List of Commission's Orders / Judgments passed in various cases.





Sr.No. Petition No. Filed By Subject Matter Date of Final Decision
1 Review Petition No. 01 of 2020 in Petition No.28 of 2018 Punjab State Power Corporation Limited Petition under Section 94 (1) (f) of the Electricity Act, 2003 read with Regulation 64 of the PSERC (Conduct of Business) Regulations, 2005 for review of the Order dated 04.12.2019 passed by the Commission in Petition No. 28 of 2018. 09.09.2020
 
2 Review Petition No. 02 of 2020 in Petition No.25 of 2019 Punjab State Power Corporation Limited Petition in regard to the inclusion of the amount payable by the Petitioner to Nabha Power Limited and Talwandi Sabo Power Limited under their respective Power Purchase Agreements as interpreted and implemented by the decision of the Hon’ble Supreme Court and appropriate direction for tariff to be recovered from the consumers. 23.07.2020
 
3 Review Petition No. 03 of 2020 in Petition No.29 of 2019 Punjab State Transmission Corporation Limited Review Petition under Section 94 (1) (f) of The ElectricityAct, 2003 read with Order 47 Rule 1 ofthe code of Civil Procedure, 1908 and read with Regulation 64 of The Punjab State Electricity Regulatory Commission (Conduct of Business) Regulations, 2005for the review of the Order dated 01.06.2020 passed in Petition no 29 of 2019. 15.10.2020
 
4 Review Petition No. 04 of 2020 in Petition No.69 of 2017 GVK Power (Goindwal Sahib) Limited Review Petition under Section 94 (1) (f) of The Electricity Act, 2003 read with Order 47 Rule 1 of the code of Civil Procedure, 1908 and read with Regulation 64 of The Punjab State Electricity Regulatory Commission (Conduct of Business) Regulations, 2005 for the review of the Order dated 05.08.2020 passed in Petition no 69 of 2017. 07.04.2021
 
5 Review Petition No. 05 of 2020 in Petition No.32 of 2019 GVK Power (Goindwal Sahib) Limited Petition under section 94(1)(f) of the electricity act, 2003 read with regulation 64 of Punjab State Electricity Regulatory Commission (Conduct of Business) Regulations, 2005 seeking review of order dated 07.09.2020 in petition no. 32 of 2019 and for clarification of order dated 07.09.2020 07.04.2021
 
6 Review Petition No. 06 of 2020 in Petition No.34 of 2019 GVK Power (Goindwal Sahib) Limited Petition under Section 94 (1) (f) of the Electricity Act, 2003 read with Regulation 64 of Punjab State Electricity Regulatory Commission (Conduct of Business) Regulations, 2005 seeking Review of Order dated 17.09.2020 in petition No. 34 of 2019 and for clarification of Order dated 17.09.2020. 07.04.2021
 
7 IA No. 06 of 2020 in Pt. No. 33 of 2019 Punjab Alkalies & Chemicals Limited Petition under Regulation 6(2) and Regulation 7 of PSERC (Renewable Purchase Obligation and its compliance) Regulations, 2011 for permission to carry forward the Renewable Purchase Obligation of the petitioner upto the year 2016-17 to the next Financial Year i.e. 2020-21. 23.10.2020
 
8 Petition No. 01 of 2020 M/s Green Planet Energy (P) Ltd Petition under Section 142 and 146 of the Electricity Act, 2003 read with rule 10 and 69 of the PSERC (Conduct of Business) Regulations, 2005, for taking necessary action against the respondent No. 1 for not complying with the order dated 13.01.2011 passed by the Commission in petition No. 29 of 2010 titled as M/s Green Planet Energy (P) Ltd. Vs State of Punjab and others and further for issuance of necessary directions to the respondent No. 01 to execute the necessary amendment regarding tariff approved by the Commission for the year of commissioning of the project in question i.e for the financial year 2019-2020 in petition No. 17 of 2019, in the PPA executed with the petitioner. 15.09.2020
 
9 Petition No. 02 of 2020 Everest Power Private Ltd. Petition for Business Plan including Capital investment plan for control period from FY 2020-21 to FY 2022-23 under Regulation 9 of the Punjab State Electricity Regulatory Commission (Terms and Conditions for Determination of Generation, Transmission, Wheeling & Retail Supply Tariff) Regulations, 2019. 18.09.2020
 
10 Petition No. 03 of 2020 Punjab State Power Corporation Limited Petition under Section 23 of the Electricity Act, 2003 seeking regulatory guidance for measures to be taken in case of exigencies leading to power cuts for the Year 2020-21. 20.03.2020
 
11 Petition No. 04 of 2020 Punjab State Power Corporation Ltd. Petition under Section 86 (1) (b) of the Electricity Act, 2003 read with Rule 8 of the Electricity Rules, 2005 and the Punjab State Electricity Regulatory Commission (Power Purchase and Procurement Process of Licensees) Regulations, 2012, Regulation 46 Of The Punjab State Electricity Regulatory Commission (Conduct Of Business) Regulations, 2005 and other applicable provisions for Approval of the Power Purchase Agreements (PPAs) and Procurement Process of Punjab State Power Corporation Limited related to the procurement of power from the Hydro and Nuclear Generating Stations. 08.12.2020
 
12 Petition No. 05 of 2020 A2Z Infra Engineering Limited Petition under Section 86 (1) (a) and 86 (1) (e) of the Electricity Act, 2003 read with rule 10 of the PSERC (Conduct of Business ) Regulations, 2005 for re-determination of tariff of the 15 MW Power Plant of the Petitioner situated at Nakodar after treating the project as Refused Derived Fuel (RDF) based power project and further the concession period be deemed to be started only after the date of re-determination of tariff by treating the plant as RDF based power plant. 27.08.2020
 
13 Petition No. 06 of 2020 Punjab State Power Corporation Limited Petition for the Determination of Additional Surcharge U/S 42 (4) of the Indian Electricity Act-2003 read with Regulation 27 of Punjab State Electricity Regulatory Commission (Terms and Conditions for Intra-State Open Access) Regulation, 2011 to be made applicable on to the open access consumers availing power from the sources other than PSPCL for the period 01.04.2020 to 30.09.2020. 26.08.2020
 
14 Petition No. 07 of 2020 Punjab Energy Development Agency Petition under Section 62 of the Electricity Act, 2003, Chapter VI of Conduct of Business Regulations and MYT Regulations 2014 read with other relevant provisions of the Electricity Act 2003 as well as regulations framed by the Commission from time to time, for Determination of Levellised feed in Tariff in terms of Pradhan Mantri KisanUrja Suraksha evam Utthaan Mahabhiyaan (PM-KUSUM) Scheme for Solarisation of 3900 Grid connected agriculture pumps in the State of Punjab under Component –C of the ibid scheme, for sale of surplus power generated by solar PV array of 4 KW for 3 HP capacity Pump,7KW for 5 HP and 10 KW for 7.5 HP grid connected agriculture pumps after meeting power requirements for irrigation of agriculture land. 15.10.2020
 
15 Petition No. 08 of 2020 Punjab Energy Development Agency Petition for Determination of Levellised Generic Tariff in terms of Pradhan Mantri Kisan Urja Suraksha evam Utthaan Mahabhiyaan (PM-KUSUM) Scheme for setting up of grid connected solar power plants of individual capacity ranging between 500KW to 2MW in the State of Punjab under Component–A of the ibid scheme for sale of solar power generated thereof to the DISCOM in the State of Punjab. 09.10.2020
 
16 Petition No. 09 of 2020 M/s Shiva Castings Pvt Ltd Petition under Regulation 68,69 and 71 and provisions of Chapter XI of PSERC (Conduct of Business) Regulations 2005 as amended up to date, Regulation 43 of Open Access Regulations and other relevant rules and regulations as approved by Commission and read with the relevant provisions of the Electricity Act, 2003 for setting aside or modifying its letter no. 1481 dated 17.12.2019 sent by the Respondent No. 01 to the petitioner whereby, UI charges imposed vide supplementary bill dated 27.08.2018, amounting to Rs. 1554910/- (Based on letter No. 930 dated 06.04.2018 issued by Sr. Xen/CBC, Ludhiana. 01.10.2020
 
17 Petition No. 10 of 2020 Suo-Motu Provisional Annual Fixed Cost for MYT FY 2020-21 to FY 2022-2023 - Everest Power Private Limited 20.03.2020
 
18 Petition No. 11 of 2020 Suo-Motu Directions issued, vide letter No. 01/04/2020-EB(PR)/180-182 dated 30.03.2020, by the Govt. of Punjab, Department of Power under Section 108 of the Electricity Act, 2003 to specify a reduced rate (subject to maximum 6% per annum) of late payment surcharge(LPS) for payment which becomes delayed beyond the due date during the period from 24.03.2020 to 30.06.2020 to the Generating Companies or Transmission licensee, treating the restrictions imposed by the Central and State Government to contain COVID-19 as an event of Force Majeure. 10.07.2020
 
19 Petition No. 12 of 2020 Suo-Motu Due to the unprecedented conditions in view of the force majeure situation arising due to severe restrictions on movement of public in the State due to the spread of COVID-19 and to continue supply of electricity being an essential service, in the larger public interest, Govt. of Punjab, Department of Power has issued directions vide letter No. letter No. 01/04/2020-EB(PR)/185-186 dated 07.04.2020 to the Commission under Section 108 of the Electricity Act, to exempt the fixed charges for medium supply (MS) and large supply (LS) industrial consumers for the next 2 months from 23.03.2020 and to fix energy charges to commensurate with reduction in fixed charges (single rate) and further directing to reduce the Renewable Purchase Obligation (RPO) for year 2019-20 and 2020-21 by 1.50% and 2.00% respectively. 17.07.2020
 
20 Petition No. 13 of 2020 Suo-Motu Extension of the period of applicability of (i) the CERC RE Tariff Regulations, 2017 adopted by the Commission vide Order dated 31.10.2017 in petition no. 50 of 2017 (Suo-Motu) and (ii) the levellised generic tariff for RE projects for FY 2019-20 issued vide Order dated 13.09.2019 in petition no. 17 of 2019 (Suo-Motu). 14.04.2020
 
21 Petition No. 14 of 2020 GVK Power (Goindwal Sahib) Limited Petition for approval of Aggregate Revenue Requirement and determination of tariff for sale of energy generated by 2X270 MW Goindwal Sahib Thermal Power Plant at Goindwal Sahib, Punjab for the control period FY 2020-21 to 2022-23 in terms of Section 62 ,Section 86 and Section 94 of the Electricity Act 2003 along with "Punjab State Electricity Regulatory Commission (Terms and Conditions for Determination of Generation, Transmission, Wheeling and Retail Supply Tariff) Regulations, 2019” (PSERC MYT Regulations 2019). 26.10.2021
 
22 Petition No. 15 of 2020 GVK Power (Goindwal Sahib) Limited Petition under Section 33 read with Section 86 of Electricity Act 2003 and Regulation 14.1.6 of Punjab State Electricity Regulatory Commission (Punjab State Grid Code) Regulations, 2013 challenging the arbitrary and unreasonable actions of Punjab State Load Dispatch Centre in refusing the availability declaration of by GVK Power (Goindwal Sahib) Limited for its 2 x 270 MW Thermal Power Plant and notifying the declared capacity as zero in the State Energy Account from 30.03.2020 till date. 08.09.2020

22.07.2022
 
23 Petition No. 16 of 2020 Everest Power Private Limited Petition for approval of the Annual Fixed Cost for 100MW Malana II Hydro-Electric Project for Multi Year Tariff (MYT) Control Period (FY 2017-18 to FY 2019-20) for True-up of FY 2017-18 & FY 2018-19 andRevised estimates for FY 2019-2020under Section 62 and 64 of the Electricity Act. 2003 read with Regulation 63 of PSERC (Terms and Conditions for Determination of Generation, Transmission, Wheeling and Retail Supply Tariff), Regulations, 2014 and Multi Year Tariff (MYT) for 2ndControl Period (FY 2020-21 to FY 2022-23) based on Capital Investment Plan order of PSERC under Section 62 and 64 of the Electricity Act. 2003 read with Regulation 60 of PSERC (Terms and Conditions for Determination of Generation, Transmission, Wheeling and Retail Supply Tariff), Regulations, 2019. 09.03.2021
 
24 Petition No. 17 of 2020 Punjab State Power Corporation Ltd Petition under Section 86 (1) (b) of the Electricity Act, 2003 Read with Rule 8 of the Electricity Rules, 2005, Punjab State Electricity Regulatory Commission (Power Purchase and Procurement Process of Licensees) Regulations, 2012; Regulation 46 of the Punjab State Electricity Regulatory Commission (Conduct of Business) Regulations, 2005; and Punjab State Electricity Regulations, 2011 and other applicable Regulations. 16.12.2020
 
25 Petition No. 18 of 2020 M/S Vardhman Polytex Limited Petition under Section 68,69,70,71 and 72 and other relevant provisions of Chapter XIII of the Conduct of Business Regulations 2005 as amended up to date and other relevant rules and regulations as approved by the Commission including Conditions No. 24 of General Conditions of Tariff contained in Tariff Order for 2018-19 and read with the relevant provisions of the Electricity Act 2003. 23.10.2020
 
26 Petition No. 19 of 2020 M/s Waterman Plastic Industries Petition under section 142 of the Electricity Act, 2003 for taking action against the respondents for intentionally violating the Order dated 26-05-2016 passed by this Commission in petition No.37 of 2016 and for directing the respondents to give supply to the petitioner for his continuous process industry as per the order of the Commission. 07.09.2020
 
27 Petition No. 20 of 2020 Punjab State Power Corporation Limited Petition under Regulation 71 ( power to remove difficulty) of PSERC (Conduct of Business) Regulations, 2005 for Clarification regarding criterion for allowing reduced rate for consumption above threshold limit in case of change in category from General Industry to Power Intensive Industry- Tariff order for FY 2016-17 & FY 2017-18. 10.09.2020
 
28 Petition No. 21 of 2020 Punjab State Power Corporation Limited Petition under Section 61,62 and 86 and Regulation 20 Punjab State Electricity Regulatory Commission (Grid Interactive Rooftop Solar Photo Voltaic Systems based on Net Metering) Regulation, 2015. 11.01.2021
 
29 Petition No. 22 of 2020 Residents of Shivalik City, Kharar Petition under Section 43 of E.A 2003 read with Supply Code (2014) Reg 5.1 in the matter refusal by the Licensee to release electricity connections to some residents of Shivalik City, Kharar, Distt Mohali. 30.09.2022
 
30 Petition No. 23 of 2020 Rajeev Sood Clarification with regard to implementation/interpretation of regulations with regard to payment of interest on meter and ACD security (consumption) i.e 17.1 to 17.4 of Supply Code, 2007 and Regulations 17.1, 17.3 of Supply Code 11.09.2020
 
31 Petition No. 24 of 2020 Ambuja Cements Limited Petition for consideration of Capping of RPO Rate of FY 2015-16 for FY 2018-19, FY 2019-20 and FY 2020-21 and onwards. 07.01.2021
 
32 Petition No. 25 of 2020 M/s Arora Iron & Steel Rolling Mills Pvt. Ltd Petition under Section 142 of the Electricity Act, 2003 read with Regulation 2.41 of PSERC (Forum and Ombudsman) Regulations, 2016 and Regulation 60 and 61 of PSERC (Conduct of Business) Regulations 2005 for the Respondent’s willful and deliberate non-compliance of Consumers Grievance Redressal Forum Ludhiana’ Order dated 16.09.2019 in Case no. CGL-150 of 2019 and further for issuance of necessary directions to the respondents to refund the amount on account of threshold consumption rebate as per Order dated 16.09.2019 of CGRF alongwith penal interest for the period of delay in refund/adjustment. 08.12.2020
 
33 Petition No. 26 of 2020 Suo Motu Adoption of the Central Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2020 and Determination/Fixation of levellised generic Tariff for various Renewable Energy Technologies/ Projects for the year 2020-21. 18.09.2020
 
34 Petition No. 27 of 2020 M/s Sushma Buildtech Ltd Petition in the matter of non compliance of Supply code (2014) Reg. 6.6.2 & Reg. 6.7.1 (a) regarding issue of NOC for Supply of Electricity to the petitioner’s Shopping Complex/Commercial Building/Mall. 28.10.2020
 
35 Petition No. 28 of 2020 Punjab State Power Corporation Limited Petition under Section 61, 62 and 86 of the Electricity Act, 2003 for amendment in Regulation 55 and Appendix-7 of the Punjab State Electricity Regulatory Commission (Conduct of Business) Regulations, 2005 regarding Fuel Cost Adjustment Surcharge. 16.12.2020
 
36 Petition No. 29 of 2020 Punjab State Power Corporation Limited Petition under Section 86 (1) (B) of the Electricity Act, 2003 seeking approval of Procurement of 500 MW Wind-Solar Hybrid Power from SECI Limited on Long Term Basis in accordance with the Power Sale Agreement dated 03.01.2020. 21.10.2020
 
37 Petition No. 29 of 2020 & IA No. 09 of 2019 Punjab State Power Corporation Limited Petition under Section 86 (1) (B) of the Electricity Act, 2003 seeking approval of Procurement of 500 MW Wind-Solar Hybrid Power from SECI Limited on Long Term Basis in accordance with the Power Sale Agreement dated 03.01.2020. 01.02.2021
 
38 Petition No. 30 of 2020 Punjab State Transmission Corporation Limited Petition under Regulation-9 of PSERC (Terms and Conditions for determination of Generation, Transmission, Wheeling and Retail Supply Tariff) Regulations, 2014 and Section 40 of the Electricity Act, 2003 -seeking regulatory approval for system improvement initiatives for 400 kV transmission network for the year 2020-2023 – construction of 400 kV substation at Ropar through open tender without going into TBCB. 29.10.2020
 
39 Petition No. 31 of 2020 Punjab State Power Corporation Limited Amendment in the Regulation 31.8 of Electricity Supply Code and Related Matters Regulations, 2014 regarding reduction in the interest rate on Advance payment of Electricity Bills deposited by the consumers. 21.10.2020
 
40 Petition No. 32 of 2020 Suo Motu Determination of Additional Surcharge under Section 42 (4) of the Electricity Act, 2003, read with Regulation 27 of the PSERC (Terms and Conditions for Intra-state Open Access) Regulations, 2011 to be made applicable on the open access consumers availing power from the sources other than Punjab State Power Corporation Limited from 01.10.2020 to 31.03.2021. 30.09.2020
 
41 Petition No. 33 of 2020 GVK Power (Goindwal Sahib) Limited Petition for Annual Performance Review of 2X270 MW Goindwal Sahib Thermal Power Plant at Goindwal Sahib, Punjab for the FY 2019-20 in terms Punjab State Electricity Regulatory Commission (Terms and Conditions for Determination of Generation, Transmission, Wheeling and Retail Supply Tariff) Regulations, 2014 (PSERC MYT Regulations 2014). 22.12.2020
 
42 Petition No. 34 of 2020 GVK Power (Goindwal Sahib) Limited Petition for approval of the Capital Investment Plan and Business Plan for 2X270 MW Goindwal Sahib Thermal Power Plant at Goindwal Sahib, Punjab for the Control period FY 2020-21 to 2022-23 under Regulation 9 of the Punjab State Electricity Regulatory Commission (Terms and Conditions for Determination of Generation, Transmission, Wheeling and Retail Supply Tariff) Regulations, 2019 (PSERC MYT Regulations 2019). 04.01.2021
 
43 Petition No. 35 of 2020 Punjab State Power Corporation Limited Petition for the Determination of Additional Surcharge U/S 42 (4) of the Electricity Act-2003 read with Regulation 27 of the Punjab State Electricity Regulatory Commission (Terms and Conditions for Intra-State Open Access) Regulations, 2011 to be made applicable on to the open access consumers availing power from the sources other than PSPCL for the period 01.10.2020 to 31.03.2021. 09.12.2020
 
44 Petition No. 36 of 2020 Punjab State Power Corporation Limited Petition under Section 86 (1) (b) and (e) of the Electricity Act, 2003 read with Punjab State Electricity Regulatory Commission (Power Purchase and Procurement Process of Licensees) Regulations, 2012, Regulation 46 of the Punjab State Electricity Regulatory Commission (Conduct of Business) Regulations, 2005; and Punjab State Electricity Regulatory Commission (Renewable purchase obligation and its compliance) Regulations, 2011 and other applicable Regulations. 25.03.2021
 
45 Petition No. 37 of 2020 Punjab State Transmission Corporation Limited Petition under Regulation-9 of the PSERC (Terms and Conditions for determination of Generation, Transmission, Wheeling and Retail Supply Tariff) Regulations, 2019 and Section 40 of the Electricity Act, 2003-for improvement initiatives to be taken up for transmission network. 08.01.2021
 
46 Petition No. 38 of 2020 M/s VN Sharma Builders Pvt. Ltd Petition under Section 142 of E.A 2003 read with Reg 2.41 of (Forum and Ombudsman) Regulations 2016 in the matter of Non compliance of the orders of CGR Forum PSPCL Patiala in the case nos. GCP-224/2019 and CGP 225/2019 of the petitioner. 03.12.2020
 
47 Petition No. 39 of 2020 Omaxe Resident Welfare Association Petition under Section 142 of E.A 2003 - Terminate the Model Agreement between PSPCL and M/s Omaxe Chandigarh Extension Developers Pvt. Ltd. and handover of the Electricity Supply in the hands of the PSPCL (as per clause 20 of the agreement) and to issue a separate receipt for the payment of electricity bill instead of issuing a combined receipt of Electricity, Water and CAM Charges as is a current practice of PSPCL. 14.12.2020
 
48 Petition No. 40 of 2020 G.O. Steel Pvt Ltd Petition under Section 142 and 146 of the Electricity Act, 2003 for taking necessary action against the respondents for violating the provisions of Regulation 6.3, 9.13 and 9.2 of the Punjab State Electricity Regulatory Commission (Electricity Supply Code and Related matters) Regulations, 2014 (hereinafter to be called supply Code – 2014) and further for seeking directions to the PSPCL to comply with the clause 9.1.3 and 9.2 of the Supply Code – 2014 and release the extended load of the petitioner through idle circuit of Double Circuit 66 kV line already existing near the factory of the petitioner, in the interest of justice. 23.12.2020
 
49 Petition No. 41 of 2020 M/s Indian Sucrose Limited Petition under Section 86(1) (f) of the Electricity Act, 2003 read with Rule 10, 69, 71 and 73 of the PSERC (Conduct of Business) Regulations, 2005 read with Section 94 of the Electricity Act, 2003, for setting aside/quashing of the order/letter dated 08.10.2020 issued by the respondent No.1/Punjab State Power Corporation Ltd. vide which the Power Purchase Agreement (PPA) dated 23.12.2016 and Supplementary PPA dated 05.02.2019 executed between the petitioner and PSPCL for sale of upto 30 MW surplus power to PSPCL from petitioner Company’s Non-Fossil fuel based 40 MW Co-generation Power Project has been wrongly and illegally terminated and for extension of period of commissioning of the project upto 31.10.2021 with applicable tariff of Rs. 6.22 per kWh. 12.04.2021
 
50 Petition No. 42 of 2020 M/s Sushma Buildtech Limited Petition under Regulation 4.2,6.6.2,44,45 and 47 of the Supply Code 2014 and Regulation 13 and 24 of the General conditions of tariff contained in tariff order for the year 2020-21 passed by the Commission and other relevant rules and regulations as approved by the Commission including 68,69,70,71 and 72 and other relevant provisions of Chapter XIII of the Conduct of Business Regulations 2005 as amended up to date for Setting aside the Order dated 21.10.2020 passed by the respondent-PSPCL, whereby, the Respondent has wrongly rejected the request of the Petitioner to grant NOC/Electricity connection at 11 KV system of PSPCL 02.06.2021
 
51 Petition No. 43 of 2020 Punjab State Power Corporation Limited Petition seeking additional time for filing of True-up petition for the FY 2019-20, Annual Performance Review for FY 2020-21 and Revised estimates for FY 2021-22 till December 22, 2020 (i.e on or before December 22,2020) under Regulation 11 of the Punjab State Electricity Regulatory Commission (Terms and Conditions for Determination of Generation, Transmission, Wheeling and Retail Supply Tariff) Regulations, 2019 (PSERC MYT Regulations, 2019) 01.12.2020
 
52 Petition No. 45 of 2020 Suo-Motu Petition No.45 of 2020 filed by Punjab State Power Corporation Limited for True-Up Of FY 2019-20, Annual Performance Review for FY 2020-21 and Approval of Revised ARR Forecast And Determination Of Tariff for FY 2021-22. 17.11.2021
 
53 Petition No. 48 of 2020 Residents of Gulmohar Residency Petition under Section 43 of E.A 2003 read with Supply Code (2014) Reg 5.1 in the matter of refusal by the Licensee to release electricity connections to the residents of Gulmohar Residency Section 116 Mohali. 24.08.2022
 
54 Petition No. 49 of 2020 Punjab State Power Corporation Ltd Petition for deferment of revision of Security (Consumption) for all categories of consumers till 31st March 2021 in public interest due to impact of COVID-19 pandemic under Regulation 47 of Supply Code-2014 and Regulation 69,70,71 & 72 of chapter XIII of the conduct of Business Regulations 2005. 09.04.2021
 
55 Petition No. 50 of 2020 Nabha Power Limited Petition under Section 86(1)(b) read with 86(1)(f) of the Electricity Act, 2003 and Article 13 of the Power Purchase Agreement dated 18.01.2010 (PPA), for the approval and consequent compensation due to a ‘Change in Law’ event, viz., the increase in water charges payable under the Northern India Canal and Drainage Act, 1873 vide notification dated 23.01.2020, impacting the revenues and costs of the petitioner during the Operating Period under the PPA. 06.08.2021
 
56 Petition No. 51 of 2020 Punjab State Power Corporation Limited Petition for revision of Schedule of General Charges recoverable from the applicants/consumers seeking electricity connections/services from PSPCL under Section 181 (u) of Electricity Act-2003, Regulation 47 of Supply Code-2014 and Regulation 69, 70, 71 & 72 of chapter XIII of the conduct of Business Regulations 2005 21.12.2022