List of Commission orders/ judgments passed in various cases.
S.No. |
Petition
No. |
Filed
by |
Subject
matter |
Date of final decision.
|
|
1. |
1/2012 |
Punjab State Power Corporation Limited |
Petition regarding Voluntary Disclosure Scheme (VDS) for Domestic Supply / Non-residential Supply (DS/NRS) consumers. |
31.01.2012 | |
2. |
2/2012 |
Reliance Communications Ltd. and another |
Petition under Section 86 A & K read with Section 45 of the Electricity Act 2003, to direct respondent No.1 to 4 to convert the SEB Tariff from commercial to Industrial in line with IT / ITES Policies of 2001, 2002 finally in 2009 vide circular No.9/2009 dated 06.02.2009 of Punjab Government and in terms of letter dated 23.11.2009 issued by respondent No.4 in respect of all the electricity connections, connecting the mobile, towers MCN and ICD’s etc. of the petitioners installed in the State of Punjab AND further to direct the respondents to charge the tariff from the petitioner in terms of the said policies, circulars and letter dated 23.11.2009 AND/OR for the issuance other order or directions which the Commission may deem fit and proper in the case. |
30.08.2012 | |
3. |
3/2012 |
M/s Ludhiana Hands Tools Association |
Petition U/S 86/94 of Electricity Act 2003 regarding treatment to be meted to Billet / Induction heating load by PSPCL and quashing of CC 38/2009 dated 29.10.2009. |
21.03.2012
(Interim) 04.07.2012 (Interim) 28.10.2013 (Final Order) |
|
4. |
4/2012 |
M/s Jai Parvati Forge Ltd. |
Petition under Clause 5.2 (Note ii) of the Conditions of Supply for catering supply at lower voltage on payment of surcharge. |
16.03.2012 | |
5. |
5/2012 |
Trident Limited |
Petition under Section 86 (1) K of Electricity Act, 2003 read with Regulation 49 and 50 of Punjab State Electricity Regulatory Commission (Electricity Supply Code and Related Matters) Regulations, 2007 (as amended upto date) to issue the exact interpretation of provision of Regulation 9.1.2 (i) (c) of Punjab State Electricity Regulatory Commission (Electricity Supply Code and Related Matters), Regulations, 2007 as it being the issuing authority of the Regulations and to advise to respondent to release the additional load during the pendency of the present petition. |
11.06.2012 | |
6. |
6/2012 |
Punjab State Power Corporation Limited |
Petition for proposal regarding conditions to be amended in ‘Conditions of Supply’ |
28.06.2012 | |
7. |
7/2012 |
Punjab State Power Corporation Limited |
Petition under clause 94 (1) (f) of EA 2003 & clause 3 (2) of the PSERC (RPO & its compliance) Regulations, 2011 issued vide notification No.PSERC / Secy / Reg/ 55 dated 03.06.2011 for downward revision of percentage targets of Renewable Purchase Obligation (RPO) specified in Clause 3(1). |
04.05.2012 | |
8. |
8/2012 |
Shri Gurnek Singh Brar |
Petition under section 142, 86 (1) (a) of E. Act 2003 regarding non compliance by Govt. of Punjab of Commission Order dated 9.5.2011 on tariff for 2011-12. |
10.12.2012 | |
9. |
9/2012 |
Punjab State Power Corporation Limited |
Petition for Fuel Cost Adjustment (FCA) Surcharge for 3rd Quarter (Oct., 2011 to Dec., 2011) of FY 2011-12. |
20.07.12 | |
10. |
10/2012 |
Punjab State Power Corporation Limited |
Petition under Section 23 of the Electricity Act, 2003 for authorizing the PSPCL to impose Power Cuts, Peak Load Hours restrictions and taking other Regulatory Measures for the year 2012-13. |
23.04.2012 | |
11. |
11/2012 |
Punjab State Power Corporation Limited |
Petition under Section 86(1)(b) of Electricity Act 2003 regarding signing of Fuel Supply Agreement with M/s Mahanadi Coalfields Limited in respect of 1980 MW Talwandi Sabo Thermal Power Project. |
27.09.2012 | |
12. |
11/2012 and 46/2012 (On remand by Hon’ble APTEL vide Judgment dated 07.04.2016) |
Punjab State Power Corporation Limited |
Compliance of Judgment dated 07.04.2016 of Appellate Tribunal for Electricity in Appeal Nos. 56 of 2013 and 84 of 2013 filed by Talwandi Sabo Power Limited Versus PSPCL and PSERC before Hon’ble APTEL against the Commission’s Order dated 24.12.2012 and 27.09.2012 in Petition No. 46 of 2012 and Petition No. 11 of 2012. |
06.09.2016 | |
12 (a). |
Amendment in Order |
Punjab State Power Corporation Limited |
Compliance of Judgment dated 07.04.2016 of Appellate Tribunal for Electricity in Appeal Nos. 56 of 2013 and 84 of 2013 filed by Talwandi Sabo Power Limited Versus PSPCL and PSERC before Hon’ble APTEL against the Commission’s Order dated 24.12.2012 and 27.09.2012 in Petition No. 46 of 2012 and Petition No. 11 of 2012. |
08.09.2016 | |
13. |
12/2012 |
Punjab State Transmission Corporation Limited |
In Petition No.45 of 2010 for determination of Annual Revenue Requirement and consequent tariff for the financial year 2011-12. |
22.10.2012 | |
14. |
13/2012 |
Punjab Un-aided Technical Institutions Association |
Petition for the amendment of condition No.5.2(b) of the “Condition of Supply” effective from 1st April, 2010 of Pb. State Power Corporation Ltd. Patiala and approved by Pb. State Electricity Regulatory Commission Chandigarh regarding Supply Voltage and Contract Demand in respect of DS/NRS/BS loads. |
03.09.2012 | |
15. |
14/2012, |
Siel Chemical Complex, a Unit of M/s Mawana Sugars Ltd. and 10 others |
Petition under Section 142 of the Electricity Act, 2003 for setting aside memo No.2905 dated 21.3.2012 issued by the respondent in flagrant disregard to Electricity Act, 2003, as well as rules and Regulations framed time to time by the Commission. |
03.10.2012 | |
16. |
18/2012 |
Punjab State Power Corporation Limited |
Petition regarding signing of Fuel Supply Agreement with M/s South Eastern Coalfields Limited, Bilaspur (Chhatisgarh) in respect of 1400 MW Rajpura TPP. |
03.10.2012 | |
17. |
23/2012 |
Mandi Gobindgarh Induction Furnace Association |
Petition under Section 64 of Electricity Act, 2003 read with Regulation 52 of the Punjab State Electricity Regulatory Commission (Conduct of Business) Regulations, 2005 (as amended up to date) for making Tariff Order effective with prospective effect with due notice period. |
19.07.2012 | |
18. |
26/2012 |
Neel Kanth Concast Steels Pvt. Ltd. |
Petition under Regulation 5.5, 5.6 & 6 of Electricity Supply Code (or amendment thereof) & Related Matters Regulations & Conditions of Supply, read with Section 142 of the Electricity Act, 2003. |
06.08.2012 | |
19. |
28/2012 |
Jai Parvati Forge Ltd. |
Review Petition under section 64 of Punjab State Electricity Regulatory Commission (Conduct of Business) Regulations 2005, praying for reviewing the Order dated 16.3.2012 passed by the Commission in Petition No.4 of 2012. |
03.09.2012 | |
20. |
29/2012 |
RIMT Institutions |
Petition under clause 23 (Interpretation of Tariff) of General Conditions of Tariff and Schedules of Tariff effective from 01.04.2006 and adopted by PSEB (now PSPCL) vide CC No.36/06 dated 14.07.2006. |
06.08.2012 | |
21. |
30/2012 |
Nabha Power Limited and another |
Petition under Section 86(1)(f) of the Electricity Act, 2003 in relation to disputes arising under the PPA dated 18.01.2010 between the petitioner herein – Nabha Power Limited and Punjab State Power Corporation Limited (PSPCL), a successor entity of the Punjab State Electricity Board (PSEB) - 2x700 MW Rajpura Thermal Power Project being executed by Nabha Power Limited under the PPA dated 18.01.2010 - Changes in the Mega Power Policy, 2006 and the Foreign Trade Policy, 2009 – 2014 and the corresponding claims of the parties under Article 13.1 of the PPA dealing with ‘Change in Law’ provision. |
12.11.2012 | |
22. |
30/2012 |
Nabha Power Limited |
Petition under Section 86(1)(f) of the Electricity Act, 2003 in relation to disputes arising under the PPA dated 18.01.2010 between the petitioner herein – Nabha Power Limited and Punjab State Power Corporation Limited (PSPCL), a successor entity of the Punjab State Electricity Board (PSEB) - 2x700 MW Rajpura Thermal Power Project being executed by Nabha Power Limited under the PPA dated 18.01.2010 - Changes in the Mega Power Policy, 2006 and the Foreign Trade Policy, 2009 – 2014 and the corresponding claims of the parties under Article 13.1 of the PPA dealing with ‘Change in Law’ provision. |
16.12.2014 | |
23. |
31/2012 |
Quarkcity Energy Private Limited |
Petition under Section 14 and Section 46 of Indian Electricity Act, 2003 for exemption from tariff fixation for M/s Quarkcity Energy Private Limited. |
06.08.2012 | |
24. |
32/2012 |
Punjab State Power Corporation Limited |
Petition for Fuel Cost Adjustment (FCA) Surcharge for 4th Quarter (January, 2012 to March, 2012) of FY 2011-12. |
19.10.2012 | |
25. |
33/2012 |
Induction Furnace Association of North India |
Petition under clause 46 of Punjab State Electricity Regulatory Commission (Terms and Conditions for Intra-state Open Access) Regulations, 2011 for modifying or amending the regulation 25 (5) of Punjab State Electricity Regulatory Commission (Terms and Conditions for Intra-state Open Access) Regulations, 2011, amended vide notification dated 4.5.2012 in view of the order passed by the Commission in Petition No.60 of 2011 filed by the Punjab State Power Corporation Ltd., Distribution Licensee and for restoring the earlier regulation 25(5) of the above and regulations which were applicable before amendment of the same vide notification dated 4.5.2012. With further prayer to review the order dated 4.5.2012 passed by the Commission in Petition No.60 of 2011 filed by Punjab State Power Corporation by exercising the powers under Section 94 (1) (f) of the Electricity Act, 2003 read with regulation 64 of the PSERC (Conduct of Business) Regulations 2005. |
05.04.2013 | |
26. |
34/2012 |
Chandigarh Distillers & Bottlers Limited |
Petition for sale upto 5 MW power under Open Access from 8.25 MW Co-Generation Plant at existing distillery at Banur, Tehsil Mohali, District SAS Nagar, Punjab under Section 39 (2) (d) of the Electricity Act, 2003. |
27.08.2012 | |
27. |
35/2012 |
Suo Motu |
Adoption of Central Electricity Regulatory (Terms & Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2012 and Determination of generic levelised generation tariff for Renewable Energy Power Projects for FY 2012-13. |
19.07.2012 Click here for Order Click here for Annexure |
|
28. |
36/2012 |
Motia Real Estate |
Petition in the matter of release of Electricity connection in Residential colonies, shopping Malls and Building complexes etc - violation of Reg. 9.1.1 (i) (b) of Electricity Supply Code 2007. |
11.07.2012 | |
29. |
37/2012 |
Bharat Sanchar Nigam Limited |
Petition under clause 23 (Interpretation of Tariff) of General Condition of Tariff and schedule of Tariff effective from 01.04.2006 and adopted by PSEB (now PSPCL) vide CC No. 36/06 dated 14.07.2006. |
01.08.2012 | |
30. |
38/2012 |
Punjab Alkalies & Chemicals Limited |
Petition for review of PSERC Order dated 01.06.2012 titled “Policy for grant of continuous process status to industrial consumers – revised procedure” , under clause 64 of PSERC Conduct of Business Regulations, 2005. |
11.07.2012 | |
31. |
39/2012 |
Motia Real Estate |
Petition in the matter of release of Electricity connections in Residential Colonies, Shopping Malls and Building Complexes etc. – violation of clause 8 of conditions of supply and Reg. 9.1.1 (i) (b) and 6.3 (b) Electricity Supply Code 2007. |
14.09.2012 | |
32. |
40/2012 |
Siel Chemical Complex, a Unit of M/s Mawana Sugars Ltd. |
Petition seeking review of Order dated 1.6.2012 whereby guidelines have been laid down for Continuous Process Industry. |
06.09.2012 | |
33. |
41/2012 |
Jaswinder Pal Singh and another |
Petition under clause 23 (Interpretation of Tariff) of General Conditions of Tariff issued by the PSERC and for restraining the respondents from recovering any amount earlier, allowed to the petitioners on account of 7.5% H.T.Rebate for the period from August 2006 to December 2009 and for directing the respondents to refund the amount already recovered from the petitioners No.1 & 2 on account of HT Rebate and further for issuance of a direction to the respondents to pay 7.5% H.T. rebate upto 31.3.2010 as per Tariff Order for the year 2009-2010. |
10.10.2012 | |
34. |
42/2012 |
Suo-motu Petition |
Fuel Audit of various Thermal Plants of Punjab State Power Corporation Limited. |
08.10.2012 | |
35. |
44/2012 |
Green Planet Energy (P) Ltd. |
Petition under Section 86 of the Electricity Act, 2003 for fixation of tariff for Biogas Based Power Plants based upon Biomethanation technology |
17.10.2012(to be read with Order dated 30.10.2012) 30.10.2012 |
|
36. |
45/2012 |
Punjab State Transmission Corporation Limited |
Petition for review under Section 94(1)(f) of the Electricity Act, 2003 read with Regulation 64 of Punjab State Electricity Regulatory Commission (Conduct of Business) Regulations, 2005 for review of the order dated 16.7.2012 in Petition No.67 of 2011 passed by the Commission approving the revenue requirements and tariff for the year 2012-13 and review of financials for the year 2011-12. |
10.10.2012 | |
37. |
46/2012 |
Talwandi Sabo Power Limited |
Petition under Section 86(1)(b) and 86(1)(f) of the Electricity Act, 2003 in relation to disputes arising under the power purchase agreement dated 01.09.2008 (“PPA”) between Talwandi Sabo Power Limited, the petitioner herein, and the respondent – Punjab State Electricity Board (PSEB), which stands substituted by Punjab State Power Corporation Limited (PSPCL) as the successor entity on unbundling of PSEB AND Failure and/or refusal of PSPCL to fulfill its obligation of arranging sufficient quantity / quality / grade / origin of coal in terms of the Competitive Bidding Guidelines, Bidding Documents (the RfQ and RfP), the PPA and the Memorandum of Understanding with PSPCL dated 02.09.2008 for the Project of 1980 MW that is being set up under the Case 2 model. (3x660 MW Talwandi Sabo Thermal Power Project) |
24.12.2012 | |
38. |
47/2012 |
Shri Gurnek Singh Brar |
Petition under section 55, 86 (1) (i), 142, 181 of Electricity Act 2003 regarding non-availability of single phase Energy Meters in PSPCL since May 2012. |
02.11.2012 | |
39. |
48/2012 |
Punjab State Power Corporation Limited |
Petition under section 86(1)(f) for adjudication of dispute as the fulfillment of condition precedent related to the financial closure of the project being established by the respondents. |
31.01.2014 | |
40. |
49/2012 |
Punjab State Transmission Corporation Limited |
Petition for effecting proper load management by Punjab State Power Corporation Limited and curbing over-drawal in terms of the Indian Electricity Grid Code and Unscheduled Interchange charges Regulations - Compliance of directions of SLDC u/s 33 of the Electricity Act, 2003 |
16.01.2013 | |
41. |
50/2012 |
Bajwa Developers Limited |
Petition in the matter of release of electricity connection to Bajwa Developers Limited for 142.80 acre colony Sunny Enclave at village Desu Majra (Kharar) – violation of regulation 5 & 6 of Electricity Supply Code 2007. |
28.11.2013 | |
42. |
51/2012 |
PTC India Limited |
Petition regarding unilateral deduction by Punjab State Power Corporation Limited (PSPCL) of the legitimate dues amounting to Rs.315.11355 lacs payable to PTC India Limited (PTC) for supply of contracted power in violation of the terms and conditions of the Power Supply Agreement (PSA) dated 06.05.2011 entered into between PTC and PSPCL - Dispute between licensees under Section 86 (1) (f) of the Electricity Act, 2003 and Regulation 10 of the Punjab State Electricity Regulatory Commission (Conduct of Business) Regulations, 2005. |
08.03.2013 | |
43. |
52/2012 |
Rana Sugars Limited |
Petition under Section 61 and 86 of the Electricity Act, 2003 for directing the PSPCL for purchase of15 MW (revised to 20 MW) surplus power from Petitioner’s Co-Generation Power Plant, which is accredited and registered under Central Electricity Regulatory Commission (Terms and Conditions for recognition and issuance of Renewable Energy Certificate for Renewable Energy Generation) Regulations, 2010 (REC Regulations 2010) on ‘Pooled Cost of Purchase’ (APPC) as determined by the Commission in the Tariff Order 2012-13 or determine tariff based on generic tariff allowed by the Commission for supply of Power on long term basis from such plants in order to promote co-generation and generation of electricity from renewable source of energy as envisaged under the Electricity Act, 2003, National Electricity Policy, Tariff Policy and the NRSE Policy of GOP. |
30.11.2012 | |
44. |
53/2012 |
A.B.Sugars Limited |
Petition under Section 61 and 86 of the Electricity Act, 2003 for directing the PSPCL for purchase of 20 MW surplus power from Petitioner’s Co-Generation Power Plant, which is accredited and registered under Central Electricity Regulatory Commission (Terms and Conditions for recognition and issuance of Renewable Energy Certificate for Renewable Energy Generation) Regulations, 2010 (REC Regulations 2010) on ‘Pooled Cost of Purchase’ (APPC) as determined by the Commission in the Tariff Order 2012-13 or determine tariff based on generic tariff allowed by the Commission for supply of Power on long term basis from such plants in order to promote co-generation and generation of electricity from renewable source of energy as envisaged under the Electricity Act, 2003, National Electricity Policy, Tariff Policy and the NRSE Policy of GOP. |
30.11.2012 | |
45. |
54/2012 |
Everest Power Private Limited |
Petition filed under Section 62(2) of the Electricity Act, 2003 read with Regulation 56(2), (3) and (4) of Punjab State Electricity Regulatory Commission (Conduct of Business) Regulations, 2005. |
17.01.2013 Interim Order 27.11.2013 Final Order |
|
(b) |
54/2012 |
Everest Power Private Limited |
Petition filed under Section 62(2) of the Electricity Act, 2003 read with Regulation 56(2), (3) and (4) of Punjab State Electricity Regulatory Commission (Conduct of Business) Regulations, 2005. |
04.12.2014 | |
(c) |
54/2012 |
Everest Power Private Limited |
Interlocutory Applications dated 31st January 2015 and 10th March, 2015 under section 94 (2) of the Electricity Act, 2003 read with applicable regulations of Punjab State Electricity Regulatory Commission (Conduct of Business) Regulations, 2005 for compliance of Order dated 04.12.2014 and for interim relief. |
28.05.2015 | |
46. |
55/2012 |
PTC India Limited |
Petition/Application under Regulation 64 of Punjab State Electricity Regulatory Commission (Conduct of Business) Regulations, 2005 and Section 94 (1) (f) of the Electricity Act, 2003. |
06.11.2012 | |
47. |
56/2012 |
Nabha Power Limited and another |
Petition under Section 86(1)(b) and 86(1)(f) of the Electricity Act, 2003 in relation to disputes arising under the power purchase agreement dated 18.01.2010 (PPA) between Nabha Power Limited, the petitioner herein, and the respondent - Punjab State Electricity Board, which stands substituted by Punjab State Power Corporation Limited as the successor entity on unbundling of PSEB AND Failure and/or refusal of PSPCL to fulfill its obligation of arranging sufficient quantity / quality / grade / origin of coal in terms of the Competitive Bidding Guidelines, Bidding Documents (the RfQ and RfP) and the PPA for the Poject of 1400 MW that is being set up under the Case 2 model. |
31.12.2012 | |
48. |
57/2012 (Suo-motu) (On remand back from Hon’ble APTEL vide Judgement dated 18.10.2012 in Appeal Nos. 7, 46 & 122 of 2011 ) |
Suo-motu |
In the matter of Judgement dated 18.10.2012 of Hon’ble APTEL in Appeal Nos. 7, 46, 122 of 2011 AND in the matter of Tariff Orders dated 08.09.2009 in Petition No.1 of 2009 for erstwhile PSEB for Financial Year 2009-2010 and dated 23.04.2010 in Petition No.25 of 2009 for erstwhile PSEB for Financial Year 2010-2011 and dated 09.05.2011 in Petition No.49 of 2010 for PSPCL for Financial Year 2011-2012 AND in the matter of Punjab State Power Corporation Limited and Punjab State Transmission Corporation Limited |
07.01.2013 | |
49. |
58/2012 |
Punjab State Power Corporation Limited |
Petition regarding amendment in Clause (25) under Chapter ‘5’ titled as “Open Access Charges” for Transmission and Wheeling Charges in case of NRSE projects of Open Access Regulation, 2011. |
13.12.2012 | |
50. |
59/2012 |
Enterprise Business Solutions Pvt. Ltd. |
Petition under Section 86 of the Electricity Act, 2003, for signing of PPA and sale of power to PSPCL from 1.5 MW Solar Photovoltaic based Power Plant at Sahadra-Sahiba Balachaur in Punjab in order to promote cogeneration and generation of electricity from renewable sources of energy as envisaged under the NRSE Policy-2006 and specified by Suo Motu order of PSERC dated 31.10.2011. |
20.12.2013 | |
51. |
60/2012 |
Armaan Steels |
Petition under Regulation 5.5, 5.6 & 6 of Electricity Supply Code (or amendment thereof) & Related Matters Regulations & Conditions of Supply, read with Section 142 of the Electricity Act 2003 AND Against decision dated 17.8.2012 of Feasibility Clearance Committee of the Punjab State Power Corporation Limited, recorded at S.No.2 in respect of Armaan Steels, A-07, Industrial Focal Point, Mandi Gobindgarh forfeiting EM of Rs.9.45 Lacs AND |
30.01.2013 | |
52. |
61/2012 |
Talwandi Sabo Power Limited |
Review Petition under Section 94(1)(f) of Electricity Act, 2003 and Regulation 64 of the Punjab State Electricity Regulatory Commission (Conduct of Business) Regulations, 2005 for review of the final order and judgement of the Commission dated 27.9.2012 in Petition No.11 of 2012. |
18.12.2012 | |
53. |
62/2012 |
Punjab State Power Corporation Limited |
Petition to recover cost of separate feeder from each developer irrespective of proposed load of the colony/project – Amendment in Clause 8 of Conditions of Supply. |
20.03.2013 | |
54. |
63/2012 |
Punjab State Power Corporation Limited |
Petition regarding amendments in clauses of Conditions of Supply. |
01.02.2013 | |
55. |
64/2012 |
Chandigarh Distillers & Bottlers Limited |
Petition under Section 61 and 86 of the Electricity Act, 2003 for directing the PSPCL for purchase of upto 5 MW surplus power from Petitioner’s NRSE Co-Generation Power Plant, which is located in Distillery Campus at Village Banur, Tehsil Mohali, District S.A.S. Nagar, Punjab in order to promote co-generation and generation of electricity from renewable sources of energy as envisaged under the Electricity Act, 2003, National Electricity Policy, Tariff Policy and the NRSE Policy of Govt. of Punjab. |
28.02.2013 | |
56. |
65/2012 |
Ludhiana Hand Tools Association |
Petition under Section 86/94 of Electricity Act, 2003, against wrong implementation of order dated 21.12.2011 of Punjab and Haryana High Court in the case of M/s Samrat Forgings. |
10.01.2013 | |
57. |
66/2012 |
Punjab State Power Corporation Limited |
Review Petition for review of Order dated 08.10.2012 passed by the Commission in Petition No.42 of 2012 (Suo- motu) regarding Fuel Audit of various Thermal Power Plants of Punjab State Power Corporation Limited. |
27.02.2013 | |
58. |
67/2012 |
Shakti Land Developers |
Petition under clause 23 (Interpretation of Tariff) of General Conditions of Tariff issued by the PSERC and for restraining the respondents from recovering any amount earlier, allowed to the petitioner on account of 7.5% H.T. Rebate for the period from August 2006 to December 2009 and for directing the respondents to refund the amount already recovered from the petitioner on account of HT Rebate and further for issuance of a direction to the respondents to pay 7.5% H.T. rebate upto 31.3.2010 as per Tariff Order for the year 2009-2010 and further for taking necessary action under Section 142 of the Electricity Act, 2003. |
02.01.2014 | |
59. |
68/2012 |
S.S. Concast Pvt. Ltd. |
Petition under Section 142 of Electricity Act, 2003 read with clause 5 & 6 of the PSERC (Electricity Supply Code and Related Matters) Regulations, 2007 and other relevant sections of the Electricity Act, 2003 and regulations framed by the Commission, for taking necessary action against respondent No.1 and its officials for not issuing demand notice as per provisions of the Supply Code and letter dated 7.9.2012 issued by the Commission, and further for directing the respondents to charge the amount for service connection charges as applicable when the electricity connection was applied for by the petitioner; and further for setting aside the demand of Rs.5489000/- raised by the respondents vide demand notice No.4862 dated 4.10.2012, being issued in violation of the provisions of the Supply Code and the letter dated 7.9.2012 issued by the Commission. |
08.04.2013 | |
60. |
69/2012 |
Lakshmi Energy and Foods Limited |
Petition under Section 61 and 86 of the Electricity Act, 2003 and under provisions of National Electricity Policy, Tariff Policy and the NRSE Policy of GoP for determination of preferential tariff for the Petitioner’s project and directing the Respondent No.1 i.e. PSPCL for purchase of surplus power upto 24 MW from Petitioner’s 2x15.75 MW Rice Husk based Co-Generation Power Plant at Khamanon, District Fatehgarh Sahib at Generic Tariff as per CERC RE Regulations duly adopted by Hon’ble PSERC. |
28.02.2013 | |
61. |
70/2012 |
Punjab State Transmission Corporation Limited |
Petition for ARR & Determination of Tariff for FY 2013-14 filed by Punjab State Transmission Corporation Limited |
28.03.2013 | |
62. |
71/2012 |
Punjab State Power Corporation Limited |
Petition for Aggregate Revenue Requirement and Determination of Tariff for FY 2013-14 filed by Punjab State Power Corporation Limited |
28.03.2013 | |
63. |
72/2012 |
Wahid Sandhar Sugars Limited |
Petition under Section 61 and 86 of Electricity Act, 2003 for determination/grant of generic/preferential tariff and directing Respondent No.1 for purchase of surplus power upto 7 MW from petitioner’s 12 MW Co-Generation Power Plant at Phagwara, District Kapurthala on long term basis at tariff so determined as per CERC RE Regulations duly adopted by PSERC in order to promote co-generation and generation of electricity from renewable sources of energy as envisaged under Electricity Act, 2003, National Electricity Policy, Tariff Policy and NRSE Policy of GoP. |
28.02.2013 | |
64. |
73/2012 |
Punjab State Transmission Corporation Limited |
Regulation 22 of the Punjab State Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) Regulations, 2005 as amended by Punjab State Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff), second amendment Regulations, 2012 notified vide Notification dated 17th September, 2012 |
18.03.2013 | |
65. |
74/2012 |
Punjab State Power Corporation Limited |
Petition for power procurement plan on short term basis for the year 2013-14 under Section 86 (1) b of Central Electricity Regulatory Commission, 2012 and Section 9 of Public notice issued by Punjab State Electricity Regulatory Commission on dated 23.10.2012. |
17.01.2013 | |
66. |
75/2012 |
Shri Surinder Kumar Joshi |
Petition in the matter of undue and illegal demand of Rs.34,49,250/- in respect of a connection which was never released; and refusal of authorities to hear the case – violation of Reg. 6.1 and 9.1.1 of E S code 2007. |
22.02.2013 |