List of Commission's Orders / Judgments passed in various cases.





Sr.No. Petition No. Filed By Subject Matter Date of Final Decision
01 Petition No. 01 of 2021 Talwandi Sabo Power Ltd Petition under Sections 86(1)(a), 86(1)(b) and 86(1)(f) of the Electricity Act, 2003 and Article 13 read with Article 17.3.1 of the Power Purchase Agreement executed by the petitioner and Punjab State Power Corporation Limited (PSPCL) (erstwhile Punjab State Electricity Board (PSEB) dated 01.09.2008 seeking relief on account of a ‘Change in Law’ viz. the introduction of Goods and Services Tax Laws at the Central and State levels, resulting additional recurring and non-recurring expenditure in the form of an additional tax burden on the petitioner thereby changing its economic position. 13.10.2021
 
02 Review Petition No. 01 of 2021 In Petition No. 28 of 2019 Punjab State Power Corporation Limited Review of the Order dated 01.02.2021 passed by the Commission in the petition filed by Punjab State Power Corporation Limited seeking approval for the PPAs and Procurement process related to the conventional generating (Thermal/Gas) Stations. 06.09.2021
 
03 Review Petition No. 02 of 2021 in Petition No. 41 of 2020 M/s Indian Sucrose Ltd. Review application under Section 94(f) of the Electricity Act, 2003 read with Rules 64 & 69 of the Punjab State Electricity Regulatory Commission (Conduct of Business) Regulations, 2005 for reviewing/recalling the Order of the Commission dated 12.04.2021 passed in Petition No. 41 of 2020 titled as M/s Indian Sucrose Ltd. Vs Punjab State Power Corporation Ltd. & another and to allow petition No. 41 of 2020. 02.11.2021

22.08.2023
 
04 Review Petition No. 03 of 2021 In Petition No.44 of 2020 Punjab State Transmission Corporation Limited Review Petition under Section 94 (1) (f) of The Electricity Act, 2003 read with Order 47 Rule 1 ofthe code of Civil Procedure, 1908 and read with Regulation 64 of The Punjab State Electricity Regulatory Commission (Conduct of Business) Regulations, 2005for the review of the Order dated28.05.2021passed in Petition no.44 of 2020. 10.12.2021
 
05 Review Petition No. 04 of 2021 in Pt No. 09 of 2017 M/s A.K. Concast Pvt. Ltd Review Petition/Application under Section 94 (1) (f) of the Electricity Act, 2003 read with Regulation 64 (Chapter XIII) of PSERC (Conduct of Business) Regulations and other provisions for Reviewing the Order dated 12.07.2021 rendered by the Commission in Petition No. 09 of 2017 17.03.2022
 
06 Review Petition No. 05 of 2021 in Pt No. 45 of 2020 Punjab State Power Corporation Limited Review Petition under Section 94 (1) (f) of The Electricity Act, 2003 read with Order 47 Rule 1 of the code of Civil Procedure, 1908 and read with Regulation 64 of The Punjab State Electricity Regulatory Commission (Conduct of Business) Regulations, 2005 for the review of the Order dated 28.05.2021 passed in Petition no.45 of 2020. 25.08.2022
 
07 Review Petition No. 06 of 2021 in Pt No. 17 of 2020 M/s Sampurn Agri Ventures Pvt. Ltd. Application under Section 94 (f) read with Section 86(1) of the Electricity Act for reviewing order dated 16.12.2020 passed by the Commission in the captioned matter by recalling the same to the extent of clerically error, which has apparently occurred in column No. 05 at page 18 with regard to calculation made for tariff applicable to the applicant for purchase of power from the applicant. 23.08.2022
 
08 Petition No. 03 of 2021 and IA No. 01 of 2021 M/s Globus Projects Pvt. Ltd Petition under Regulation 45, 46 and 47of the Supply Code 2014 and Regulation 6 of the Punjab State Electricity Regulatory Commission (Single Point Supply to Co-operative Group Housing Societies/Employers) Regulations and other relevant rules and regulations as approved by Hon’ble Commission including 68, 69, 70, 71 and 72 and other relevant provisions of Chapter XIII of the Conduct of Business Regulations 2005 as amended up to date and the provisions of the Electricity Act, 2003 for Setting aside the communication bearing Memo No. 3266 dated 06.11.2020 issued by the Respondent-PSPCL, whereby, the Respondent has wrongly sought to deposit a sum of Rs. 1,80,01,302/- from the Petitioner on account of single point rebate to the tune of Rs. 1,74,37,673/- and voltage surcharge to the tune of Rs.5,63,629/- and communication dated 04.01.2021 issued by PSPCL, whereby, now the same has been revised to the tune of Rs. 1,66,92,731/- in toto including single point rebate and voltage surcharge. 11.02.2021
 
09 Petition No. 04 of 2021 and IA No. 02 of 2021 M/s Globus Projects Pvt. Ltd Petition under Regulation 45,46 and 47of the Supply Code 2014 and Regulation 6 of the Punjab State Electricity Regulatory Commission (Single Point Supply to Co-operative Group Housing Societies/Employers) Regulations and other relevant rules and regulations as approved by Hon’ble Commission including 68, 69, 70, 71 and 72 and other relevant provisions of Chapter XIII of the Conduct of Business Regulations 2005 as amended up to date and the provisions of the Electricity Act, 2003 for Setting aside the communication bearing Memo No. 3265 dated 06.11.2020 issued by the Respondent-PSPCL, whereby, the Respondent has wrongly sought to deposit a sum of Rs. 44,16,349/- from the Petitioner on account of single point rebate to the tune of Rs. 38,24,389/- and voltage surcharge to the tune of Rs.5,91,960/- and consequential communication bearing memo No. 24 dated 04.01.2021, whereby the demand of Rs. 44,16,349/- has been revised to Rs. 42,05,126/-. 11.02.2021
 
10 Petition No. 05 of 2021 and IA No. 03 of 2021 M/s Globus Projects Pvt. Ltd Petition under Regulation 45, 46 and 47of the Supply Code 2014 and Regulation 6 of the Punjab State Electricity Regulatory Commission (Single Point Supply to Co-operative Group Housing Societies/Employers) Regulations and other relevant rules and regulations as approved by Hon’ble Commission including 68, 69, 70, 71 and 72 and other relevant provisions of Chapter XIII of the Conduct of Business Regulations 2005 as amended up to date and the provisions of the Electricity Act, 2003 for Setting aside the communication bearing Memo No. 4282 dated 06.11.2020 issued by the Respondent-PSPCL, whereby, the Respondent has wrongly sought to deposit a sum of Rs. 89,59,130/- from the Petitioner on account of single point rebate and consequential communication dated 04.01.2021, whereby, the above said demand has been increased by PSPCL to the tune of Rs.92,98,757/-. 11.02.2021
 
11 IA No. 05 of 2021 in Petition No. 04 of 2020 Punjab State Power Corporation Ltd. Approval for the Power Purchase Agreements (PPAs) and procurement process of Punjab State Power Corporation Limited related to the procurement of power from the Hydro and Nuclear generating stations. 24.08.2021
 
12 IA No. 10 of 2021 in Petition No. 03 of 2021 M/s Globus Projects Pvt. Ltd Application under regulation 68, 69, 71, 72 and 73 and other relevant provisions of Chapter XIII of the Conduct of Business Regulations 2005 as amended up to date and the provisions of the Electricity Act, 2003 for urgent listing and to extend the period of interim protection rendered by this Hon’ble Commission in terms of ibid order dated 11.02.2021 for a period of 45 days from the date of the order, till the application seeking interim relief is decided by the Sole Arbitrator to be appointed by the parties or /and any further period as deemed fit by this Hon’ble Commission beyond 45 days rendered by this Hon’ble Commission vide order dated 11.02.2021, whereby, the parties were directed to proceed as per clause 19 of the franchisee agreement and report compliance within 45 days of the date of issue of the order and in order to meet the ends of justice, PSPCL had been directed not to take any punitive action against the Petitioner on account of impugned demand raised by PSPCL, for a period of 45 days granted to the parties to submit compliance of this order. 05.05.2021
 
13 IA No. 11 of 2021 in Petition No. 04 of 2021 M/s Globus Projects Pvt. Ltd Application under regulation 68, 69, 71, 72 and 73 and other relevant provisions of Chapter XIII of the Conduct of Business Regulations 2005 as amended up to date and the provisions of the Electricity Act, 2003 for urgent listing and to extend the period of interim protection rendered by this Hon’ble Commission in terms of ibid order dated 11.02.2021 for a period of 45 days from the date of the order, till the application seeking interim relief is decided by the Sole Arbitrator to be appointed by the parties or /and any further period as deemed fit by this Hon’ble Commission beyond 45 days rendered by this Hon’ble Commission vide order dated 11.02.2021, whereby, the parties were directed to proceed as per clause 19 of the franchisee agreement and report compliance within 45 days of the date of issue of the order and in order to meet the ends of justice, PSPCL had been directed not to take any punitive action against the Petitioner on account of impugned demand raised by PSPCL, for a period of 45 days granted to the parties to submit compliance of this order. 07.05.2021
 
14 IA No. 12 of 2021 in Petition No. 05 of 2021 M/s Globus Projects Pvt. Ltd Application under regulation 68, 69, 71, 72 and 73 and other relevant provisions of Chapter XIII of the Conduct of Business Regulations 2005 as amended up to date and the provisions of the Electricity Act, 2003 for urgent listing and to extend the period of interim protection rendered by this Hon’ble Commission in terms of ibid order dated 11.02.2021 for a period of 45 days from the date of the order, till the application seeking interim relief is decided by the Sole Arbitrator to be appointed by the parties or /and any further period as deemed fit by this Hon’ble Commission beyond 45 days rendered by this Hon’ble Commission vide order dated 11.02.2021, whereby, the parties were directed to proceed as per clause 19 of the franchisee agreement and report compliance within 45 days of the date of issue of the order and in order to meet the ends of justice, PSPCL had been directed not to take any punitive action against the Petitioner on account of impugned demand raised by PSPCL, for a period of 45 days granted to the parties to submit compliance of this order. 07.05.2021
 
15 IA No. 13 of 2021 in Petition No. 31 of 2014 Talwandi Sabo Power Limited Interlocutory Application (IA) in petition No. 31 of 2014, seeking implementation of the directions of the Commission in the Order dated 06.05.2019 in petition No. 31 of 2014. 11.03.2022

click here for Annexure
 
16 IA No. 18 of 2021 in Petition No. 33 of 2019 Punjab Alkalies & Chemicals Limited Application under Regulation 64, 69, 73 under Chapter XII of the PSERC (Conduct of Business) Regulations, 2005 and other applicable Regulations issued by the Commission and provisions of the Electricity Act, 2003 seeking extension in time for compliance of the Judgment/Order dated 17.03.2020 and consequential order dated 23.10.2020, whereby the petitioner was directed to comply the shortfall in its RPO by extended period up till 30.09.2021 by purchasing RECs. 22.11.2021
 
17 IA No. 21 of 2021 in Petition No. 11 of 2021 Punjab State Power Corporation Ltd. Interlocutory Application under Regulation 64,69,73 of the Punjab State Electricity Regulatory Commission (Conduct of Business) Regulations, 2005 (hereinafter referred to as ‘Regulations 2005) for extension in validity period of demand notices of all categories of consumers (except AP) and relaxation of provisions of Regulation 6.8.7 (a) of the Supply Code 2014. 24.01.2022
 
18 Petition No. 02 of 2021 Punjab State Power Corporation Limited Petition under Section 86(1)(b) of the Electricity Act, 2003, seeking approval of Amendment No. 3 dated 25.08.2015 to the PPAs dated 01.01.2014 with M/s Bhanuenergy Infrastructure Power Limited and M/s Bhanuenergy Industrial Development Limited. 19.07.2021
 
19 Petition No. 06 of 2021 M/s Didar Steel Petition Under Regulation 45, 46 and 47.2 of PSERC (Electricity Supply code and Related Matters) Regulations, 2014 read with Regulation 69 and 73 of PSERC (Conduct of Business) Regulations 2005 and other related/relevant regulations issued by this Commission for providing relief to the Petitioner to grant extension in the time period for completion of formalities in compliance to feasibility clearance letter beyond 60 days for release of a new connection. 04.03.2021
 
20 Petition No. 07 of 2021 Punjab State Power Corporation Ltd Petition Under Regulation 6.7 & 47 of Supply Code-2014 and Regulation 69, 70, 71 & 72 of Chapter XIII of the Conduct of Business Regulations 2005 regarding erection of LD system by PSPCL and release of electricity connections in those licensed colonies where the developers sold plots/flats without obtaining NOC from PSPCL OR where the developers after obtaining NOC have abandoned the project without installing the LD system and other related matters. 25.07.2023
 
21 Petition No. 08 of 2021 Punjab State Power Corporation Limited Petition under section 23 of the Electricity Act, 2003 for authorizing the PSPCL to impose Power Cuts and other Power Regulatory Measures for the year 2021-22. 31.03.2021
 
22 Petition No. 09 of 2021 Punjab State Power Corporation Ltd Petition under Regulation 47 of Supply Code-2014 and Regulation 69, 70, 71 & 72 of chapter XIII of the Conduct of Business Regulations 2005 for introduction of One Time Settlement Scheme for all categories of defaulting consumers (except AP). 09.04.2021
 
23 Petition No. 10 of 2021 Punjab State Power Corporation Ltd Petition for the approval of the work of installation of Roof top Solar Plant on roofs of control rooms of various 400/220/132 KV Sub stations of PSTCL and SLDC building as Capital Work in the MYT Control Period FY 2020-21 to FY 2022-23 under Section 62 and 64 of the Electricity Act, read with Regulation-9 of the PSERC (Terms and Conditions for Determination of Generation, Transmission, wheeling and Retail Supply Tariff) Regulations. 22.06.2021
 
24 Petition No. 11 of 2021 Punjab State Power Corporation Ltd Petition for extension in validity period of demand notices of all categories of consumers (except AP) in the state of Punjab in public interest due to impact of Covid-19 pandemic under Regulation 47 of Supply Code-2014 and Regulations 69,70,71 & 72 of Chapter XIII of the PSERC (Conduct of Business) Regulations 2005. 22.04.2021
 
25 Petition No. 12 of 2021 M/s PepsiCo India Holdings Private Limited Petition by PepsiCo India Holdings Private Limited under Section 86(1)(e) of the Electricity Act, 2003 read with Regulation 6(2) and Regulation 7 of the PSERC (Renewable Purchase Obligation and its Compliance) Regulations, 2011, seeking carry forward of shortfall of Renewable Purchase Obligation (RPO) for FY 2015-16 and FY 2016-17 to FY 2020-21 or any other earliest possible opportunity. 04.06.2021
 
26 Petition No. 13 of 2021 Ranjit Kaur & Ors Petition under section 43 of the Electricity Act, 2003 read with Regulation 5.1 of the Supply Code, 2014 and other relevant rules and regulations as approved by the Commission including 68,69,70,71 and 72 and other relevant provisions of Chapter XIII of the Conduct of Business Regulations 2005 as amended up to date and the provisions of the Electricity Act, 2003 for directing the Respondents to render respective Domestic Supply Electricity connection to the Petitioners for their residential houses in the colony-Sunny Enclave. 12.09.2022
 
27 Petition No. 14 of 2021 Indian Railways Through Petition under Section 86(1)(c) of the Electricity Act, 2003 read with Section 39 of the Electricity Act, 2003 and Regulations 15, 21, 27, 27A and 45 of the Punjab State Electricity Regulatory Commission (Terms and Conditions for Intra-state Open Access) Regulations, 2011 and Regulation 10 of the Punjab State Electricity Regulatory Commission (Conduct of Business) Regulations, 2005 for issuance of appropriate directions to the Respondents as regards (1) liability of Indian Railways to pay Demand Surcharge for overdrawl of power when power under Standby Agreement not scheduled (2) liability of Indian Railways to pay Additional Surcharge on the power being sourced through Open Access (3) Addition of new Traction Substation in the existing Long Term Access and (4) issuance of ‘No-Objection Certificate’ for Short Term Access to Indian Railways. 22.03.2022
 
28 Petition No. 15 of 2021 Punjab State Power Corporation Limited Petition for approval of Fuel Cost Adjustment (FCA) Surcharge for 3rd Quarter of FY 2020-21. 09.06.2021
 
29 Petition No. 16 of 2021 M/s G.O. Steel Pvt. Ltd Petition under Section 142 and 146 of the Electricity Act, 2003 for taking necessary action against the respondents for violating the provisions of Regulation 6.3, 9.1.3 and 9.2 of the Punjab State Electricity Regulatory Commission (Electricity Supply Code and Related Matters) Regulations, 2014 (hereinafter to be called Supply Code-2014) and further for seeking directions to the PSPCL to comply with the clause 9.1.3 and 9.2 of the supply code-2014 and release the extended load of the petitioner through idle circuit of Double Circuit 66 kV line already existing near the factory of the petitioner, and further in case the load cannot be released from this line then to recover charges as per clause 9.1.3 (iii) of the Supply Code- 2014 only, in the interest of justice. 16.07.2021
 
30 Petition No. 17 of 2021 Punjab State Power Corporation Limited Petition filed under regulation 3.5 and 47 of Supply Code 2014 and Regulation 69, 70, 71 and 72 of Chapter- XIII of the (Conduct of Business) Regulations, 2005 for temporary amendment in the procedure for over hauling of consumer accounts provided in the Regulation 21.5.2 of Supply code - 2014 for the FY 2021-22 only due to impact of Covid -19 pandemic. 22.04.2021
 
31 Petition No. 18 of 2021 Punjab State Power Corporation Ltd Petition under Section 86 (1) (b) of the Electricity Act, 2003 seeking approval of procurement of 300 MW Solar Power on long term basis under the Power Sale Agreement dated 15.10.2020 entered into between Punjab State Power Corporation Ltd. and NHPC Ltd. 28.04.2022
 
32 Petition No. 19 of 2021 Punjab State Power Corporation Limited Petition for the Determination of Additional Surcharge U/S 42 (4) of the Indian Electricity Act-2003 read with Regulation 27 of Punjab State Electricity Regulatory Commission (Terms and Conditions for Intra-State Open Access) Regulations, 2011 to be made applicable on to the open access consumers availing power from the sources other than PSPCL for the period 01.04.2021 to 30.09.2021. 03.05.2021
 
33 Petition No. 20 of 2021 alongwith IA No. 09 of 2021 Mohan Dai Oswal Cancer Treatment and Research Foundation Petition under section 94 and other relevant provisions of the Electricity Act, 2003 read with condition No. 24 of the General Conditions of Tariff contained in tariff order for the year 2020-21 and similar condition(s) in the tariff orders for the year 2019-20 passed by the Commission and other relevant rules and regulations as approved by the Commission including 64,68,69,70,71 and 72 and other relevant provisions of Chapter XIII of the Conduct of Business Regulations 2005 as amended up to date for Clarifying/ Interpreting the provisions of the tariff orders for the year 2019-20 and 2020-21 to the effect that 25% increased energy charges shall not be levied upon all Govt. hospitals and hospitals run by charitable institutions covered under Section 80-G of Income Tax Act, 1961 and to levy the same only upon the private hospitals and MRI/CT scans centers getting continuous supply through independent feeders under BS Schedule, as already exempted in the tariff order for the year 2018-19 AND Carry out the necessary amendment(s) to the effect. 22.03.2022
 
34 Petition No. 21 of 2021 Solar Power Developers Association Petition under Section 86 (1) (b),86 (1) (c),86 (1) (e), Section 86 (1) (k) and 86 (4) of the Electricity Act, 2003 read with Regulation 9(1) and Regulation 69, Regulation 72, Regulation 74 of the Punjab state Electricity Regulatory Commission (Conduct of Business) Regulations, 2005 seeking issuance of appropriate direction(s)/ order(s) against the Respondent for illegal deduction of lawful tariff payment due and payable to solar power developers. 24.09.2021
 
35 Petition No. 22 of 2021 Punjab State Power Corporation Ltd Petition for the approval of Hon’ble PSERC under Clause-21.2.7 of Electricity Supply Code and Related Matters Regulations 2014 (hereinafter referred as Supply Code), as amended from time to time regarding various matters concerning 3 phase whole current smart meteres. 22.11.2021
 
36 Petition No. 23 of 2021 Ambuja Cements Limited Petition under regulation 7, 9 & 10 of PSERC (RPO and its compliance) Regulations 2011, for consideration of proportion of power generated at Captive Power Plant of ACL Ropar Unit by co-firing of biomass in boilers as Non-Solar renewable power and exemption from RPO under the PSERC (RPO and its compliance) Regulations, 2011 and CERC (Suo-Motu) Petition No. 12/SM/2019, Order dated 18.02.2020. 24.09.2021
 
37 Petition No. 24 of 2021 Kuantum Papers Limited Petition under Regulation 68 to 72 of Chapter XIII and other relevant provisions of the Conduct of Business Regulations, 2005 as amended up to date and Regulation 7 to 10 of PSERC (RPO and its compliance) Regulations, 2011 as amended up to date and other relevant rules and regulations as approved by the Commission for granting exemption from the renewable purchase obligation (RPO) to the petitioner with regard to the power generated and consumed by the petitioner using coal as fuel from its dual fuel based fully captive-cum-co-generation power plants set up by the petitioner at its paper mill at Hoshiarpur, in terms of the judgment dated 09.04.2019 passed by Hon’ble APTEL. 28.09.2021
 
38 Petition No. 25 of 2021 Khanna Paper Mills Ltd Petition under Regulation 68 to 72 of Chapter XIII and other relevant provisions of the PSERC (Conduct of Business) Regulations, 2005 as amended up to date and Regulation 7 to 10 of PSERC (RPO and its compliance) Regulations, 2011 as amended up to date and other relevant rules and regulations as approved by the Commission for granting exemption from the renewable purchase obligation (RPO) to the petitioner with regard to the power generated and consumed by the petitioner from conventional fuel based fully captive-cum-co-generation power plant(s) set up by the petitioner at its paper mill at Amritsar, in terms of the judgment dated 09.04.2019 passed by Hon’ble APTEL. 28.09.2021
 
39 Petition No. 26 of 2021 Punjab State Power Corporation Limited Petition under Section 63 read with Section 86 of the Electricity Act, 2003 and Clause 3.1.1 (c) and 18 of the Guidelines for Tariff Based Competitive Bidding Process notified by Ministry of Power on 03.08.2017 for Procurement of Power from Grid Connected Solar PV Power Projects - for approval of deviations from the said Guidelines. 22.07.2021
 
40 Petition No. 27 of 2021 Confederation of Real Estate Developers Association of India Petition under Regulation 3.5,4.2,6.6.2,6.7,9.7,44,45 and 47 of the Supply Code 2014 notified by the Commission and other relevant rules and regulations as approved by Commission including 68,69,70,71 and 72 and other relevant provisions of Chapter XIII of the Conduct of Business Regulations 2005 as amended up to date for amendment in Regulation 4.2,6.6.2,6.7,9.1 of the Supply Code and directing respondent PSPCL to bring uniformity in practices. 12.05.2022
 
41 Petition No. 28 of 2021 Punjab State Power Corporation Ltd. Petition under Section 86 (1) (b) of the Electricity Act, 2003 seeking permission to relinquish allocated power from Anta, Auraiya & Dadri Generating Stations of the respondent in terms of letter/office Order dated 22.03.2021 issued by the Government of India, Ministry of Power. 05.08.2021
 
42 Petition No. 29 of 2021 GVK Power (Goindwal Sahib) Limited Petition for True-Up for FY 2019-20, Annual Performance Review for FY 2020-21 and Tariff Determination for FY 2021-22 of 2X270 MW Goindwal Sahib Thermal Power Plant at Goindwal Sahib, Punjab in terms Punjab State Electricity Regulatory Commission (Terms and Conditions for Determination of Generation, Transmission, Wheeling and Retail Supply Tariff) Regulations, 2014 (PSERC MYT Regulations 2014) and 2019 (PSERC MYT Regulations 2019). 23.08.2022
 
43 Petition No. 30 of 2021 Talwandi Sabo Power Limited Petition under Section 86 of the Electricity Act, 2003 read with Article 17 of the Power Purchase Agreement dated 01.09.2018 entered into between the Petitioner and Punjab State Power Corporation Limited, erstwhile Punjab State Electricity Board (PSEB)) seeking issuance of correct Energy Accounts by Punjab State Load Despatch Centre (SLDC) as per its declared availability and payment of Capacity charges by PSPCL. 17.09.2021
 
44 Petition No. 31 of 2021 Punjab State Power Corporation Limited Petition under Section 63 read with Section 86 of the Electricity Act, 2003 and Clause 3.1.1 (c) and 18 of the Guidelines for Tariff Based Competitive Bidding Process notified by Ministry of Power on 03.08.2017 for Procurement of Power from Grid Connected Solar PV Power Projects for approval of Draft RFS and PPA along with deviations from the said Guidelines. 22.07.2021
 
45 Petition No. 32 of 2021 Harminder Singh, resident of HM Crystal Hotel Petition/Complaint against the Punjab State Power Corporation Limited, S.A.S Nagar for not made compliance of the Order dated 10.12.2020 passed by the PSPCL forum for redressal of grievances of consumers, Patiala, till date in case No. CGP-370 of 2020 and overcharging the bills during the period of "D" code till the matter was not replaced. 18.06.2021
 
46 Petition No. 33 of 2021 Punjab State Power Corporation Limited Petition for approval of Fuel Cost Adjustment (FCA) Surcharge for 4th Quarter (January, 2021 to March, 2021) of FY 2020-21. 20.09.2021
 
47 Petition No. 34 of 2021 Suo Motu Staff Paper for determination of levellised generic tariff for various Renewable Energy Technologies/Projects in the State for FY 2021-22. 19.01.2023
 
48 Petition No. 35 of 2021 Suo-Motu Amendment in the Punjab State Electricity Regulatory Commission (Renewable Purchase Obligation and its compliance) Regulations, 2011 for specification of HPO trajectory (Suo-Motu). 30.07.2021
 
49 Petition No. 36 of 2021 Punjab State Power Corporation Ltd Petition under clause 86 (1) (e) and 94 (1) (f) of EA 2003 & clause 3(2), 6(2) & 7 of the PSERC (RPO & its compliance) Regulations, 2011 issued vide Notification No. PSERC/Secy./Reg/55 dated 03.06.2011 for carrying forward of surplus Renewable Purchase Obligation (RPO) of FY 2020-21 to FY 2021-22 and to reduce the RPO targets specified in Clause 3 (1) for Non-Solar and Solar Power for FY 2021-22 by 0.3% and 1.5% respectively on account of unprecedented conditions due to the spread of second wave of COVID-19. 13.10.2021
 
50 Petition No. 37 of 2021 Nawanshahar Power Pvt. Limited Petition under Regulations 9 and 10 of the PSERC (Harnessing of Captive Power Generation) Regulations 2009 and other relevant rules and regulations as approved by the Commission including Regulations 68,69,70,71 and 72 and other relevant provisions of Chapter XIII of the Conduct of Business Regulations 2005 as amended up to date and the provisions of the Electricity Act, 2003 for Setting aside the communication bearing memo no. 340 dated 10.03.2021, consequential Communication dated 23.03.2021 issued by the Respondent-PSPCL, whereby, the Respondent has wrongly charged Rs. 1,68,45,000/- on account of alleged demand surcharge and Rs. 5.42,096/- towards interest charges upon the Petitioner and the subsequent communications dated 25.03.2021, 01.04.2021 and for directing PSPCL to pay/refund the amounts of impugned demands. 04.05.2022
 
51 Petition No. 38 of 2021 Suo Motu Regarding extension of due date for bill payment from 01.04.2021 to 03.04.2021 in view of Bank Holiday in reference to Regulation 31.3 of the Punjab State Electricity Regulatory Commission (Electricity Supply Code & Related Matters) Regulations, 2014 28.06.2021
 
52 Petition No. 42 of 2021 Punjab State Power Corporation Limited Petition under Section 86 (1) (b) of the Electricity Act, 2003 seeking approval for procurement on long term basis of 30 MW Solar Power under the Power Sale Agreement dated 31.03.2015 and 150 MW & 200 MW Wind Power under the Power Sale Agreements dated 24.11.2017 and 23.03.2018. 15.03.2022
 
53 Petition No. 43 of 2021 Everest Power Private Ltd. Petition for adjudication of disputes arising from illegal recovery made by PSPCL for alleged shortfall in energy generation under Section 86(1) (f) of Electricity Act, 2003. 02.08.2023
 
54 Petition No. 44 of 2021 Punjab State Power Corporation Ltd Petition under Section 86 (1) (B) of the Electricity Act 2003 seeking Approval for allocation of additional budget for CAPEX Plan for Annual Plan FY 2021-22 for the work executed/under execution under various schemes of CE/RE & APDRP. 07.09.2021
 
55 Petition No. 45 of 2021 Punjab State Power Corporation Ltd Petition for addition of the work of construction of stone/boulder masonry, parapet wall on cement concrete lining, from RD 33310M to 35500M on both banks of Mukerian Hydel Channel Stage-1 for which Agenda No. 380 dated 23.02.2021 has been approved by BODS in its 86th meeting held at Mohali on 26.02.2021 for CAPEX Plan 2021-22. 10.09.2021
 
56 Petition No. 46 of 2021 alongwith IA No 17 of 2021 M/s Kanhiya Real Estate Petition under Regulation 5, 6, 44, 45, 46 and 47 of the Supply Code 2014 and other relevant rules and regulations as approved by the Commission including 68, 69, 70, 71 and 72 and other relevant provisions of Chapter XIII of the Conduct of Business Regulations 2005 as amended up to date and the provisions of the Electricity Act, 2003 for setting aside the impugned action of Respondent PSPCL, whereby the Respondent PSPCL has wrongly clubbed the electricity load of all the four projects separately setup by the petitioner, disregarding the distinctiveness of each project. 22.03.2022
 
57 Petition No. 47 of 2021 Mr. Sanjeev Thakur Petition under section 43 of the Electricity Act, 2003 read with Regulation 5.1 of the Supply Code, 2014 and other relevant rules and regulations as approved by the Commission including 68,69,70,71 and 72 and other relevant provisions of Chapter XIII of the Conduct of Business Regulations 2005 as amended up to date and the provisions of the Electricity Act, 2003 for directing the Respondents to render respective permanent Domestic Supply Electricity connection to the Petitioners for their residential houses in the colony. 26.08.2022
 
58 Petition No. 48 of 2021 Punjab State Power Corporation Limited Petition under Section 86 (1) (b) of the Electricity Act 2003, for approval of Procurement of 100 MW (approx. 67% Wind Power & 33% Solar Power) Round the Clock (RTC) RE Power for 25 Years from M/s Renew Surya Roshni Pvt. Ltd., New Delhi through Intermediary Traders M/s Solar Energy Corporation of India and Procurement 197 MUs of excess Wind Energy from June to September every year for the term of 25 years directly from M/s Renew Surya Roshni Pvt. Ltd. New Delhi. 02.11.2021
 
59 Petition No. 49 of 2021 Punjab State Power Corporation Limited Petition under Section 86(1)(f) of the Electricity Act, 2003 seeking adjudication of disputes between the petitioner and the Respondent in relation to the computation of the Energy Charges claimed by the Respondent. 25.10.2023
 
60 Petition No. 50 of 2021 Punjab State Power Corporation Limited Petition under Section 86(1)(f) of the Electricity Act, 2003 seeking adjudication of disputes between TSPL and PSPCL in relation to the computation of the Energy Charges claimed by the TSPL. 25.10.2023
 
61 Petition No. 51 of 2021 Punjab State Transmission Corporation Limited Petition for the inclusion of 220KV/132KV Sub-station of GNDTP Bathinda transferred from PSPCL to PSTCL as a Capital Work in the MYT Control Period FY 2020-21 to FY 2022-23 under Regulation-9 of PSERC (Terms and Conditions for Determination of Generation, Transmission, Wheeling and Retail Supply Tariff) Regulations, 2019. 13.12.2021
 
62 Petition No. 52 of 2021 Suo Motu PR circular No. 09/2021 dated 05.07.2021 and PR Circular No. 11/2021 dated 07.07.2021 regarding Power Regulatory Measures on Industrial Consumers (except Essential Industries/Services & other exempted categories) from 08.07.2021 to 11.07.2021 in all DS Zones. 21.01.2022
 
63 Petition No. 53 of 2021 KRBL Limited Petition under Regulation 8 and 9 of PSERC (Harnessing of Captive Power Generation) Regulations 2009 and other relevant rules and regulations as approved by the Commission including Regulations 68,69,70,71 and 72 and other relevant provisions of Chapter XIII of the Conduct of Business Regulations 2005 as amended up to date and the provisions of the Electricity Act, 2003 for directing PSPCL to allow/grant banking facility to the Petitioner for its CPP being operated with renewable biomass fuel. 04.05.2022
 
64 Petition No. 54 of 2021 Punjab State Power Corporation Limited Petition under Section 86 (1) (b) of the Electricity Act, 2003 read with Rule 8 of the Electricity Rules, 2005 and the Punjab State Electricity Regulatory Commission (Power Purchase and Procurement Process of Licensee) Regulations, 2012, Regulation 45 of the Punjab State Electricity Regulatory Commission (Conduct of Business) Regulations, 2005 and other Applicable provisions for approval of the Power Procurement from the Vishnugad Pipalkoti Hydro Electric Power Plant of Tehri Hydro Development Corporation Limited and Subansiri Lower the project of NHPC Limited. 03.01.2022
 
65 Petition No. 55 of 2021 Punjab State Power Corporation Limited Petition for the Determination of Additional Surcharge U/S 42 (4) of the Electricity Act-2003 read with Regulation 27 of Punjab State Electricity Regulatory Commission (Terms and Conditions for Intra-State Open Access) Regulations, 2011 to be made applicable on to the open access consumers availing power from the sources other than PSPCL for the period 01.10.2021 to 31.03.2022. 13.12.2021
 
66 Petition No. 56 of 2021 Suo Motu Regarding increase in time limit (minimum 30 days) for payment of electricity bills being raised for Rural Water Supply (RWS) schemes by Punjab State Power Corporation Limited. 20.01.2022
 
67 Petition No. 57 of 2021 Bhanuenergy Infrastructure Power Limited Petition under section 86 (1) (f) and other relevant provisions of the Electricity Act, 2003 read with the provisions of the Power Purchase Agreements dated 01.01.2014 challenging the legality, validity and propriety of letters/memos dated 25.08.2021 & 15.09.2021 issued by PSPCL to terminate the Power Purchase Agreements dated 01.01.2014. 08.09.2022
 
68 Petition No. 58 of 2021 Punjab State Transmission Corporation Limited Petition for amendment in PSERC (Terms and conditions for Intra-State Open Access) Regulations, 2011, for allowing petitioner to charge transmission charges & SLDC operating charges for the actual maximum drawl of Northern Railway in excess of open access capacity and to approve the detailed procedure of STU for grant of connectivity to open access applicants at 132 KV & above. 18.01.2023
 
69 Petition No. 59 of 2021 M/s R.P Concast Petition under Regulations 3.5 and 47 read with 44,45,46 of PSERC (Electricity Supply Code and Related Matters), Regulations, 2014 read with Regulation 69 of the Punjab State Electricity Regulatory Commission (Conduct of Business) Regulations 2005, for seeking amendment/interpretation/clarification regarding Clause 4.3 of the Supply Code, 2014 to the effect whether the consumers can have connection for Cluster Sub Stations from existing 66 kV Supply Lines instead of from independent line from Feeding Sub Station and further to the effect that the consumers getting connections for Cluster Sub Station from existing 66 kV supply lines are liable to pay proportionate Cost of 66 kV line. 02.03.2022
 
70 Petition No. 60 of 2021 Sh. Ankush Anand Petition for Determination of tariff in accordance with the provisions of the Act for (a) Supply of electricity by a generating company to a distribution licensee; Provided that the Appropriate Commission may, in case of shortage of supply of electricity, fix the minimum and maximum ceiling of tariff for sale or purchase of electricity in pursuance of an agreement, entered into between a generating company and a licensee or between licensees, for a period not exceeding one year to ensure reasonable prices of electricity (b)...etc. 14.01.2022
 
71 Petition No. 61 of 2021 Suo-Motu Regarding non-compliance of the Order dated 09.04.2021 passed by the Commission in petition No. 49 of 2020 and non-implementation of the provisions of Regulations 16.4 and 16.5 of Supply Code, 2014 regarding review of security (consumption) 10.11.2022
 
72 Petition No. 63 of 2021 Punjab State Transmission Corporation Limited Petition for the approval of revised scope/cost of the works already approved in MYT 2020-23 and for the inclusion of New works of Urgent Nature as Capital works in the MYT Control Period FY 2020-21 to FY2022-23 under Regulation-9 of PSERC (Terms and Conditions for Determination of Generation, Transmission, Wheeling and Retail Supply Tariff) Regulations, 2019. 02.03.2022
 
73 Petition No. 64 of 2021 Nabha Power Limited Petition seeking direction to approve and take on record the Supplementary Agreement executed between PSPCL and NPL on 22.10.2021 amending the Power Purchase Agreement dated 18.01.2010 (PPA) signed between erstwhile Punjab State Electricity Board (now PSPCL) and NPL in terms of Article 18.1 thereof. 27.12.2021
 
74 Petition No. 65 of 2021 Mahaluxmi Steels Petition under Regulation 68,69,70,71 and 72 and other relevant provisions of Chapter XIII of the Conduct of Business Regulations 2005 as amended up to date, Regulations 44, 45 and 46 of Supply Code 2014 as amended up to date and other relevant provisions of the Electricity Act, 2003 for setting aside notice bearing No. 1573 dated 03.11.2021 raising a demand of Rs. 46,65,251/- issued by Respondent No. 4 to Petitioner No. 01 for seeking a demand of Rs. 46,65,251/- on account of difference of fixed charges as per Audit note being the Lead cluster member on the purported pretext of the separate CD of the cluster. 04.05.2022
 
75 Petition No. 66 of 2021 M/s International Hospital Ltd. Petition under Section 94 and other relevant provisions of the Electricity Act, 2003 read with condition No. 24 of the General Conditions of Tariff passed by this Commission and other relevant rules and Regulations as approved by the Commission including 64,68,69,70,71 and 72 and other relevant provisions of Chapter XIII of the Conduct of Business Regulations 2005 as amended up to date for clarifying/Interpreting the applicability of provisions of the tariff orders regarding charging 25% increase energy charges from the petitioner for the period 2010 onward. 06.10.2023
 
76 Petition No. 69 of 2021 Talwandi Sabo Power Limited Petition under Section 86 (1) (f) of the Electricity Act read with Article 17.3 of the PPA seeking directions to quash and set-aside the preliminary default notice dated 15.09.2021 issued by PSPCL alleging Seller’s event of default under Article 14.1(iv) of the PPA. 08.09.2022
 
77 Petition No. 70 of 2021 Punjab State Power Corporation Limited Petition under Regulation 7.1.1 of the Supply Code 2014 by PSPCL for seeking relaxation of Supply Code Regulation 7.1.1 from the Commission for release of New Connection of 200 MW/ 200 MVA permanent power at 400 kV supply voltage to HPCL Mittal Energy Ltd. Phullokari under the category Large Supply in sub-division Raman under Division Maur, (RID No. 18846). 11.03.2022
 
78 Petition No. 71 of 2021 Punjab State Power Corporation Ltd. Petition under Section 63, 86(1)(b&e) of the Electricity Act, 2003 read with PSERC (Power Purchase and Procurement process of Licensees) Regulations, 2012 and Regulation 46 of PSERC (Conduct of Business) Regulations, 2005 for adoption of tariff for 250 MW Solar Power from projects located anywhere in India and approval of power procurement in respect thereof. 24.01.2022
 
79 Petition No. 72 of 2021 M/s Salasar Hydro Urja Private Limited Petition under Regulation 68, 69, 70, 71, 72 and other relevant provisions of Chapter XIII of PSERC (Conduct of Business) Regulations 2005 and Section 62 read with Section 86(1)(e) of the Electricity Act 2003 for declaring the FY 2019-20 as the year of commissioning for the Mini Hydel Project commissioned by the petitioner and granting the tariff for the project for sale of electricity to PSPCL in terms thereof and the bidding process carried out by PEDA, where under a discount of Rs. 1.51/kWh was offered by the petitioner, thus arriving at the net tariff of Rs. 4.72/kWh (Rs. 6.23 - Rs. 1.51)/kWh. 25.08.2022
 
80 Petition No. 73 of 2021 Punjab State Power Corporation Ltd. Approval of the power procurement process of Punjab State Power Corporation Ltd. (PSPCL)in terms of the Amendment-2 dated 20.08.2021 to the Power Purchase Agreement (PPA) dated 31.01.2002 entered between Punjab Genco Ltd and PSPCL in respect of 1 MW High Rate Bio-Methanation Power Generation facility at Haibowal Dairy Complex, Ludhiana. 10.03.2022