 5(2) of Punjab State Electricity Regulatory Commission (Forum and Ombudsman) Regulations, 2005 and provisions of Electricity Act, 2003 and orders passed by this Commission.

06.03.2013

13.

13/2013

Khurana Steels Limited

Petition in the matter of Extension of Load – violation of Reg. 5.6 and 6.3 of Electricity Supply Regulations 2007.

30.04.2013

14.

14/2013
31/2013

PSPCL
PSPCL

Petition for Fuel Cost Adjustment (FCA) Surcharge for 3rd Quarter (Oct. 2012 to Dec. 2012) of FY 2012-13.
AND
Petition for Fuel Cost Adjustment (FCA) Surcharge for 4th Quarter (Jan. 2013 to Mar. 2013) of FY 2012-13.

27.06.2013

15.

15/2013

PTC India Limited

Petition under Section 86 (1) (f) of the Electricity Act, 2003 read with Regulation 9 of the Punjab State Electricity Regulatory Commission (Conduct of Business) Regulations, 2005 seeking a compensation of `124,51,53,525/- alongwith interest @ 15% p.a. from 19.08.2011 till the date of payment, from Punjab State Power Corporation Limited (PSPCL) for the abrupt discontinuance of drawl of power from the Baglihar Hydro Electric Power Project through the petitioner and short payment released by PSPCL amounting to ` 3,88,16,750/- plus late payment surcharge alongwith a payment of `49,45,18,742/- towards water usage charges levied by the State Water Resources Authority under the J&K Water Resources (Regulation & Management) Act, 2010 for the power supplied from Baglihar HEP to PSPCL.

10.10.2013

16.

16/2013

Punjab State Power Corporation Limited

Petition regarding amendment in Open Access Regulation notified vide PSERC/Secy./Reg./57 dated 01.07.2011

01.06.2015

16.(a)

16/2013

Punjab State Power Corporation Limited

Petition regarding amendment in Open Access Regulation notified vide PSERC/Secy./Reg./57 dated 01.07.2011

05.06.2015

17.

17/2013

Punjab State Power Corporation Limited

Petition regarding clause-49.4 of Condition of Supply- regarding revision of peak load exemption charges.

11.04.2013

18.

18/2013

Bhawani Castings Pvt. Ltd

Petition under Section 23 and Section 86(1)(c) of the Electricity Act, 2003 read with Regulation 9 of the PSERC (Conduct of Business) Regulations, 2005, for extension of time to install CT/PT meters in line with the metering guidelines, given by this Commission vide Order dated 06.01.2011 in Petition No.34 of 2010; and further for issuing necessary directions to the respondents to provide uninterrupted use of open access to the petitioners.

09.05.2013

19.

19/2013 (Suo-Motu)

Punjab State Power Corporation Limited

Petition under Section 142 of the Electricity Act, 2003 for violation of Section 55 of the Electricity Act, 2003, Regulation 21.1, 22.2 read with Sr.No.3.1 and 3.2 of Annexure-1 of the Punjab State Electricity Regulatory Commission (Electricity Supply Code and Related Matters) Regulations, 2007 and Sr.No.3.1 and 3.2 (Page 3) of Notification, The 2nd December, 2011 regarding procedure for payment of compensation in the event of failure to meet the Standard of Performance by the Licensee.

21.05.2014

20.

20/2013

Punjab State Power Corporation Limited

Petition for proposal regarding Conditions to be amended in the Conditions of Supply.

09.05.2013

21.

21/2013

Indus Towers Ltd.

Petition regarding Late Payment Surcharge on electricity bills – Amendment to existing Clause 22.2 of General Conditions of Tariff.

11.09.2013

22.

22/2013

Punjab State Power Corporation Limited

Petition to allow facility of cluster Sub Station to M/s Garg Acrylics with Load / CD 4658.451 KW / 3390 KVA and M/s Garg Acrylics Ltd. Garment unit with load / CD 496.610 KW / 495 KVA by making amendment in COS Clause 5.3 (a) – Facility of Cluster Sub Station.

25.07.2013

23.

23/2013

Chadha Sugars & Industries Pvt. Ltd.

Petition for revision of Tariff rate in respect of sale of surplus power to PSPCL under Section 86(1)(e) & 61 of Electricity Act, 2003.

16.08.2013

24.

24/2013

Shri Gurnek Singh Brar

Petition under Section 65, 86(1), 86(4) of the Electricity Act 2003 regarding adjustment of ROE against subsidy and matters relating to subsidy payment by Govt. of Punjab.

14.01.2014

25.

25/2013

Punjab State Power Corporation Limited

Petition regarding amendment in Schedule of Tariff

09.05.2013

26.

26/2013

Punjab State Transmission Corporation Limited

Regulation 22 of the Punjab State Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) Regulations, 2005 as amended by Punjab State Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff), second amendment Regulations, 2012 notified vide Notification dated 17th September, 2012

20.06.2013

27.

27/2013

Punjab State Transmission Corporation Limited

Petition for review under Section 94 (1) (f) of the Electricity Act, 2003 read with Regulation 64 of Punjab State Electricity Regulatory Commission (Conduct of Business) Regulations, 2005 for review of the order dated 10.04.2013 passed by the Commission in Petition No.70 of 2012 approving the Annual Revenue Requirements and determining the transmission tariff for the year 2013-14.

22.08.2013

28.

28/2013

R.P.Multimetals Private Limited

Petition under Section 86 (1) K of the Electricity Act, 2003 read with Regulation 49 and 50 of the Punjab State Electricity Regulatory Commission (Electricity Supply Code and Related Matters) Regulations, 2007, with a prayer that this Commission may be pleased to set aside the demand dated 07.09.2012, Annexure P/8 issued on the basis of calculations which are completely contrary to Circular No.68 of 2008 (Annexure P/4), since despite the fact the petitioner admittedly falls under the category of “Extra High Tension” and the applicable rates are under Serial No.9 still demand has been calculated by applying rates application to large supply customers as mentioned under Serial No.5 which is totally illegal and unsustainable in view of Judgement / Order dated 11.06.2012 titled as M/s Trident Limited V/s PSPCL bearing Petition No.5 of 2012 (Annexure P/6)

22.05.2013

29.

29/2013

Garrison Engineer for Dholewal Military Complex Military Engineer Services under Ministry of Defence

Petition under clause 5 & 6 of the regulations on electricity supply code for extension of compliance period for registration of A & A forms beyond 60 days of M/s Garrison Engineer, Military Engineer Services (Dholewal Mill Complex) under Ministry of Defence, Near Jagraon Bridge Ludhiana-141001.

20.06.2013

30.

30/2013

PTC India Ltd.

Petition under Section 86 (1) (f) of the Electricity Act, 2003 seeking declaration of the termination letter dated 09.03.2011 issued by Swasti Power Engineering Limited as illegal, arbitrary and bad in law.

02.09.2013

31.

32/2013

M/S Parmatma Singh Jatinder Singh Alloys Pvt. Ltd.

Petition under Section 142 of Electricity Act, 2003 read with clause 5, 6& 9 of the PSERC (Electricity Supply Code and Related Matters) Regulations, 2007 and other relevant sections of the Electricity Act, 2003 and regulations framed by the Commission, for taking necessary action against respondent No.1 and its officials for not issuing demand notice as per provisions of the Supply Code,2007 and further for directing the respondents to charge the amount for service connection charges as per rates applicable when the Demand notice was required to be issued as per Provisions of Supply Code,2007;and further for setting aside the demand of Rs.10,95,600/- raised by the respondents vide demand notice No.274 dated 6.03.2013, being issued in violation of the provisions of the Supply Code, 2007, framed by the Commission.

13.08.2013

32.

33/2013

Indian Yarn Limited

Petition for Carry Forward of Compliance of Renewable Purchase Obligation (Solar & Non-Solar REC”s) under 1st provision of Regulation 6(2) of RPO (Renewable Purchase Obligation) regulations.

25.07.2013

33.

34/2013

Shiva Texfabs Ltd.

Petition for Carry Forward of Compliance of Renewable Purchase Obligation (Solar REC”s) under 1st provision of Regulation 6(2) of RPO (Renewable Purchase Obligation) regulations.

30.07.2013

34.

35/2013

PHD Chamber of Commerce and Industry

Petition under Clause 64 of PSERC Conduct of Business Regulations, 2005 read with Section 94 (f) of the Electricity Act 2003 for reviewing the tariff order dated 10.04.2013, for the year 2013-14, passed in Petition No.71 of 2012, in the matter of Annual Revenue Requirement filed by the Punjab State Power Corporation Limited for financial year 2013-14 by this Commission.

30.08.2013

35.

36/2013

Punjab State Power Corporation Limited

Petition under clause 94(1) (F) of EA 2003 & clause 6(2) of the PSERC (RPO & its compliance) Regulations 2011 issued vide notification No. PSERC/Secy/Reg. 55 dated 03.06.2011 for carrying forward targets of Renewable Purchase Obligation (RPO) for FY 2012-13 specified in clause 3(1)

12.08.2013

36.

37/2013 (Suo-Motu)

Suo Motu

Determination of generic levellised generation tariff for Renewable Energy Power Projects for FY 2013-14

25.06.2013

37.

38/2013

National Fertilizers Limited

Petition for extension of compliance period of Renewable Purchase Obligation under Punjab State Electricity Regulatory Commission (Renewable Purchase Obligation and its compliance) Regulations, 2011 by way of purchase of Renewable Energy Certificate for the year 2011-12 and 2012-13 in the year 2013-14 by the petitioner-National Fertilizers Limited, Bathinda Unit.

07.08.2013

38.

39/2013

Sonalika Agro Industries Corporation

Petition under Clause 5 & 6 of the Regulations on Electricity Supply Code for setting aside letter no.3527 dated 5.11.12 whereby demand of Rs.19,80,000/- as service connection charges has been raised vide letter dated 1.4.13 (Annexure P-9) and letter dated 23.4.13 (Annexure P-12) and after setting aside the same to order refund of Rs.19,80,000/- with interest, deposited by the petitioner under protest.

04.09.2013

39.

40/2013

Punjab State Power Corporation Limited

Review Petition against PSERC Order dated 09.05.2013 in Petition No.07 of 2013 filed by M/s SEL Manufacturing Company Limited, Village Sekhon Majara, Rahon-Machhiwara Road, Tehsil Nawashahar, District S.B.S.Nagar, Punjab

30.08.2013

40 (a)

41/2013

Punjab State Power Corporation Limited

Petition under Section 86 (1) (f) of the Electricity Act, 2003 for adjudication of disputes and for directions.

27.12.2013

     (b)

41/2013
(On remand by APTEL)

Punjab State Power Corporation Limited

Petition under Section 86 (1) (f) of the Electricity Act, 2003 for adjudication of disputes and for directions.

02.12.2014

41.

42/2013

Avon Ispat and Power Limited (formerly known as Avery Cycle Industries Limited) Ludhiana

Petition regarding clause 47 of PSERC ‘Conditions of Supply’ (heading as well as 47.1) – Clarification/Modification and for applying the said provision for independent, continuous supply 66 KV Feeder Consumers as well. AND U/S 142 / 146 of the Electricity Act, 2003 for punishment to the respondents, for their failure to comply with orders / directions issued by this Commission in Petition No.28 of 2011, decided on 07.09.2011, whereby amended / substituted clause 47 of COS was made applicable w.e.f. 15.09.2011. AND Suitable order / directions directing the respondents to provide for separate line to the new consumer M/s Emson Gears Limited, which has been wrongly provided energy connection by solid tapping from ’66 KV Independent Feeder of Avery Cycle Industry’ as being not a Continuous Process Industry. AND In the meanwhile, suitable interim orders / directions be issued to the respondents to restrain them from converting the nature of Independent Feeder of petitioner known as ’66 KV Independent Feeder of Avery Cycle Industry’ into a Mixed Feeder.

06.09.2013

42.

43/2013

Impel Forge & Allied Industries Ltd.

Petition under section 142 of the Electricity Act, 2003 read with regulation 9 of PSERC (Electricity Supply Code and Related Matters) Regulations, 2007 and other provisions of regulations framed by this Commission praying for taking necessary action against the respondent and its officials for raising impugned demand of Rs.7,36,000/-, from the petitioner, on account of Service Connection Charges (Variable Charges at the rate of Rs.320/- per meter), in violation of provisions of regulation 9 of PSERC (Electricity Supply Code and Related Matters), Regulations, 2007, and clause 12 of the Conditions of Supply and provisions of the Electricity Act, 2003 and further for setting aside the impugned demand of Rs.7,36,000/- raised on account of arrears of service connection charges.

21.02.2022

43.

44/2013

K.J International, Village Khingran Choe

Petition under section 142 of the Electricity Act, 2003 read with regulation 9 of PSERC (Electricity Supply Code and Related Matters) Regulations, 2007 and other provisions of regulations framed by this Commission praying for taking necessary action against the respondent and its officials for raising impugned demand of Rs.7,36,000/-, from the petitioner, on account of Service Connection Charges (Variable Charges at the rate of Rs.320/- per meter), in violation of provisions of regulation 9 of PSERC (Electricity Supply Code and Related Matters), Regulations, 2007, and clause 12 of the Conditions of Supply and provisions of the Electricity Act, 2003 and further for setting aside the impugned demand of Rs.7,36,000/- raised on account of arrears of service connection charges.

21.02.2022

44.

45/2013

Punjab State Power Corporation Limited

Petition for review of PSERC Notification No.PSERC/Secy./Reg.82 dated 21.06.2013 regarding amendment in PSERC (Electricity Supply Code and Related Matters) Regulations, 2007 and amended thereof

11.09.2013

45.

46/2013

Punjab State Federation of Co-operative House Building Societies Ltd. (HOUSEFED PUNJAB)

Petition under clause 51 of the conditions of supply for necessary interpretations to the effect:-
(i) That date of approval of construction plan of a housing colony by a competent authority has to be taken as cut off date for applying rules and regulations prevalent at that time and not the date when the connection is applied.
(ii) Whether the clause 9.2 of ESMI-2011 could be made applicable on the petitioner, whose construction plan was sanctioned by the competent authority on 15.7.2009 and the construction has been done as per that construction plant? (iii) Whether the Commercial Circular 35/2009 or clause No.36.8 of ESMI-2011 could be made applicable on the petitioner, whose construction plan was sanctioned by the competent authority on 15.7.2009?
And
Further for issuance of necessary directions to the respondent to release the electricity connection to the petitioner on 11 KV supply.

24.10.2013

46.

47/2013

Punjab State Power Corporation Limited

Petition for amendment in Power Purchase Agreement dated 18.01.2010 signed between erstwhile PSEB and NPL under Article 18: “MISCELLANEOUS PROVISIONS” for change in unit configuration from 2x660 MW (1320MW) to 2x700MW (1400MW) for Rajpura Thermal Power Project.

08.03.2018

47.

48/2013

Indian Sucrose Limited

Petition under Section 61 and 86 of the Electricity Act, 2003 for determination/grant of generic/preferential tariff and directing the respondent No.1 for purchase of surplus power upto 6 MW from petitioner’s 12 MW Co-Generation Power Plant at Mukerian, District Hoshiarpur on long term basis at tariff so determined as per CERC RE Regulations duly adopted by the PSERC in order to promote co-generation and generation of electricity from renewable sources of energy as envisaged under the Electricity Act, 2003, National Electricity Policy, National Tariff Policy and the NRSE Policies of GoP.

24.03.2014

48.

49/2013

Punjab State Power Corporation Limited

Petition for proposal regarding inclusion of availability clauses in General Conditions of Tariff with regard to Diversification of Agriculture – A.P. Tariff for Livestock Sector.

18.11.2014

49.

50/2013

Punjab State Power Corporation Limited

Petition regarding giving rebate to LS consumers in the bills for implementing TOD tariff based on DDL done by MMTS organization at an interval of 70 days.

31.10.2013

50.

51/2013

Punjab State Power Corporation Limited

Petition for seeking clarification / amendment in PSERC Order dated 23.10.2012 in Petition No.66 of 2011 against clause No.18.4 of the General Conditions of Tariff approved by the PSERC applicable w.e.f. 01.04.2006 and adopted by PSEB (now PSPCL) vide Circular No.36/06 dated 14.07.2006.

01.11.2013

51.

52/2013

Punjab State Power Corporation Limited

Petition under Section 86 (1) (b) and 86 (1) (e) and other applicable provisions of the Electricity Act, 2003 for purchase of electricity from solar energy generators in the State of Punjab.

14.11.2013

03.12.2013

52.

53/2013

Punjab State Power Corporation Limited

Petition for approval of purchase of electricity by the petitioner, Punjab State Power Corporation Limited from M/s RSSB Educational & Environmental Society from its proposed 7.52 MW Solar PV Power Project using Crystalline Technology on rooftop.

13.12.2013

53.

54/2013

Punjab State Transmission Corporation Limited

Review Petition against PSERC Order dated 30.08.2013 in Petition No.7 of 2013 filed by M/s SEL Manufacturing Company Limited and Review Petition No.40 of 2013 filed by Punjab State Power Corporation Limited, The Mall, Patiala.

22.11.2013

54.

55/2013

Talwandi Sabo Power Limited

Petition under Regulation 9 of the PSERC (Conduct of Business) Regulations, 2005 and applicable provision(s)of the Electricity Act, 2003- Issue pertaining to the wrongful classification of Talwandi Sabo Power Limited (TSPL, which is a generator), as an “Industrial Consumer” and application of peak load exemption charges, power factor surcharge, penalty, service connection charges etc. on a generator availing start up power facility from the distribution licensee.

08.01.2014

55.

56/2013

M/s Nabha Power Limited

Petition under Regulation 9 of the PSERC (Conduct of Business) Regulations, 2005 read with rule 9 of the Punjab State Electricity Regulatory Commission (Electricity Supply Code & Related Matters) Regulations, 2007 for setting aside the demand of `6,60,00,000 raised by the respondent on account of Service Connection Charges being issued in violation of the provisions of rule 9 of the Punjab State Electricity Regulatory Commission (Electricity Supply Code & Related Matters) Regulations, 2007 and the provisions of the Electricity Act 2003:

08.01.2014

56.

57/2013

Nabha Power Limited

Petition under Sections 86(1)(b) and 86(1)(f) of the Electricity Act, 2003, seeking approval of the terms and conditions for procurement of coal from alternate sources and pass through of the landed cost of such coal.

19.02.2014

57.

58/2013

Trident Limited

Petition under Section 86 (1) K of Electricity Act, 2003 read with Regulation 49 and 50 of Punjab State Electricity Regulatory Commission (Electricity Supply Code and Related Matters) Regulations, 2007 (as amended upto date) for allowing continuous process load retrospectively and not prospectively as per sanction and not to levy additional 10p / per unit energy charges on continuous process consumers on actual consumption of energy drawn from PSPCL while issuing sanction of continuous process of load as per provisions of PR Circular No.06/2012.

07.03.2014

58.

59/2013
&
04/2014

Shri Gurnek Singh Brar

1. Shri Gurnek Singh Brar
2. Shri Padamjit Singh

Petition on the subject of outsourced meter reading / spot billing

Petition under section 61, 86(1), 57 of Electricity Act 2003 regarding reorganization of distribution organization on functional basis.

28.11.2014

59.

60/2013

Talwandi Sabo Power Limited (TSPL)

Petition under applicable provisions of Section 86 (1) (b & f) of Electricity Act, 2003 for approval of procurement of coal from alternate sources through competitive bidding process and approval of energy charges as per the Hon’ble APTEL Judgement dated August 21, 2013 in Interim Appeal No.226 of 2013 in Appeal No.56 of 2013 filed by Talwandi Sabo Power Limited - 3 x 660 MW Talwandi Sabo Thermal Power Project (“Project”).

11.02.2014

60.

61/2013

Derabassi Industries Association

Petition under Regulation No.16 of the Notification No.31 of PSERC (Electricity Supply Code) Regulations, 2007, in respect of Additional ACD charged in the electricity bill by Punjab State Power Corporation Limited.

17.04.2014

61.

62/2013

Punjab State Transmission Corporation Limited

Petition for ARR & Determination of Tariff for FY 2014-15 filed by Punjab State Transmission Corporation Limited.

27.03.2014

62.

63/2013

Punjab State Power Corporation Limited

Petition for Aggregate Revenue Requirement and Determination of Tariff for FY 2014-15 filed by Punjab State Power Corporation Limited

27.03.2014

63.

Petition No. 63 of 2013, 71 of 2014 and 31 of 2015

In Compliance of the Order dated 29.04.2022 passed by the Hon’ble APTEL in Appeal No. 264 of 2014, 173 of 2015 and 277 of 2015 filed by PSPCL arising out of Petition No. 63 of 2013, 71 of 2014 & 31 of 2015 respectively.

Petition No. 63 of 2013 for Aggregate Revenue Requirement and Determination of Tariff for FY 2014-15 filed by Punjab State Power Corporation Limited.

And

Petition No. 71 of 2014 for Aggregate Revenue Requirement and Determination of Tariff for FY 2015-16 filed by Punjab State Power Corporation Limited.

And

Petition No. 31 of 2015 (Suo Motu) for compliance of APTEL Judgment dated 22.04.2015 in Appeal No. 174 of 2013 filed by PSPCL against Commission Order dated 28.03.2013 passed in Review Petition No. 10 of 2013 for reviewing the Order dated 07.01.2013 of the Commission passed in Petition No. 57 of 2012 (Suo-Motu) initiated for implementation of judgment dated 18.10.2012 of Hon’ble APTEL in Appeal No. 07, 46, and 122 of 2011 filed by PSPCL.

08.02.2023

64.

64/2013

Punjab State Transmission Corporation Limited

Regulation 22 of the Punjab State Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) Regulations, 2005 as amended by Punjab State Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff), second amendment Regulations, 2012 notified vide Notification dated 17th September, 2012.

22.05.2014

65.

65/2013

GVK Power (Goindwal Sahib) Limited

Petition under Section 86 (1) (a), (b) and (f) and other applicable provisions of the Electricity Act, 2003 for adjudication of the disputes and for directions - Power Purchase Agreement for purchase of power from 2 x 250 MW (+20%) Goindwal Sahib Thermal Power Plant at Goindwal Sahib, Punjab.
AND
Petition under Section 86 of the Electricity Act, 2003 and Articles 12, 13 and 17 of the Amended and Restated Power Purchase Agreement dated 26.05.2009 executed between GVK Power (Goindwal Sahib) Limited and Punjab State Power Corporation Limited (formerly known as Punjab State Electricity Board) for declaration of the occurrence of Change in Law and Force Majeure events.

01.02.2016